| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.8 LAccepted-AOC | ₹42.8 L | L1 | Accepted-AOC First lowest |
| 2 | L2₹44.9 L+₹2.1 L (4.89%)Rejected-AOC | ₹44.9 L+₹2.1 L (4.89%) | L2 | Rejected-AOC second lowest |
| 3 | L3₹46.6 L+₹3.8 L (8.91%)Rejected-Finance | ₹46.6 L+₹3.8 L (8.91%) | L3 | Rejected-Finance third lowest |
Tender Value
₹55.1 L
EMD Value
₹50,000
Closing Date
6 Jan 2023, 6:00 pmClosed
Executive Engineer
O/o of the Executive Engineer, KD Division Mancompu
Construction of outer bund using Rubble retaining wall and clay bund formation, Repair and construction of retaining wall at vachal thodu inside padasekharam
2022_Irrig_543985_1
IRR/KP/TR/986/2022_5_2_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Edathua
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
28 Feb 2023
27 Dec 2022
9 Jan 2023
27 Dec 2022
6 Jan 2023
27 Dec 2022
Amount
PROTECTION WORKS
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD20547/2022-2023:Earth work in rough excavation in or under water or liquid mud, banking excavated clay in layers not exceeding 20 cm in depth, breaking clods and tressing up in embankments for roads flood banks marginal banks and guide banks with all leads and lifts in all kinds of soil(based on DSR 2.2.1-2.4-2.5+20%)( under water excavation in stiff heavy kayal clay). Certificate:- Certified that the observed data is prepared by taking the rates and labour charges as per current schedule of rates and has been prepared as per the actual observation at site.
James Thomas
CHERIAN
Bidder Name
CHERIAN
sanalkumar v d
James Thomas
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_794403.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .