| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L Quoted ₹1.9 L | L1 | Accepted-AOC Award |
| 2 | L2₹2.0 LRejected-Finance VILLAGE HALAG PO BANDHI TEHSIL AUT DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹2.0 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹2.0 LRejected-Finance | ₹2.0 L | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | DALEEP SINGH L3 | LABH SINGH L2 | LAL CHAND L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc in earth work lift up to 15 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick Jumper work. | 21.39 | Cum | 600 ₹12,834 | 500 ₹10,695 | 470 ₹10,053.30 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 20 mm nominal size) in foundation and plinth in all leads and lifts. | 2.24 | Cum | 8,700 ₹19,488 | 8,500 ₹19,040 | 8,200.5 ₹18,369.12 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size in all leads and lifts. | 1.55 | Cum | 10,050 ₹15,577.50 | 10,050 ₹15,577.50 | 10,050 ₹15,577.50 |
| 3.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 3.92 | Cum | 10,500 ₹41,160 | 10,500 ₹41,160 | 10,500 ₹41,160 |
| 4.00Providing and laying cement concrete 1:2:4 (1Cement : 2 sand : 4 graded crushed stone aggregate 20mm Nominal size and curing completre excluding the cost of form work and reinforcement for reinforced concrete work in all leads and lifts in :- | ||||||
| 4.01 | Suspended floors, roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers upto floor two level. | 1.12 | Cum | 9,500 ₹10,640 | 9,500 ₹10,640 | 9,500 ₹10,640 |
| 5.00Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including certring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for in-situ reinforced concrete & plain concrete work in all leads and lifts in:- | ||||||
| 5.01 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 52.2 | Sqm | 550 ₹28,710 | 550 ₹28,710 | 550 ₹28,710 |
| 5.02 | Flat surface such as soffits of suspended floors, roofs, landing and the like floor etc. upto 200mm in thickness as per direction and to the entire satisfaction of the Engineer-in-charge. | 9.72 | Sqm | 900 ₹8,748 | 900 ₹8,748 | 800 ₹7,776 |
| 6.00 | Providing & laying tor steel reinforcement for RCC work including bending, binding and placing in position complete indluding the cost of binding wire in all leads and lifts upto floor two level in all leads and lifts. | 593.1 | Kg | 102 ₹60,496.20 | 100 ₹59,310 | 90 ₹53,379 |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
6 Mar 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
C/O RCC Circular Sector Storage Tank 14000 Ltr Cap at village Bata
2026_HPIPH_129613_1
20846-945
Open Tender
Civil Works
90 days
Panarsa
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹4,000
3 Jun 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
Excavation in foundation trenches etc in earth work lift up to 15 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick Jumper work.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 20 mm nominal size) in foundation and plinth in all leads and lifts.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Providing and laying cement concrete 1:2:4 (1Cement : 2 sand : 4 graded crushed stone aggregate 20mm Nominal size and curing completre excluding the cost of form work and reinforcement for reinforced concrete work in all leads and lifts in :-
Suspended floors, roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers upto floor two level.
Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including certring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for in-situ reinforced concrete & plain concrete work in all leads and lifts in:-
Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge.
Flat surface such as soffits of suspended floors, roofs, landing and the like floor etc. upto 200mm in thickness as per direction and to the entire satisfaction of the Engineer-in-charge.
Providing & laying tor steel reinforcement for RCC work including bending, binding and placing in position complete indluding the cost of binding wire in all leads and lifts upto floor two level in all leads and lifts.
Providing and Fixing of steel/fiber reinforcement concrete (SFRC) Manhole Cover with Frame conforming to IS-12592 (Part- I)-1998 with latest ammendments 560 mm dia in all leads and lifts.
Please Enable Macros to View BoQ information
Terms and conditions
The work shall be executed as per HPPWD/JSV/ ISI specifications and to the entire satisfaction of the Engineer-in-charge.
The Cement, Steel Deptt. at JSV Divisional store Raghunath Ka Padhar Mandi cement @ 368/- per bag & Steel Rs.7615/-only per qtl ..
The contractor shall be fully responsble for watch and ward of the material at site of work.
Nothing shall be paid for rejected material/work.
1% labour cess will be deducted from the bill of the contractor.
Concrete work shall be done by using vibrator and concrete mixing plant.
Crushed aggregate will be used in concrete work.
Material should be used of approved quarry.
The work should be completed in the stipulated period.
The rates should be inclusive with GST and carriage .
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form6.pdf
Tender Documents • 0.67 MB
BOQ_191624.xls
BOQ • 0.25 MB
Form8.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid