Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹77.3 L
EMD Value
₹1.5 L
Closing Date
17 Oct 2026, 1:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
Office of The SE 3rd Circle Irrigation Works, Agra
Construction of Bridge at Km. 153.810 of Agra Canal in Distt. Matuhra
2026_UPIDC_1195563_1
13/SE/2026-27
Open Tender
Civil Works
Item Rate
50 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.5 L
Office of The SE 3rd Circle Irrigation Works, Agra
12 Oct 2026
12 Oct 2026
17 Oct 2026
12 Oct 2026
17 Oct 2026
12 Oct 2026
14 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in wet soil including lift up to 3 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge. | 1,193.37 | Cum | - | - |
| - | Supplying & Fixing 1200 mm inner dia NP-4 socket hume pipe placing in position i/c all material, Labour, T&P etc. Complete. | 15 | Rm | - | - |
| - | Providing & Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete. | 128.57 | Cum | - | - |
| - | Providing & Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete. | 65 | Cum | - | - |
| - | Providing & Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete. | 276.9 | Cum | - | - |
| - | Providing & Laying C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete. | 8.75 | Cum | - | - |
| - | Centering and shuttering (steel shuttering) for C.C. work including cost of all labour, material and T&P etc. Complete. | 186.33 | Sqm | - | - |
| - | Centering and shuttering (steel shuttering) for R.C.C. work including cost of all labour, material and T&P etc. Complete. | 665.6 | Sqm | - | - |
| - | Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. | 26.24 | MT | - | - |
| - | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes including cost of all material, labour and T&P etc. complete. | 27 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_2257937.xls
BOQ • 4.27 MB
PulTechnicalLOT_1.pdf
Tender Documents • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .