Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC OK | |
| 2 | L2₹1.4 L+₹28.58 (0.02%)Rejected-AOC | L2 | Rejected-AOC OK | |
| 3 | L3₹1.4 L+₹57.17 (0.04%)Rejected-AOC | L3 | Rejected-AOC OK |
Tender Value
₹1.4 L
EMD Value
₹2,858
Closing Date
20 Dec 2025, 1:00 pmClosed
THE BDO/EO, MAL
O/O, THE BDO, MAL
CONCRETE CHAIR AT BD LINE FOOTBALL GROUND. AT PART NO 20/69, OF DAMDIM GP MAL BLOCK, JALPAIGURI, FUND- APAS. APAS ID - APAS/01/020/69/0007
2025_ZPHD_956318_1
WB/47/BDO/MAL/2025-26
Open Tender
CIVIL WORKS
Percentage
DAMDIM GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,858
Yes
2 Aug 2026
22 Nov 2025
23 Dec 2025
22 Nov 2025
20 Dec 2025
22 Nov 2025
Earth work in excavation of foundation trenches or drains, in af sorts of including mixed sol but excuding teterite or sandstone) induding removing, spreading or stacking the spoils within a leed of 75 m, as directed. The item includes necessary bring the sides of trenches, levelling dressing and ramming the bottom, balling out water as required comparte
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes (b) River bazree
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS 1161-1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete ndluding cutting to requisite size, fabrication with necessary metal arc welding conforming to t5: 816-1969 & IS. 9595 using electrodes of approved make and brand conforming to 15:814-2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such Items with weight of finished structural members. The rates are considered for a height of erection 8m./2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m beyond the initial 8m, or part thereof.
RCC Concrete readymade Benches With Arm Rest and back rest with carrying loading (Payment will be made as per measurement) (Details in MB)
Supplying. Fitting & Fuxing Information Board Steel size (4-03-0")
Add:- GST @ 18%
Add:- Cess @ 1%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2296132.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .