Tender Value
₹60.8 L
EMD Value
₹60,800
Closing Date
13 Oct 2026, 6:00 pm
Chief officer-Maliya Miyana Nagarplaika
Operation and Maintenance for Water Supply Network And Structures in Maliya (Mi) Nagarpalika Area, Dist. Morbi.
348072
2026-27
Open
Civil Works - Water Works
Works
Morbi
3 documents required · 3 mandatory
₹2,832
Chief Officer Maliya Miyana Nagarpalika Maliya Miyana Dist. Morbi
₹60,800
23 Sept 2026
23 Sept 2026
23 Sept 2026
13 Oct 2026
23 Sept 2026
Area, Dist.Morbi.
Quantities Estimated Rates Total Amount
Quantities Estimated Rates Total Amount
Item Estimated according to
Item Descrption Unit
No. but may be estimated
in Figure in Words
more or less quantities.
Operation, Maintenance and Repair of Water
Supply Scheme including all labour,transportation
and all incidental charges for smooth functioning
of the water supply system for a period of
Rupees Six Hundred Four and
8.00 Labour charges - Operator for Machinery 604.63 Each
Paise Sixty Three Only
Rupees Six Hundred Four and
1.00 Labour charges - Electician 604.63 Each
Paise Sixty Three Only
Rupees Five Hundred Ninety
1.00 Labour charges - Plumber (Fitter) 591.05 Each
One and Paise Five Only
Rupees Five Hundred Ninety
6.00 Total No. of Valve Man 591.05 Each
One and Paise Five Only
Rupees Five Hundred Seventy
9.00 Total No. Unskilled Labour 579.74 Each
Nine and Paise Seventy Four Only
Total for 1 Days
Total for 365 Days
Providing, supplying and applying Chlorination
Powder (Bleaching Powder) containing minimum
30% available chlorine for disinfection of drinking
water supply system, including weighing, mixing, Rupees Thirty Five and Paise
preparation of chlorine solution, dosing at Head Sixty Only
Works/Water Treatment facility, operation and all
necessary labour, tools and equipment complete as
directed by Engineer-in-Charge
Providing, supplying and fixing of required spare
materials such as water supply pipes, valves,
gaskets, joints, nuts & bolts, clamps, fittings and
other miscellaneous spare parts required for Rupees Six Lakh Thirteen
operation and maintenance of water supply Thousand Only
network and head works, including replacement,
minor repair works, labour, tools and all necessary
items complete as directed by Engineer-in-Charge.
Labour charges for cleaning of sump / GL cistern
including cleaning and removing algae,
calcinations, sludge, dirt deposition from bottom
and as well as from wall of container, disinfection
by bleaching powder with all necessary tools and
plants, labours and cost of disinfectant etc complete
Rupees Ten Thousand Four
1.00 Maliya Town NMC H.W 10 Lac 10470.75 Hundred Seventy and Paise No
Seventy Five Only
Rupees Five Thousand Two
1.00 Opp.Nagarpalika Office H.W 4 Lac 5234.80 Hundred Thirty Four and Paise No
Rupees Seven Thousand Eight
1.00 Behind Helth Center H.W 7 lac 7853.35 Hundred Fifty Three and Paise No
Thirty Five Only
Rupees Three Thousand Nine
1.00 Vada Vistar H.W 3 lac 3926.10 Hundred Twenty Six and Paise No
Rupees One Thousand Nine
1.00 Old Hanjiyasar Area 0.60 lac 1963.05 Hundred Sixty Three and Paise No
Rupees One Thousand Nine
1.00 New hanjiyasar Area 0.60 lac 1963.05 Hundred Sixty Three and Paise No
Labour charges for cleaning of RCC ESR
including cleaning and removing algae,
calcinations, sludge, dirt deposition from bottom
5 and as well as from wall of container, disinfection
by bleaching powder with all necessary scafolding,
tools and plants, labours and cost of disinfectant
Rupees Seven Thousand Five
1.00 Maliya Town NMC H.W 10 Lac 7590.00 No
Hundred Ninety Only
Rupees Three Thousand One
1.00 Opp.Nagarpalika Office H.W 4 Lac 3140.65 Hundred Forty and Paise Sixty No
Rupees Three Thousand Six
1.00 Behind Helth Center H.W 7 lac 3665.05 Hundred Sixty Five and Paise No
Rupees Three Thousand Ten and
1.00 Vada Vistar H.W 3 lac 3010.70 No
Paise Seventy Only
Rupees Two Thousand Six
1.00 Old Hanjiyasar Area 0.60 lac 2617.40 Hundred Seventeen and Paise No
Rupees Two Thousand Six
1.00 New hanjiyasar Area 0.60 lac 2617.40 Hundred Seventeen and Paise No
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after
deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
MALIYA (Mi) MUNICIPALITY
1) All the work shall be carried out as per MORTH specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions,
site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment
shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work
and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by
5) the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As
per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
7) Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments
and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
Signature of contractor CHIEF OFFICER
MALIYA (Mi) MUNICIPALITY
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01.NIT and Prequalification Water supply.pdf
02.SBD - Water supply.pdf
03.Schedule-B.pdf
04. General Condition.pdf
05.Scope of work.pdf
06 Drawing ward map.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .