Tender Value
₹52.9 L
EMD Value
₹1.1 L
Closing Date
1 Sept 2026, 6:00 pm7d left
Executive Engineer,Futuristic Planning Cell (FPC), Vadodara Municipal Corporation
DEVELOP ORGANIC VEGETABLE MARKET AT SOUTH ZONE IN VADODARA CITY.
335248
PRO No 296/2026-27
Open
Civil Works - Others
Works
Vadodara
3 documents required · 3 mandatory
₹6,000
MUNICIPAL COMMISSIONER ,VADODARA MUNICIPAL CORPORATION
₹1.1 L
14 Aug 2026
14 Aug 2026
14 Aug 2026
1 Sept 2026
14 Aug 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer may
fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter
a rate or price shall be deemed to be covered by other rates and prices entered in the
Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the
cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections of
the contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling for
its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with Quantity Unit Rate In Amount
No brief specification and figures
reference to book of
specifications)
I/We am/are willing to carry out the work at… ....................... % above/below percent
(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put
to tender Deduct………% below Add………% Above
In Words In words
1 The Contractor shall exhibit a board with detailed specification and details of
work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted from the bill amount excluding GST as per
prevailing rules i.e. 1% of the work done.
3 Income tax TDS will be deducted from the bill amount excluding GST at a source
while making payments of bills.
(Government rules will be applicable)
4 Total value of SD i.e. 5% shall be calculated on Contract Price + GST.
BILL OF QUANTITY
Description Qty Rate Per Amount
Excavation for foundation upto 1.5 m depth including sorting out and
1 stacking of useful materials and disposing off the excavated stuff 565.00 151.89 CUM
upto 50 Meter lead.(B) Dense or Hard soil
Filling available excavated earth (excluding rock) in trenches.
plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth
consolidating each disposited layer by ramming and watering.
Filling in foundation and plinth with murrum or selected soil in layers of
3 20cm. thickness including watering, ramming and consolidating etc. 300.00 293.36 CUM
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand :
6- hand broken stone aggregates 40 mmnominal size) and curing
complete excluding cost of formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete M.250 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of columns
and Mass concrete.
Providing TMT Bar FE 500D reinforcement for R.C.C. work including
6 bending, binding and placing in position complete upto floor two level 10200.00 76.52 Kg.
Providing formwork of ordinary timber planking so as to give a rough
finish including centering shuttering strutting and propping etc. Height
of propping and centering below supporting floor to ceiling not
7 exceeding 4 M. and removal of the same for in situ reinforced concrete 220.00 177.58 Sqmt
and plain concrete work in. (A) Foundations Footings Bases of Columns
etc. and Mass concrete.
Brick work using common burnt clay building bricks having crushing
strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular(ARC 2024-25 Building
Department Item no-163
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or half brick walls for interior plastering upto
floor two level and finished even and smooth in (i) Cement mortar 1:3
(1-cement:3-sand) Modular
Providing and laying polished Kota stone slab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1-cement : 6-coarse sand) or
L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and jointed with
grey cement slurry mixed with pigment to match the shade of slab
including rubbing and polishing etc. complete. (A) 25mm thick
Providing & fixing Polished granite stone 20 to 25 mm thick black
PROVIDING & LAYINGb 60 MM THK.RUBBER MOULDED INTERLOCKING
PAVER BLOCKS(M-40 GRADE) 50 MM THICK SAND BED INCL.
12 COMPACTION WITH MECH. COMPECTOR IN LINE , LEVEL AND COLOUR 650.00 913.00 Sqmt
AND DESIGN AS SELECTED BY ENGINEER INCHARGE
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
13 concret as per approved design and including excavation for fixing in 100.00 390.68 Rmt
proper line and level,filling the joint with C:M 1:3 (1cement:3fine sand)
Description Qty Rate Per Amount
Structural Steel work (confirming to IS 4923-1997)riveted bolted or built
up for all types section in framed work including cutting hoisting fixing
14 in position and appying a priming coat of approved steel prining all 7600.00 129.85 Kg.
complete as per the structural designs and directings of Engineer in
Painting two coats (excluding priming coat) on new steel and other
metal surface with enamel paint, brushing, interior to give an even
15 shade including cleaning the surface an even shade including cleanicn 300.00 89.11 Sqmt
the surface of all dirt, dust and other foreign matter.
Providing and fixing of Corner Angle for Various Flashing in 100mm x
100mm size in Equal Shape with 5mm edge lipping on both side . The
Angle Flashing shall be made out of 0.5 mm thick pre coated GI sheet
with edge bending of approximate 5mm. The Precoated sheet shall be
of minimum 240 mpa steel grade confirming to IS 14246:1995 and shall
16 have zinc coating of minimum 120 gsm as per IS:277:1992 , 5-7 microns 530.00 779.75 Sqmt
epoxy primer on both side of the sheet and polyester top coat 15-18
micron. The PPGI Sheet shall have plastic protective guard film of
minimum 25 microns to avoid scratches during transportation. The U
track shall be fixed with suitable POP rivet with wall and roof panels
with minimum spacing of 450 mm c/c
providing &Applying of weather proof exterior emulsion paint two coat
Providing and Fixing of chain link fencing ( Khata) with 50mm*50mm*6
mm M.S. angle with 50mm*50mm *10mm gauge jali., including
18 fabrication work with carting,excavation,PCC (1:2:4) and breaket 150.00 1137.00 Sqmt
sythetic enemal paint.
I/We am/are willing to carry out the work at… ..................... % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 SBD_South Zone.pdf
2.0 General Specifications.pdf
3. Price Bid_South.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].