Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹20.1 L
EMD Value
₹50,000
Closing Date
27 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Executive Engineer
Office of the Assistant Executive Engineer, KSEBL, Substation Subdivision, Munduparamba Malappuram,Kerala-676509
Construction of 110kV double bus arrangement and providing bus coupler facility at 110 kV Substation, Kizhissery - Laying of Earthmat at new yard area
2026_KSEB_888353_1
SSDM-04/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Kizhissery
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,900
₹50,000
16 Nov 2026
16 Nov 2026
30 Nov 2026
17 Nov 2026
27 Nov 2026
17 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator)
/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to
1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil (cost index(c) : 1.3268 included in Rate) | 495 | cub.m | 330.43 | ₹1,63,561.02 |
| 2 | 2.9.1 : Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock (cost index(c) : 1.3268 included in Rate) | 55 | cub.m | 602.98 | ₹33,163.76 |
| 3 | Cutting 32mm MS rod in required length etc complete as per the direction of the departmental officers. (cost index(e) : 1.2062 included in Rate) | 970 | E | 91.45 | ₹88,703.78 |
| 4 | Bending 32mm MS rod for crossing cable trench/foundations/risers etc. (cost index(e) : 1.2062 included in Rate) | 840 | E | 134.9 | ₹1,13,317.18 |
| 5 | Laying of earth mat of required size as specified using 40/32/25mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers. (cost index(e) : 1.2062 included in Rate) | 240 | qtl | 1,110.13 | ₹2,66,430.29 |
| 6 | Drilling holes and driving down MS ground electrode from the bottom level of trench in all classes of soil including rock etc. complete as per the directions of department officers (cost index(e) : 1.2062 included in Rate) | 290 | m | 226.82 | ₹65,778.12 |
| 7 | Welding of overlapping joints for mat,riser lap joints with 32/25mm MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers. (cost index(e) : 1.2062 included in Rate) | 960 | E | 662.77 | ₹6,36,256.13 |
| 8 | Welding the nodal points (cross joints ) in the trenches at two sides to a thickness of 6mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers. (cost index(e) : 1.2062 included in Rate) | 1,440 | E | 313.67 | ₹4,51,686.96 |
| 9 | Welding the ground electrode with the main electrode , after cleaning the surface neatly. Charges includes cost of low hydrogen content DC electrodes (No. E7018), hire charges of DC arc welding set, tools and plants, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers. (cost index(e) : 1.2062 included in Rate) | 100 | E | 403.37 | ₹40,337.43 |
| 10 | Filling available excavated earth (excluding rock) in trenches, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 metres. (cost index(e) : 1.2062 included in Rate) | 550 | cub.m | 269.37 | ₹1,48,152.73 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TDocKzyEarthMat.pdf
Tender Documents • 0.83 MB
BOQ_1519980.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .