Dy.Minicipal Commissioner - West Zone
Water pipe line upgradation, pressure related and pollution related wons at diff. Chalis dift. GHB Varahat and dith 7. p.road in Naranpura ward in west zone
281891
8/25-26 (T.N.69)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Yes
Municipal Commissioner, Ahmedabad
₹8,500
Yes
3 Mar 2026
3 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Total Amount Rs.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.8500/- (Demand Draft or pay order in favour of Municipal Commissioner,
Ahmedabad /) To be submitted as below. Demand Draft or Bank Guarantee shall be
from Nationalized Bank / Sheduled Bank and valid for 120 days. (As per Latest AMC
finance dept.circular).
7 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee/ Demand
Draft / Local MICR Cheque. & attched ANNEXURE - 1 finance dept.circular No-
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner, Ahmedabad)
(Non refundable)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with Tender as
Tender Fees described in the invitation of tender and submitted to Assistant Manager (west
zone),Ahmedabad Municipal Corporation, West Zone, Zonal Office", Dr.
Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad.
10 Tenders issue date Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER NOTICE
11 Last Date of Submission of Dt.06-03-2026 upto 18:00 hrs As per Notice inviting Tender / Addendum /
the Corrigendum.. The tenders received after latest schedule date and time will not
Tender be entertained under any circumstances.
12 Tender Documents Dt.07-03-2026 upto 12:00 hrs to Assistant Manager / Dy.C.E.(W/Z) office, 2nd
Submission Floor, Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013
13 Date of Opening Dt.07-03-2026 upto 15:00 hrs As per Notice inviting Tender / Addendum /
Corrigendum (only Techanical Bid) to Assistant Manager / Dy.C.E.(W/Z) office,
2nd Floor, Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013
14 Mode of sending the Document shall be physically submitted in sealed envelope By RPAD/Speed
Tender Documents and post/ Hand Delivery in sealed covers in Duplicate (One Original & One
evalution of tender Duplicate) duly sign & seal by contractor
Tenders received without EMD shall be considered as Non-Responsive and
shall be rejected outright.
15 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall be
Specification applicable..
16 Defect &Liability PeriodThe contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the period
mentioned hereunder from the certified date of completion, The within 15 days
of receipt of the notice. In the case of failure on the part of the contractor, the
Engineer-in-charge may rectify or remove or re-execute the work at the risk &
cost of the contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards the expenses,
if any, Incurred by him in rectification, removal or re-execution. The Defects
Liability period shall be as under(a) for all works costing upto Rs. 50,000 (
amount put to tender), the period shall be 3 months from the certified date of
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put
tender), the period shall be 6 months from the certified date of completion or
one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
17 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or major of
parts of work part thereof of any amount, the contractor shall be bound to start the works
within 48 hours of intimation of work. Communication done telephonically
via Calls,SMS, Via Whatsapp and through letter / E-mail shall be considered
legal and binding for the same. Failure of comply to start the works in
hours of intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto 30 Lakhs),
(3) Rs.5000 per day (for all tenders amounting above 30 Lakhs). Three times
failures by contractor shall make contractor responsible to be black listed
unless and otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the Final
Submission Time And Date. The Same Shall From a part Of Tender And The
Same As to be Attached Along With The Tender Document.
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST 18% GST will be paid extra by AMC/Authority at prevailing rate to the
22 Municipal Commissioner reserves the rights to reject any or all the tenders without assigning any
reasons thereof.
23 Conditional tenders will not be accepted.
24 Mobilization advance will not be given.
25 Contractor has to provide more than one number of gangs as per the works allotted and in case of non
providing of gangs and machinery at all sites at given time shall be treated as delayed by contractor
and penalty shall be levied on per day delay as mentioned as above.(the amounr shall be as instructed
earlier based on the tender amount)
26 The staff of the contractor shall wear safety jackets,hoes, helmets etc. while on duty and any violation
will attractfineofRs. 5,000/-foreach incident. Failure to erect safety signage or trying to carry out the
works with out proper precautions/safety measures as required will attract a fine of Rs.5,000/-for each
27 The contractor shall adhere to the maintenance schedule outlined in the tender documents and comply
with the prevailing AMC circulars issued from time to time.
Seal and Signature of the Bidder Add. City Engineer
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March- 31, 2022. The validity
cut-off date in the GR is with respect to the date of issue of Bank Guarantee irrespective of the date of termination of
Bank Guarantee. Guarantees issued or Authorized by Ahmedabad Branch Only.
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites sealed Tender
document from reputed and qualified bidders for the construction of Works detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No. value of works Money Period
(Rs.) Deposit (Rs.)
1 Labour work for Water Rs. 8,33,054.50 Rs.8500/- 12 Months
Pipeline Upgradation,
pressure related and
Pollution related work at
Diff.Chalis,diff.GHB
vasahat and Diff.T.P.road
in Naranpura ward in west
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 900.00 in the form of Demand Draft / Pay Order
from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable at Ahmedabad, which
shall be non refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the above
Table payable at Ahmedabad and drawn in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable at
Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr. Ramanbhai Patel
Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal Corporation, 2nd Floor,
Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
in the presence of bidders or their representatives who choose to attend. In the event of the specified date of bid
submission/opening being declared a holiday for the Employer, the bids shall be received /opened on the next
working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender fee & EMD (Draft
/DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope (marked as
“original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand Delivery in duplicate. The
Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received for the package
(except those received late) containing the sealed Tender volume and other enclosures then announce the names of
bidders in the presence of bidders or their representatives who choose to attend on the date and time mentioned in
the NIT In the event of specified date of bid opening being declared as a holiday for the Employer, the Tender will be
opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the opening will
announce bidder’s names, , the presence/or absence of EMD, the amount and validity of EMD furnished with each
bid, is valid registration and such other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for Bid and has
not been furnished in the form, the bid shall be rejected by the Employer as non-responsive and the Tender volume
will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD will be
taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be rejected as non-
responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed, meets
the eligibility and qualification criteria, has the required available bid capacity, is accompanied by the
requisite certificates, undertaking and other relevant information specified in the bid documents and is
substantially responsive to the requirement of the bidding documents and provides any clarification for
ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not subsequently be
made responsive by correction or modification or withdrawal of the nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance with
Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time. In the
event of specified date of bid opening being declared bidders who qualify the criteria then bidder bid will be
considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that such
bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General Terms
and Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter
shall name the sum which the Employer will pay the Contractor in consideration of the execution,
completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving letter of Indent.
Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion, ask any
bidder for authentication the correctness of the information/details furnished by him in his bid. Such request
by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from the time
of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own
responsibility all information that may be necessary for preparing the bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its premises and
lands for the purpose of such inspection, but only upon the express condition that the bidder, its personnel and
agents, will release and indemnify the Employer and its personnel and agents from and against all liability in respect
thereof and will be responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for the
construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in the table given
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E2" class and or equivalent. If contractor
is not registered with AMC in the relevant class, on award of contract he shall be required to register himself with
AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the Employer shall
reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to provide
evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown, produced or
manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
General information
All individual firms must complete the information in this form. Nationality information shall be provided for all owner(s)
or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non-performance of the contractor, consistent history of litigation awarded against the applicant
or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only in E-
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only in E-
Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or false
representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint venture. A
bidder who submits or participates in more than one bid for a contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply with the
requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which are not substantially
responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the Employer shall
be written in the English language. Supporting documents and printed literature furnished by the bidder may be in
another language provided they are accompanied by an accurate translation of the relevant passages in the English
language, in which case, for purposes of interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as described in bidding
documents, based on the percentage rate amount in the Bill of Quantities submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and words) for
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and words) for
overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission specified in
Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may request the
bidders to extend the period of validity for a specified additional period. The request and the responses thereto
shall be made in writing or by fax. A bidder may refuse the request without forfeiting his bidder agreeing to the
request will not be required or permitted to modify his bid but will be required to extend the validity of his Bid
Security for the period of the extension, and in compliance with Clause 2 ( Financial Terms & Conditions) in all
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly authorized to sign
on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions issued by the
Employer, or as necessary to correct errors made by the bidder, in which case the person or persons signing the
bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date specified in the
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the Employer
will direct him to submit the Performance Security and attend the Employer's office on a date determined by the
Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high quality work
within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and medium, so as
to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and extended time
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer will
declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract by
AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in
corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by which they
improperly and unlawfully enrich themselves and/or those close to them, or induce others to do so, by misusing
the position in which they are placed, and it includes the offering, giving, receiving, or soliciting of anything of
value to influence the action of any such official in the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement process or the
execution of a contract to the detriment of the Borrower, and includes collusive practice among bidders (prior to
or after bid submission) designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without assigning any
reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material misrepresentation or
provided fraudulent information / statement, the said Bidder will be liable for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender volume is
submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are conditional
tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws as well as
framed from time to time). Any penalties laid due to violation of such laws shall be directly deducted from the
contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e. public and
vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic signs as per design,
safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to be provided so that it should
be visible at night. During night working hours safety in charge personnel shall be provided with florescent jackets.
This shall be Provided at no extra cost by the bidder under attaché with specified in the tender documents under
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new connection on
behalf of AMC. It includes filling the necessary application to power Supply Company, follow up and getting the
supply, filling the necessary test reports to the power supply company. All official fees including security deposits and
other expenses shall be of initially paid by the contractor. AMC may support to get the temporary connection and
may at its diseretien get the same converted to permanent connection at the same of AMC if desired do,and
contractor shall as no extra cost support the same. In this case AMC my be as the remaining cost subject to
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon any
agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty shall give the
Municipal Commissioner the right to cancel the contract or to take any other measure as the Municipal
Commissioner may deem fit. The warranty does not apply to commissions payable by the contractor to establish
commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or to any
benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under this Contract
against the contractor the same may be deducted by the Municipal Corporation from any sum then due or which at
any time thereafter may become due to the contractor under this contract and failing that under any other
contract with the Municipal Corporation or from any sum due to the contractor with the Municipal Corporation
(which may be available with Municipal Corporation), or from his retention money, or he shall pay the claim on
demand. The Municipal Corporation reserves the right to carry out post payment audit and technical examination of
the final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when detected not
withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of any work done
by the Contractor or alleged to have been done by him under the contract, it shall be recovered by the Municipal
Corporation from the contractor by way of all the means prescribed above or if any under payment is discovered by
the Municipal Corporation, any amount due to the contractor under this contract or under payment may be
adjusted against any amount then due or which may at any time thereafter become due before payment is made to
the contractor from him to the Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become liable and which
is chargeable to the contractor, the owner shall have the right to retain out of any payment then due or thereafter
to become due an amount sufficient to completely indemnify the owner against such lien or claim or if such lien or
claim be valid the owner may be or become due and payable to the contractor. If any lien or claims remaining,
unsettled after all payments are made, the contractor shall refund or pay to the owner all money that the latter
may be compelled to pay in discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum before submission of tender duly
filled in by the contractor. Therefore, the contractors shall have to kindly refer the tender for such addendum or
corrigendum published by AMC through its website www.amc.nprocure.com & www.nprocure.com 48 hours prior to the
deadline of submission of the tender. Tenderers shall verify the number of addendum issued and enclose the same with
the tender documents , failing which the tenders shall be liable for rejection and no any complaint in respect to this shall
be entertained under any circumstances.
Seal and Signature of the Bidder Add. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer will in no
case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for 28 days
beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly as Early as
possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the bidder has
furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the
form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5% (five percent) of the
Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a policy is
framed by Audit department of AMC to charge 4% interest for the balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per format shall be
issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along with release
of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. & As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding GST) etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be deducted
against works welfare cess.
Seal and Signature of the Bidder Add.City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any other state Govt.
or institutions. Copy of registration should be attached with tender document. Tenderer who was not registred in AMC
must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department with the correction
slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2 liquidated damages for delay shall be
overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the Engineering in
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as reference to the
latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific mention for a
particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the following limits
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its specifications shall be deemed
to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall not absolve the
contractor from the responsibility of replacing defective materials brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect before using them in
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from the site of work
within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines, levels,
alignment of the works & all precautionary measures during execution shall have to be kept in sufficient numbers and in
good working condition at the site of the work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be adopted by the
contractor shall be considered only if the contractor provided satisfactory evidence that such special mode of
construction and completion of work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse effect and concordance of
adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor Mineral Act", and
such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian Standard) shall be
taken to engrave the safety of men, materials and machinery on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of actual work for
which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be executed & as per the
instruction of Engineer in charge & as per the guidance of AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor. The contract
agreement shall have to be executed between AMC & the agency to which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order shall be issue to contractor and
the time limit shall be start from the date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall be issue to contractor and
the time limit shall be start from the date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft / cheque or Bank
Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract paper with AMC. The
contractor shall be fined 4% of interest per year for delay in submission of S.D and shall be deducted from contractor’s
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or His Designeted
Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification and the Engineer -in-
charge shall make such corrections and interpretations as necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will be payable by the
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the rates keeping in
view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the construction of the
works and provide a satisfactory supply of potable water for drinking, washing, sanitation and cleaning down. The
contractor will be responsible for all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate removal of any distribution
system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must make his own
arrangements with the Corporation and Electricity Supply Authorities and with other contractors to connect and to take a
supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the work and shall
pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work. No
compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria mentioned above along
with the bid. They shall have also to submit the income tax clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government approved licensed electrical
person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of work
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of work
increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be rejected. Municipal
Commissioner reserves the right to increase/decrease the scope of work. No any claim to that effect shall be entertained.
The Municipal Commissioner also reserves the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason (like site is not
available and due to unavoidable circumstances arise), after evaluation of situation the actual date of starting of work
will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Add City Engineer (W.Z.)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION ENGINEER
DEPARTMENT - WESTZONE
TECHNICAL SPECIFICATION
Nameof Work :- Labour work for Water Pipeline Upgradation, pressure related
and Pollution related work at Diff.Chalis,diff.GHB vasahat and Diff.T.P.road
in Naranpura ward in west zone.
GeneralTechnicalSpecificationSection
FollowingtechnicalspecificationsshallbeapplicabletotherelevantitemsofBOQ
Item No.1 :-Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-9 pipes of various classes with
CI/DI/MS specials of following diameters. Rate includes excavation upto minimum 1.0 mt. depth from top of
pipe / as per requirement in any soil, refilling after layingpipe, covering andtemptationofcarting surplusearth
upto30 mt.lead and watering and compaction. Clearing the site. All Joints shall be made tight & leak free etc.
Modeof measurement
MeasurementshallbepaidbyRmt.basis.
Item No.2 :-Only Removing & recover of existing CI/DI pipe line & Specials, removing any type of joint , carting it to the Muni.
Stores as & where directed as per instruction of Engg. In charge with excavation & refilling.
Labour charges for OnlyRemoving &recover of existing CI/DIpipe line & Specials, removing any type of joint
carting it to the Muni. Stores as & where directed as per instruction of Engg. In charge with excavation &
Modeof measurement
MeasurementshallbepaidbyRmt.basis.
Item No.3 :-Removing & relaying of existing CI/DI pipe line & Specials, Cleaning of pipe & Specials from Inside, including
excavation, refilling etc. comp. in line & level with any type of joints as per instruction of engg. in charge.
Labour charges for recovering & cleaning C.I. Water pipe line & relaying the same incl. excavation & refilling
and Jointing pipe in line and level etc. comp. As directed.
Modeof measurement
MeasurementshallbepaidbyRmt.basis.
Item No.4 :-Labour charges for installing and jointing Sluice Valves including loading, transporting from owner's store,
lowering in location to the required with excavation refilling alignment by crane/ tripod and chain block
including cost of total nos. of nuts, bolts, Necessary gaskets and excluding fixing of tail pieces with lead & jute
etc complete as directed by Engg. in charge.
Modeof measurement
MeasurementshallbepaidbyNo.basis.
Item No.5 :-Labour Charges forremovingand recover of ex.C.I.Sluice valve with tailpieces andcartingit up to Muni.Store or site
as per instrction of Engg. In charge item include. necessary Excavation, removing or making joints, refilling
etc.comp. as directed by Engg in charge.
Modeof measurement
MeasurementshallbepaidbyNo.basis.
Item No.6 :-Cutting of existing pipelines of following diameters including carting of nece. specials from AMC store to site and
from site to AMC store (recovered materials) nace. labours for excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes electric cutter, dewatering pump fuel and transportation of
machineries, chain pulley block if requires working at an instructed specific time of day or night etc. complete.
Modeof measurement
MeasurementshallbepaidbyNo.basis.
Item No.7 :-Labours charges for collecting specials from Municipals store loading , transportation, unloading to the site, laying
and fixing CI specials inclusive of all jointing materials like lead, spunetc.andlabour,exacavation re-fillingand
nece.dewateringasper instrucationof engg. incharge.
Modeof measurement
Measurementshallbegiveninkg.Basis.
Item No.8 :-Labour charges for recovering CI specials from old line by heating the old joints by gas / any heating device and
recovering the fittings in re-usable condition and loading, carting, unloading them to nearby Municipal stores.
Modeof measurement
Measurementshallbegiveninkg.Basis.
ItemNo.9:-FixingofvalveRoadboxincl.locatingvalve,nece.excavation,BrickMasonary,PCCwork.
ItemalsoincluescartringformAMCstoretosite.Etc.Comp.asdirected.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.10 :-Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with specials incl. required
materials such as jute and lead etc , nece. excavation in any type of soil, refilling, nacessary trust block
etc.comp. as per instruction of engg.in charge.(Joint reparied under this item should not be paid in next four
months under normal condition)
Modeof measurement
MeasurementshallbegiveninPerJointBasis.
Item No.11 :- Excavation for trail pit of maximum diamension of 1.5 mt x0.75 x 1.5 mt depth for location of existing
lineincludingexcavation but excluding cost asphalt cuttingbutincludingrefilling, watering etc. comp as per
instruction of Engg in charge.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.12 :- Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also includes necessary
excavation, dewatering and refilling as per instruction engg. In charge etc.comp.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
ItemNo.13:-LabourforchangeofGIwaterpipelineuptocustomerend.(inMuni.Limit)
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.14 :- Labour WorkfortempJodanofex.line forrunning water supply inclmaking collarbetween gap of pipe & jointing with
jute & day after removing all this as per inst etc.comp as dire.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.15 :- Labour charges for doing washout of water pipe line at end including necessary excavation refilling the pit.
Allowing the water to flow for 15 minutes twice or thrice as per site condition during supply hour, dewatering
the pit and plugging with existing wooden butch. etc. comp. as per instruction
Modeof measurement
MeasurementshallbegiveninNo.Basis.
ItemNo.16:-Supplyingwoodentaperbunchesfromjunglewood(Likelimda,ambo)Etc.comp.
Thewooden taperplugshouldbemadefromcountrywoodasperthesample and suitable to the /dia of
pipe and should be free from cracks.
Thesizeofwoodenplugshouldtheplugcaneasilyenteredinpipeandfixedproperly
withtheconnectionofpipesothatwatermaynotteakthroughplugandcaneasily removed as and where required.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.17 :- Providing , Supplying and fixing ISI mark approved quality for ferrulconnecting to existing CI/DI pipe line of water
tight joints per inst.of engg. in charge.
P/S OF and fixing ISI mark approved quality for ferrule connecting to existing CI/DI pipe line of
water tight joints per inst. of Engg. in charge.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.18 :- Removing any kind of pavement incl stacking of serviceble material disposal ofunserviceble material with
meter lead and lift.
Modeof measurement
MeasurementshallbegiveninSmtBasis.
Item No.19 :- Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge,excavated rock ,fly ash,
aggregate of any kind etc. comp.up to 5.0 Km. lead (Based on Building SOR 2015-16, P-589 - Item code- 3.2.1)
All the surplus earth etc. shall be carried away immediately from the site of work to a place within average
km distance as directed and shall be dressed as ordered by the Engineer,so as not to cause any in convenience
to the public or traffic. Failing which in view of public as safety and traffic convenience the Corporation shall
SABARMATIWARD -
carry out the work by any other agency at the contractor's risk and cost. If the instructions are not complied
within 7 days from the date of order to cart the surplus materials and clear site, the said work shall be carried
out by the Municipal Corporation at the risk and cost of the contractor and so claim or dispute entertained in
Modeof measurement
MeasurementshallbegiveninCmtBasis.
Item No.20 :- Extra rateover item ofexcavationof earth for excavationof asphalt pavement ofthickness up to 0.20 meter
including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking the material as directed.
extra rate for excavation of asphalt pavement of any thickness including demolishing theasphalt
carpet, metal, soiling etc. complete with stacking the materials as directed. The road surface of
asphalt shall carefully be opened to full width as directed by the Engineer in charge Asphalt,
popada's souls, metals etc shall be separately deposited in such places as may be determined by
the Engineering-charge. In case above materials not being so deposited or being mixed up with
the excavated materials will not be allowed for refilling. The cost of materials shall be charged
from the contractor. The decision of the C.E. shall be final and binding to the contractor. The
rate per sq. mt. in this item shall be paid extra addition to the rate for excavation.
For detailed specification refer 5th revision of MORTH (2013) & also ammendment shallbe
applicable to the latest versions.
Modeofmeasurement
MeasurementshallbegiveninSmtBasis.
Item No.21 :- SupplyingPneumaticBreakerMachinefor RCCSlaborAsphaltDemolishingWorkonsiteby using Operator, fuel,
power Supply etc. Complete as Directed. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work)
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc. The Work Shall
Carried out on risk of Contractor.
TheWorkShallbedoneasperEngg.in charge.
Modeof measurement
MeasurementshallbegiveninHr.Basis.
Item No.22 :- Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work &
also during unavoidable condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel
and operating charges and stacking of useful & non-useful materials separately up to store. (No payment
should be allowed for non workingcondition of machinery and for pipe line excavation and laying work)
(Based on Previously approved rate by C E sir.
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc. The Work Shall
Carried out on risk of Contractor.
TheWorkShallbedoneasperEngg.in charge.
Modeof measurement
MeasurementshallbegiveninHr.Basis.
Item No.23 :-Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc. comp.
(Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition of
machinery) (Based on Previously approved rate by C E sir )
SABARMATIWARD -
Providing and Operation Honda Pump including fuel charges & Operation as directed etc.complete as directed by
Engg. in charge.
Modeof measurement
MeasurementshallbegiveninShiftBasis.
Item No.24 :-Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of following dia. including fittings of
standard make as approved by Engineer - in - charge. Pipe shall be fixed on the wall with the help of clamp
at every 2000 mm centre to centre or shall be concealed as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same with adhesive solvent, including cost of all materials.
(As peruilding SOR 2015-16)
Modeof measurement
MeasurementshallbegiveninRmtBasis.
Item No.25:- Providing , Supplying and using size 15 to 50 mm dia .PVC pipe line up to 1 mtr length with
materiallikepipe,coupler,union,Elbowtee,endcap,band,F.T,M.T,Tailpeice,reducer
,M-seal,solution,Excavationprdayperwardincludinglabourandfittertopreventleakage
etc.and Fixing with existing PVC/DI/C lineper inst.of engg. in charge.Excavation including Labour and fitter.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.26 :- Providing,Supplying and Laying diff dia sluice valves Glen dory leakage reparing the excavation in any type of soil
,refiling, necessarynuts,bolts etc completeas engg in charge.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.27 :-Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt pavement of any
thickness, demolition of brick work in CM of any proportion including stacking of serviceable materials and
disposal of unserviceable material etc. comp. as directed.
Supplying,laborforbreakdownrepairingworkforactivitieslikeexcavation,disliting, removing debris from trench
back filling etc. comp. as directed by Eng .in charge.
Modeof measurement
MeasurementshallbegiveninNoBasis.
ItemNo.28:-SupplyingofLeadasperinstructionofengg.Incharge.
Modeof measurement
MeasurementshallbegiveninKg.Basis.
ItemNo.29:-Supplyingofjute(SpunYarn)asperinstructionofengg.Incharge.
Modeof measurement
MeasurementshallbegiveninKg.Basis.
Item No.30 :-Barricadingtheentirebreakdownor excavatedareaonrentalbasisusingwoodenballies/ M.S.angles at max.
meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth traffic
SABARMATIWARD -
diversion & movement including cautionary board etc. Item also includes for making temporary sufficient
nos of lighting arrangement through out the work with necessary required arrangement. The same shall be
removed after completion of work.
Modeof measurementMeasurementshallbegiveninRmtBasis.Skilled Welder per shift
Lead Jute (Spun Yarn) M-Seal 100 gm pack Cement bag Kapachi + Grit- Aggregates Sand
Rubber Ring for 400 mm dia pipe
Rubber Ring for 450 mm dia pipe
Rubber Ring for 500 mm dia pipe
Rubber Ring for 600 mm dia pipe
MS Plate /sheets /Angle / channels
MS Blank flange
S.S.SpindleRod,anyDia.Withthreads. (Wt.of Finished Material)
Gun Metal Nut with finished Material)
Roller assemblies
For Welding Joints
Rent of DG set per shift(With Diesel)
Rent of Welding machine per shift(With Rods)
Rent for Grinder machine per shift (With Discs)
Gas Cutting set per shift
Rent of Tools & Other Charges
Rent of Chain pulley block & Tripod per shift
Rent of de-watering Ele. Pump (1.5 to 3 HP) per shift
Rent of de-watering pump with fuel (1.5 to 3 HP) per shift
Rent for JCB Machine
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver (GWSSB SOR 2021-22)
And All type ON SITE Material responsibility only Labour contractor.
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and field testing of cast
iron pipes and fittings shall comply with all currently applicable standards. In all cases the latest revision of the
SABARMATIWARD -
standards shall be referred to. If requirements of this specification conflict with the requirements of the standards
this specification shall grove.
(a) IS:638Specificationforsheetrubberjointingandrubberinsertingjointing.
(b) IS:782Specificationforcaulkinglead.
(c) IS:1538SpecificationforcastionfittingsforPressurepipesforwatergasandsewage.
(d) IS:3114Codeofpracticeforlayingofcast-iron.
(e) IS:3400Methodsoftestforvulcanizedrubber(Partsto20)
(f) IS:5382SpecificationforrubbersealingringforGasmainswaterandsewers.
(g) IS:6587Specificationforspun/yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the Municipal Stores or
contractor’s stack yard to the work sites at places along the alignment of pipeline as directed by Owner /Engineer.
The Contractor shall be responsible for the safety of pipesfittingandvales withtailpiecesintransit
loading/unloading.Everycare shallbeexercisedin handling pipes and fittings to avoid damage. While unloading the
pipes and fittings shall with steadying ropes of by any other means. Padding shall be provided between coated pipes
fittings and skidstoavoiddamagetothecoatingSuitablegapebetweenpipesshouldbelift at intervalsin order to permit
access from one side to the other. In case of spigot socket pipes care should be taken regarding orientations pipes
while unloading. As far as possible pipes shall be ulna addedon one side of the stretch only. Thepipesshallbe checked
for any visibledamage (suchas broken edges cracking or spelling of pipe) while undo adding and shall be sorted out
for reclamation any pipe which shows sufficient damage to preclude it from being used shall be discarded shall be
prohibited. Necessary warning boards and lamps should be provided in front and side of pipes to avoid any
accident.Pipesshouldbe stacked withsufficient packingtoprevent rollingof the same. Contractor will be fully
responsible for any accident due to pipes or other materials stacked on site of yard. Contractor will be fully
responsible for any legal formalities arising due to such accident and all legal charges there of shall be paid by
contractor of will be recovered from his running bill of the same or other AMC works.
SABARMATIWARD -
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch number
marked on it with particulars of supplies wherever possible storage shall be done on film level and clean ground and
wedges shall be provided at the bottom layer to keep thestackstable. Thestackshallbe inpyramidshapeorthelaid
lengthwise andcrosswise inaltimeter layers.Thepyramidstackshallbe madeforsmallerdiameterpipesforconserving
spacein storing them.The height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail piecesshall be
stacked under coverand separated frompipes. Rubberringsshallbe stored in clean coolstore away from windows
boiler electrical equipment and petrol oils or other chemicals Particularly in the field where the rubber nods are
being used it is desirable that they are left out on the ground in the sun or overmuch under heavy frost of snow
The Contractor shall visit the before tendering and get himself acquainted site condition and the regulations
regarding the laying of pipes in congested areas heavy traffics areas etc. The successful bidder shall take the
necessary permission and clearance of all the authorities like department of ads traffic water supply and the drainage
electricity broad telephone comp anyetc. Wherever necessary.
Roadreinstatementshallnotbeincludedinbackfillingunlessspecified.
To protect person from injury and to avoid damage to property adequate barricades construction signs red
lanterns and guards as required shall be placed and main lined during the progress of the construction work and unit
it is safe for the traffics to use the roadways. The relevant Indian standards and the rules and regulations of the local
authorities in regarded to safety provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by contractor at his
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing shall be of
timber securely fixed in the ground not more then 3m.apart and they shall be less than 75 mm in diameter of less
than 1.2 m above the surface of the ground. There shall be two rails. One near the top of the post and the other
about 450 mm. Above the ground and each shall be from 50mm to 70mm in diameter and sufficiently long to run
from post to post which they shall be bound with strong rope. The method of projecting rails beyond the posts and
tying them together where they meet will not be allowed on any account. All along the edges of the excavated
trenches a bank of earth about 1.2. m high shall be formed as required by the Owner/Engineer for further protection.
The above work shall not be paid for separately and the contractor shall take into account the costs of such works
and quote accordingly.
Whole work shall done within 24 hrs. by parts or whole work so that water supply from AMC shall not be
The excavation in the foundation shall be carried out in true and level and shall have the width and depth as
required and as directed. The Contractor shall provide necessary slopes to a
safeangleorstepsasrequiredordirectedathisowncostNoextrapaymentshallbemadefor
SABARMATIWARD -
such precautionary measures taken. The bottom of the excavated area shall be leveled both longitudinally and
transversely as directed by removing excess soil and watering as required. No earth filling will be allowed for bringing
it to level if by mistake or any other reason excavation is made deeper or wider than asdirected. The extra depth or
width shallbe made up with concrete of the same proportion as specifiedfor the foundation concrete at the cost of
the contractor.The excavation up to any required depth shall be carried out under this item as required and directed
by engineer in charge.
SurfaceExcavationforRoadWork:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth in all kinds
of soil which are specified shall be as treated as surface excavation.
Excavationintrenchesforservicelines-WatersupplyandDrainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the service
lines to be laid to the lines and levels shown and as directed. Excavation shall be made with adequate and stable side
slopes or shoring strutting if necessary. The contractor shall provide all measures to protect adjoining properties
service limes etc. The contractor shall take necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench bed shall be
trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid to the required levels and
gradients shall be no the bottom fully supported along the entirelengthofthepipe.Thetrenchshall
bedeepenedandwidenedlocallyto receivethesockets and to permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of direction and
gradients at a definite and as far as practicable uniform height above the proposed invert level of the pipes the
center lime being clearly marked on each horizontal rail. The depth of excavation and level of the pipe invert shall be
checked by means of benching road of appropriate lengths.
DisposaloftheExcavatedStuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling the
ground in layers including ramming and watering etc. complete. The Contractor shall remove the balance of the
excavated from the site of work to a place as directed within a lead unto 50mm and for all lift.
FilingofTrenches:
As soon as the work in foundation has been completed and measured the sides of foundation shall be
cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not exceeding 15 cm Each layer
shall be adequately watered rammed well andconsolidated before the succeeding layer is laid. The earth shall be
rammed with iron rammers where feasible and with the butt ends in layer of crowbars where rammer cannot be
used. The plinth shall be similarly filled with earth in layers not exceeding 15 cm adequately watered and
consolidated by ramming with iron or wooden rammers. When filling reaches finished level the
surfaceshallbefloodedwith waterforatleast24hoursand allowedtodryandthenrammedand consolidated. The finished
level of filing shall be kept to shape and gradient intended to receive any floor finish. The excavated stuff of the
selected type only shall be allowed to be used forfilling the trenches and plinths. Under no circumstances black
cotton soil shall be used for filling the plinths.
SABARMATIWARD -
FILLING MATERIALS:
Filling materialsmay be either excavated stuff ofselected materialsbrought fromoutside. Excavated stuff or
selected earth to be used shall be cleared of all rubbish large size stones brick batsetc. complete andbig clodsshallbe
brokendown toasizeof50mmor less. Theselectedsoil and or murmur or any other materials shall be got approved
before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the contractor shall got
checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or bottom of
found at ion shall be refilled to the original surface or up to plinth level with earth or selected materials in layers of
15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till the final level is
reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated stuff. The
refilling shall be raised about 5 cams. For subsequent settlements.
Thecontractorshallberesponsibleforanysettlementduringpassageoftime ofduringmonsoon and the same shall be
refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way as not to
danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering isnot done by contractor with its own arrange meant watering charges at 20% of this item rate
shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not be
exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to come in contact with any
fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for which they
are to be used the manufacturer’s name or trademark and the month and the year of manufacture.
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and physical
The rubber rings shall be such that they shall not show any signs of deterioration for any reason during the
contract period plus the defects liability period, Entire expenses associatedwith correctingdefects inthisregard
includingreplacementof rubberringsshallbefullyborneby the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor shall take
into account the manufacturer’s recommendations as to the methods and equipment to be used in assembling the
joints. In particular the contractor shall ensure that the
spigotendofthepipetobejointedissmoothandhasbeenproperlychamferedthattherubber
ring as per IS 5382 is correctly positioned in the socket and that the two pipes are accurately in line,beforethe joint
ismade.Therubber ringsand any recommendedlubricant shallbe obtained only through the pipe supplier or as
directed by the Engineer.
LEAD CALCULATING JOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality clean and free
from foreign materials. It shall be of uniform softness capable of being easily caulked or driven. It shall conform to IS:
782 Spun yarn shall be of clean hemp and of good quality. It shall conform to IS: 6587 Its quantity shall be as follows.
QuantitiesofspunYarnforDifferentSizesofPipes
(Materialsforsinglecollarjoints)
NominalInternal SpunYarnMass
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn
depending upon the site conditions. The quantity of different diameters of C.L. pipes and fittings shall
SABARMATIWARD - 31-
QUANTITIESOFLEADYARNFORDIFFERENTSIZESOFPIPES
NormalSize Lead/Joint Depthof
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the molten metal
will not be chilled inbeing carried from the melting potto the joint and shallbe brought to a proper temperature so
that when stirred it will show a rapid change of color. Before pouring all scum shall be removed. Each joint shall be
one continuous pour filling of the entire joint space with solid lead. Spongy or imperfectly filled joints shall
be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be dammed
with clay to from a pouring lip to provide for filling the joint flush with the face and to the top of the socket.
SABARMATIWARD - 32-
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by running in
molten lead, taking care that no dross enters the joint and then thoroughly caulking the lead. The spun yam shall be
used to center the spigot in the socket and to prevent the flow of molten lead into the bore of the pipe.
Afterthe lead hasbeen run into the joint the lead shall be thoroughly caulked. Caulking of joints shall be
done after a convenient length of the pipes has been laid and leaded. The leading ring shallfirst be removed and any
lead outsidethe socket shallbe removed with aflat chiseland then joint caulked removed with a flat chisel and then
the joint caulked around three times with caulking tools of increasing thickness and hammer of 2 kg. Weight Lead
run joints shall be preferably finished 3 mm behind the socket face. The joints shall not be covered till the pipe line
has been tested under specified hydrostatic test pressure, though the rest of the pipe line should be covered up to
prevent expansion and contraction due to variation in temperature.
Fillingavailableexcavatedearth(excludingrock)intrenchesplinthsidesoffoundationetc. in layers not exceeding
20 cams.In depth consolidating each deposited layer by ramming and watering.
The refillingwill generallyreferto refillingofpipelinetrenches,foundation trenchesupto plinth level or ground
level with excavated stuff selected soil brought from outside.
ClearingorTrenchesorGround:
The excavated trenches for foundation or ground over which filling is to be done shall be cleared off all grass
loose stones rubbish of all kinds brick bats as well as tress roots etc.
Theyshallbewellwateredbeforestuffislaid.
Item No.35 :- Providing, laying, spreading and compacting gradedstone aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materialby tipper to
site, laying inuniform layers in sub base/ base course on well prepared surface and compacting with
vibratory roller to achieve the desired density as per MORTH clause
Mode of measurement
Measurement shall be given in cmt Basis.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 69.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .