Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical AS PER RFP |
| 3 | Rejected-Technical 202 TIRUPATI INDUSTRIAL ESTATE 202 TIRUPATI INDUSTRIAL ESTATE SUBHASH NAGAR BHANDUP WEST BHANDUP WEST MUMBAI CITY MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Rejected-Technical AS PER RFP |
| 4 | Rejected-Technical | Rejected-Technical AS PER RFP |
| 5 | Rejected-Technical | Rejected-Technical AS PER RFP |
Tender Value
Refer Docs
Closing Date
25 Aug 2021, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
REMOVAL OF MR-123-02 AND INSTALLATION OF BWCS (RETROFITMENT) ONBOARD INS MUMBAI
2021_NAVY_467178_1
DYT/WEA/21-22/106(A)/PL-IN/ MUMBAI BWCS/153
Open Tender
Marine Services
Item Rate
540 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
NAVAL DOCKYARD MUMBAI
29 Sept 2021
11 Aug 2021
26 Aug 2021
11 Aug 2021
25 Aug 2021
16 Aug 2021
16 Aug 2021
180 days
Amount
Services – (a) MR-123 Control Post -Degutting and removal of existing Dev 3 Qty-2(Dimension 1427 762* 1611mm, weight- 389 Kg each) (b) MR-123 HF Post (Port)- Degutting and removal of existing (i) Dev 2A (Dimension 1100*695*1628mm, weight-414 Kg) (ii) Dev 2(Dimension 1200*744*1721mm, weight-563Kg ) (c) 123 HF Post (Stbd)- Degutting and removal of existing (i) Dev 2A (Dimension 1100*695*1628mm, weight-414 Kg) Dev 2A (Dimension 1100*695*1628mm, weight-414 Kg) (ii) Dev 2(Dimension 1200*744*1721mm, weight-563Kg ) Dev 2(Dimension 1200*744*1721mm, weight-563Kg )
Services – (a) MR-123 Control Post -Degutting and removal of existing (i) Dev 3A Qty-02 (Dimension 588*486*1205mm, weight-129 Kg each), (ii) Dev 3(D)-1 Qty-02 (Dimension 590.569*1536mm, weight-188Kg each) (iii) Dev-4-30 Qty-02(Dimension 585*482*810mm, weight- 101Kg each), (iv) Dev 4A-30 Qty-02(Dimension 595*449*1039mm, weight-131 Kg each), (v) Dev 5 Qty-02 (Dimension 585*431*1026mm , weight-126Kg each), (vi) Dev 7 Qty-02(Dimension 585*510*1129mm, Weight -128 Kg each) (vii) SPTA Boxes Qty-08(Dimension 662*674*1663mm, Weight- 125 Kg each), (viii) Kolanka Sight (Port and Stbd)
Services – (a) MR-123 Control Post -Degutting and removal of existing (i) Dev 3-(B)M Qty-02 (Dimension 622*400*922mm, weight- 91 Kg each) (ii) Dev 5A Qty-02(Dimension 585*423*722mm, weight- 87 Kg each), (iii) Dev 5B Qty-02 (Dimension 596*352*620mm , weight- 52 Kg each) (iv) Dev 8, Wty-02 (Dimension 586*428*889mm, Weight-55 Kg each), (v) Dev K-01 Qty-02(Dimension 590*573*794mm, Weight-71 Kg each) (vi) Dev BOE, Qty-02(Dimension 165*175*200mm Weight 8.5 Kg each), (vii) SPTA Boxes , Qty-06(Dimension 245*199*149mm Weight-20Kg each), (b) MR-123 Equipment Room - Degutting and removal of existing (i) Magnetic Starter Starter (P)MTM0131, Qty-08 (Dimension 326*190*262mm, weight- 11 Kg each ) (ii) SPTA Set , Qty-02(Dimension 390*380*200mm, weight-25 Kg each), (iii) Amplidyne 12A, Qty-06(Dimension 605*323*255mm, weight- 69 Kg each) (iv) Amplidynes 5A, Qty-02(Dimension 492*270*225mm, weight-44Kg each) (c) MR-123 HF Post (Port)- Degutting and removal of existing (i) Dev 5B(Dimension 468*322*555mm, weight- 36 Kg ) (ii) Dev 8A(Dimension 335*230*608mm, weight- 19 Kg (d) MR-123 HF Post (Stbd)- Degutting and removal of existing (i) Dev 5B(Dimension 468*322*555mm, weight- 36 Kg ) Dev 8A(Dimension 335*230*608mm, weight- 19 Kg) (e) MR-123 Antenna Post (Port)- Degutting and removal of existing JB C(Y)-1 (Dimension 610*193*970mm, weight-40 Kg) (f) MR-123 Antenna Post (Stbd)- Degutting and removal of existing JB C(Y)-1 (Dimension 610*193*970mm, weight-40 Kg)
Service - Removal of old not used cables, connectors can be cut and removed and transporting to servey yard and transport to be catered by vendor
Service - Removal of old not used cables would require breaking of existing gland
Service - Removal of device ventilation trunking. Trunking to be removed from devices till first bolted location.
Service -Provisioning of all the lagging and welding materials during degutting and welding of all the devices and compartments(for both port and stbd)
Service - Degutting and removal of foundations/ frames/ brackets
Service - Laying of cable (Laying dressing and clamping) Cables are to be routed through the proposed cable routes. All cables are to be secured properly through clamp. Grounding of all screened cables and devices
Service - Manufacturing and fitment of cable trays and clamps (as reqd.) for fitment of cables. Grounding of all screened cables using grounding straps
Service - Laying provisioning and fitment of cable conduit 60 sq mm
Service - Manufacturing of 06 deck tubes and 09 bulkhead gland of material SS and fitment of the same. The glands are to be repacked post laying and proven during air pressure test (APT) of the ship
Service - Creation of necessary datum benchmark
Material - Creation of necessary datum benchmark
Service - Installation of the following at BARAK Control Post Main Unit, FCC, Power Supply distribution box , Transmitter Module (TX), Radar Tracking System(RTS) unit and RECU and associated cabling, Manufacturing SPTA Rack,Storage locker
Services - Installation of Servo Control Unit (SCU) unit
Services - Installation of Transceiver Processor Rack (TPR)
Services - Installation of Power Distribution Box(PDB)
Services - Installation of Blanking Interface Unit (BIU)
Services - Installation of MIL 1553 Bus
Services - HF Post has to be converted into BARAK HF Post. Terminate HE-08 forced cooling trunking at compartment entrance and reroute it to E/R for increased in E/R
Service - AK-630 Barbette (1&2)/VLU magazines AK 630 Barbette(1&2) are to be converted into VLU magazines. It includes structural modification of both AK 630 Barbett as per BP's, surface preparation deck strenthening for VLU Installation, Removal/de-gutting of feed bin bunker magazines
Service – Installation of 04 in no VLUs at 04 deck including (a) Fabrication of VLU compartment, Manufacturing and welding of foundation for fitment of VLUs , this includes (b)Fabrication of VLU Flanges – 03 nos (c)Heat treatment of VLU flanges (d)Machining of VLU flanges (e)Drilling of VLU flanges (f) Installation of VLU flanges
Service - Manufacturing and welding of boundary bulkhead and deckheads
Service - Necessary stiffening and supporting arrangement for bulkhead and deck head
Service - Manufacturing and fitment of ventilation trunking
Service - Degutting and regutting of bulkhead lagging
Service - Fabrication and fitment of new datum plate
Service - Fabrication and fitment of Cu-Ni pipes including supply of isolation valves 65mm NB (2 nos) for fire fitting system and installation of quartz bulbs in VLU compartment
Service - Fitment of spark proof lighting in VLU compartment
Service - Installation of temperature monitoring system in VLU compartment
Service - Manufacturing and fitment of vertical ladder for VLUs
Service - Fabrication of cable trunk from VLU compartment to Barak Control Post
Service - MR-123 Ae Barbette(P&S) (a) Filling up of circular patch of Ae on 03 deck (b) Strengthening of 03 deck above (c) Augmentation of communication facilities (d) Opening of passageway on respective side for access to prefabricated BWCS barbette (e ) Installation of Antenna system
Material - MR-123 Ae Barbette(P&S) (a) Filling up of circular patch of Ae on 03 deck (b) Strengthening of 03 deck above (c) Augmentation of communication facilities (d) Opening of passageway on respective side for access to prefabricated BWCS barbette (e ) Installation of Antenna system
Service - Barak Equipment Room Smeta control post & smeta equipment room are to be merged & converted into BARAK Equipment room for fitting of rotary convertors(Qty-02).
Material - Barak Equipment Room Smeta control post & smeta equipment room are to be merged & converted into BARAK Equipment room for fitting of rotary convertors(Qty-02).
Service - Waveguide installation as per approved WLDs
Service - Interfacing With PYART Panel (a) Fabrication of PYART panel housing (b) Shifting and fitment of PYART panel to the fabricating housing (c) Laying of cable and connectorisation with BWCS
Material - Interfacing With PYART Panel (a) Fabrication of PYART panel housing (b) Shifting and fitment of PYART panel to the fabricating housing (c) Laying of cable and Connectorisation with BWCS
Service - BWCS Interface With Ship Systems laying of cable and Connectorisation (a) Interface with CMS & SDN (b) Interface with FREGAT M2EM (c) Interface with RAWL if approved by IHQ MOD(N) (d) Interface with Blokirovka and Zevedochka (e) Interface with ship’s EW system (f) AK-630 PYART interface
Service - Manufacturing and installation of name plates for Barak devices/compartments
Services - Deck Strengthening:Cutting and renewal of AK 630 Deck and FCR Deck (Port and Stbd) All Facilities including equipment requirement required for cutting fabrication and installation to be catered by vendor(for both port and stbd)
Service - Removal of in way equipment like greasing guns, ducting, air pipes,, tool rack OXT, fire box, prewetting system
Service - Removal of in way electrical equipments like starter, control panel, junction box and light fittings
Service - Re-fitment of in way equipment like greasing guns, ducting, air pipes,, tool rack OXT, fire box, prewetting system
Service - Re-fitment of in way electrical equipments like starter, control panel, junction box and light fittings
Service - Modification existing ventilation trunking system feeding the new cabinets at all location
Service - Connectorisation and associated cable booting for the same
Service - Manufacturing and fitment of cable tallies 6x3x0.5 cm- Alluminium (punched)
Service – Installation of FCR At AFT mast (port and Stbd) including Welding of bulkhead and deck for new compartment for positioning of FCR
Service - Necessary stiffening and supporting arrangement for deck as reqd. for Sr. 53
Service - Cutting of opening on MS bulkhead for fitment of new NWT metallic door for Sr. 53
Service - Manufacturing and fitment of MS door on superstructure for Sr. 53
Service - Repositioning of opening on deck of aft mast for Sr. 53
Service - Manufacturing and fitment of ventilation trunkings for Sr. 53
Service - Degutting/regutting of bulkhead lagging as required for Sr. 53
Service - Positioning of base datum line and mounting plane for Sr. 53
Service - Fabrication and fitment of new datum plate for Sr. 53
Service - Laying of wave guide run along with shock mounts, protection cover/gland from antenna post to Barak HF post for Sr. 53
Service - Cutting of opening on deck head of new compartment for FCR for Sr. 53
Service - Replacement of existing ventilation blower in fan room with proposed blower of higher capacity. Layinf of ventilation trunking from fan room to Antenna post, piercing of deck whenever required for Sr. 53
Service - Fabrication and welding of guard rail at antenna post as reqd. for Sr. 53
Services – Fabrication of foundation and installation of Barak Launcher control unit (BLCU) and Kolanka sight (P&S)
Service - Manufacturing of foundation for Kolanka sight
Service - Re-routing of all cables to junction box in MR-123 Ae barbette for Sr. 66
Service - Cabling from junction box in MR-123 barbette till Kolanka sight platform for Sr. 67
Service - Shifting of AG-1,AG-6,check fire alarm bell, deck lighting arrangement to boat deck bulk head beside proposed location of sight for Sr. 66
Service - Connectorisation of Kolanka sight for Sr. 67
Service - Structural modification as per BP's for Sr. 66 & 67
Service - Insatllation of Power Supply units (i) Convertor Qty 01 (ii) Step down transformer Qty 01 (iii) Duel O/P Transformer Qty 01 (iv) Step up transformer Qty 01 (v) Isolation transformer Qty 01 (vi) Auto Change over switch Qty 01
Service - Removal of MICROTEX,Deck Underlay, to facilitate installation of foundation and support from all places where installation needs to be carried out
Service - Proper Earthing/bonding of all units as per NEC-STD 1101
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .