Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC KACHIRAYIL KARTHIKAPURAM PO | L1 | Accepted-AOC Lowest amount quoted by Santo K.J | |
| 2 | L2₹1.7 L+₹959.41 (0.57%)Rejected-AOC | L2 | Rejected-AOC Lowest amount quoted by Santo K.J |
| Sl No | Description | Qty | Unit | P.G CONSTRUCTIONS L2 | SANTO K J L1 |
|---|---|---|---|---|---|
| 1.00Maintenance | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.41 | cum | 335.74 ₹3,160.32 | 335.5 ₹3,158.06 Lowest |
| 1.00 | OD265161/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 35.45 | cum | 3,727 ₹1,32,122.15 | 3,700 ₹1,31,165 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.37 | sqm | 360 ₹1,573.2 Lowest | 360 ₹1,573.2 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 120.84 | kilogram | 104 ₹12,567.36 Lowest | 104 ₹12,567.36 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.01 | cum | 9,789 ₹19,715.05 Lowest | 9,789 ₹19,715.05 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,232
Closing Date
17 Oct 2025, 10:00 amClosed
Assistant Engineer
O/o Assistant Engineer LID EW Udayagiri
Annual Plan-Project No. 129/2025-26-Construction of compound wall for Karthikapuram Anganavadi Building in Udayagiri GP-General Civil Work
2025_LSGD_806811_4
AE/UDYGP/TN/6/25-26 dtd 08.10.2025
Open Tender
Civil Works - Buildings
Item Wise
Udayagiri GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹555
Yes
₹4,232
Yes
2 Dec 2025
8 Oct 2025
18 Oct 2025
8 Oct 2025
17 Oct 2025
8 Oct 2025
Amount
Maintenance
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD265161/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
P.G CONSTRUCTIONS (BID ID -2394317)
Bidder Name
P.G CONSTRUCTIONS
SANTO K J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1344229.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .