| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-Finance | ₹3.1 Cr | L1 | Accepted-Finance First lowest |
| 2 | L2₹3.2 Cr+₹14.6 L (4.70%)Accepted-Finance | ₹3.2 Cr+₹14.6 L (4.70%) | L2 | Accepted-Finance Second lowest |
| 3 | L3₹3.3 Cr+₹17.8 L (5.75%)Accepted-Finance U 10 20 DLF PHASE III GURGAON GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹3.3 Cr+₹17.8 L (5.75%) | L3 | Accepted-Finance Third lowest |
| Sl No | Description | Qty | Unit | APAAR INFRATECH PVT LTD L3 | Anchor Infrastructure L2 | Tavasya Venture Partners Private Limited L1 |
|---|---|---|---|---|---|---|
| 1.00Modification of water conductor system | ||||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. Excluding rooting out | 2,715 | m2 | 50 ₹1,35,750 | 10 ₹27,150 Lowest | 105 ₹2,85,075 |
| 1.02 | Providing earth filled bag wherever necessary including cost and conveyance of all materials, labour charges etc. complete and as directed by departmental Officers. | 500 | nos | 70 ₹35,000 Lowest | 200 ₹1,00,000 | 70 ₹35,000 Lowest |
| 1.03 | Drilling in soil consisting of earth and boulders using diamond drill, and re-drilling wherever required, including labour charges, machinery, air, water, etc. | 160 | meter | 720 ₹1,15,200 Lowest | 800 ₹1,28,000 | 1,451 ₹2,32,160 |
| 1.04 | Drilling in rock / concrete using diamond drill(without cores), and re-drilling wherever required, including labour charges, machinery, air, water, etc. | 40 | meter | 750 ₹30,000 Lowest | 3,600 ₹1,44,000 | 2,400 ₹96,000 |
| 1.05 | Pressure grouting with cement with/without packers at required consistency including all labour charges, machinery, equipment, air, water, etc. as per specifications and as directed by the departmental officers, but excluding cost of cement. | 1,100 | kg | 24 ₹26,400 | 6 ₹6,600 Lowest | 25 ₹27,500 |
| 1.06 | Providing anchor bars of varying depth using Tor steel, bend, jumped, etc. including cost and conveyance of steel, labour charges, etc. complete as per the specifications and drawing as directed by the departmental officers. including cost of care and diversion,its dismantling and dewatering. | 340 | kg | 120 ₹40,800 | 97 ₹32,980 Lowest | 100 ₹34,000 |
| 1.07 | Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. | 4,200 | m2 | 230 ₹9,66,000 | 465 ₹19,53,000 | 100 ₹4,20,000 Lowest |
| 1.08 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 25 mm average thickness. | 4,200 | m2 | 280 ₹11,76,000 | 100 ₹4,20,000 Lowest | 100 ₹4,20,000 Lowest |
| 1.09 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 30 | m3 | 750 ₹22,500 Lowest | 1,500 ₹45,000 | 9,000 ₹2,70,000 |
Tender Value
₹3.1 Cr
EMD Value
₹1 L
Closing Date
29 Jan 2026, 3:00 pmClosed
Chief Engineer Project Execution Buildings North
Chief Engineer Project Execution Buildings North, Vydyuthi Bhavanam, Nadakkavu PO, Kozhikode, 673011
Kuttiyadi Tail Race Scheme (3X1.25 MW) - Modification in water conductor system for enhancement of power generation
2025_KSEB_819986_1
CE(PEB)N/01/2025-26 dated 15.12.2025
Open Tender
Civil Works - Canal
Item Rate
180 days
Kakkayam
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
₹1 L
14 Sept 2026
19 Dec 2025
4 Feb 2026
22 Dec 2025
29 Jan 2026
1 Jan 2026
22 Dec 2025 - 27 Dec 2025
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. Excluding rooting out
Providing earth filled bag wherever necessary including cost and conveyance of all materials, labour charges etc. complete and as directed by departmental Officers.
Drilling in soil consisting of earth and boulders using diamond drill, and re-drilling wherever required, including labour charges, machinery, air, water, etc.
Drilling in rock / concrete using diamond drill(without cores), and re-drilling wherever required, including labour charges, machinery, air, water, etc.
Pressure grouting with cement with/without packers at required consistency including all labour charges, machinery, equipment, air, water, etc. as per specifications and as directed by the departmental officers, but excluding cost of cement.
Providing anchor bars of varying depth using Tor steel, bend, jumped, etc. including cost and conveyance of steel, labour charges, etc. complete as per the specifications and drawing as directed by the departmental officers. including cost of care and diversion,its dismantling and dewatering.
Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge.
Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 25 mm average thickness.
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Cement concrete M30 with 20mm graded aggregates laying to lines and levels at all elevations, consolidating, curing, including cost of all materials, labour and conveyance charges, etc. complete but excluding cost of cement. (Without concrete pump)
Supplying, furnishing and installing 14 gauge welded mesh / chicken mesh for shotcreting/guniting wherever required at all elevations including cost of all materials and labour charges, etc. complete.
Shotcreting R.C.C. columns, beams and slabs etc. in layers with approved design mix concrete having the specified minimum characteristic compressive strength [with ordinary portland cement,coarse sand and graded stone aggregate of 10 mm maximum size in proportion as per design criteria]including the cost of centering and shuttering at edges and corners, admixture, finishing to smooth surface, labour charges, etc. but excluding cost & conveyance of cement as directed by Engineer- in-Charge ,75mm thick in concrete Grade M 25 , excluding cost of cement.
Providing and fixing in position 12mm thick bitumen impregnated fiber board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints.
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. Serrated with central bulb (225 mm wide, 8-11 mm thick) complete :
Supply and usage of cement at site including cost of cement, conveyance charge, storage arrangements, charges for stacking and restacking if necessary, etc. complete.
Providing & Applying weather proof sealant on outer joints of approved make confirming to IS & directed by Engineer-in-charge.Sealant 25mmx10mm at joints
Supply and usage of admixture at site including cost of admixture, conveyance charge, storage arrangements if nescessery etc. complete as directed by the departmental officers.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.95 MB
volume1PQ.pdf
Tender Documents • 1.88 MB
volume2conditions.pdf
Tender Documents • 2.57 MB
Volume3technical.pdf
Tender Documents • 1.33 MB
POWERCHANNEL1.pdf
Other Document • 0.40 MB
POWERCHANNEL2.pdf
Other Document • 0.39 MB
layout.pdf
Other Document • 0.32 MB
BOQ_1374905.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .