Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC JOGINDER NAGAR | L1 | Accepted-AOC Awarded being L1 | |
| 2 | L2₹4.5 L+₹2,424.66 (0.54%)Rejected-AOC BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | UNA | HIMACHAL PRADESH | 174301 | L2 | Rejected-AOC Rejected being L2 | |
| 3 | L3₹4.6 L+₹6,490 (1.45%)Rejected-AOC | L3 | Rejected-AOC Rejected being L3 |
| Sl No | Description | Qty | Unit | Ankit Thakur Contractor L2 | SHUBHAM L3 | Ram Chander Paul L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in dumped stones or mulba including stacking of serviceable and un-serviceable material separetaly and disposed of unserviceable material lead upto 20 mtr. and lift upto 1.5 metres disposed material to be neatly dressed. | 12.4 | Cum | 550 ₹8,047.6 Lowest | 550 ₹8,047.6 Lowest | 650 ₹9,510.8 |
| 2.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,228.6 | Kg | 90 ₹1,30,477.32 Lowest | 90 ₹1,30,477.32 Lowest | 100 ₹1,44,974.8 |
| 3.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). including necessary roughening, cleaning and chipping work all as directed by Engineer in Charge | 11.48 | Cum | 8,200 ₹1,11,119.18 | 8,500 ₹1,15,184.52 | 8,100 ₹1,09,764.07 Lowest |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) including necessary roughening, cleaning and chipping work all as directed by Engineer in Charge | 16.4 | Cum | 8,000 ₹1,54,853.76 | 8,000 ₹1,54,853.76 | 7,400 ₹1,43,239.73 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 5.1 | Cum | 7,800 ₹46,940.4 | 7,800 ₹46,940.4 | 6,900 ₹41,524.2 Lowest |
Tender Value
₹4.5 L
EMD Value
₹4,496
Closing Date
17 Nov 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Resident Engineer
Bassi Power House Division, HPSEBL, Jogindernagar
Tender for repair of overflow channel at Chaprot under Bassi Power House Division HPSEBL Joginder Nagar
2025_HPSEB_120224_1
REB/DB-Tender(c)-06/2025-26
Open Tender
Civil Works
Item Rate
60 days
Chaprot Reservior
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹4,496
28 Nov 2025
11 Nov 2025
17 Nov 2025
11 Nov 2025
17 Nov 2025
11 Nov 2025
11 Nov 2025 - 17 Nov 2025
Amount
Excavation in dumped stones or mulba including stacking of serviceable and un-serviceable material separetaly and disposed of unserviceable material lead upto 20 mtr. and lift upto 1.5 metres disposed material to be neatly dressed.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). including necessary roughening, cleaning and chipping work all as directed by Engineer in Charge
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) including necessary roughening, cleaning and chipping work all as directed by Engineer in Charge
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Ankit Thakur Contractor (BID ID -584341)
SHUBHAM (BID ID -584342)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_176055.xls
BOQ • 0.23 MB
TERMSANDCONDITIONSC06.pdf
Tender Documents • 1.18 MB
ADDITIONALTERMSANDCONDITIONSC06.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .