Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.0 LAccepted-AOC | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹28.0 L+₹755 (0.03%)Rejected-Finance | 2 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
29 Jan 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
U.M.B.D.G.C.KHURJA
CONSTRUCTION OF V.R.B.
2021_UPIDC_545204_33
05/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
60 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹56,000
1 Apr 2021
23 Jan 2021
29 Jan 2021
23 Jan 2021
29 Jan 2021
23 Jan 2021
90 days
Amount
Dismantling of old R.C.C work in slab including stacking of material within 60m distance
Dismantling of old brick work with cement mortor including stacking of material within 60m distance
Earth work in excavation in foundation in all types of soil i/c lift. 1.50 m and lead up to 30 m. with raimming and dressing etc.
Laying C.C in 1:4: 8 Cement/ coarse sand / Stone Grite i/c all of Material, Labour T&P etc
M-100 brick work in 1:4 C.M including all cost of material ,Labour, T&P etc
12 mm Thick plaster in 1:4 cement morter including all cost of material, Labour T&P etc.
Centering & Shuttering for R.C.C work including all cost of material , Labour T&P etc
Laying Reinforcement Steel in R.C.C work with cutting binding ,belding and placing in position including all cost of material, Labour T&P etc.
Supplying & Fixing Joint Filler board Including all cost of material, Labour, T&P etc.
Supplying & Fixing 75 mm dia P.V.C pipe Including all cost of material, Labour, T&P
Laying R.C.C work in 1:1.5:3 cement/ coarse sand/ Stone Grite including all cost of material ,Labour T&P etc.
Laying.C.C in 1:1.5:3 cement/ coarse sand/ Stone Grit in bearing coat including all cost of material ,Labour T&P etc.
Earth work in filling in back of Retaining wall including lift 1.50m and lead upto 600m with raimming & Dressing etc
Laying Dry brick on edge kharnja on ramp including all cost of material, Labour T&P Etc..
Dewatering with diesel pump set of 7.50 H.P including all cost of material , labour T&P etc.
SANDHYA SHARMA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .