Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹55.0 LAccepted-AOC | ₹55.0 L | l1 | Accepted-AOC Lowest rate and hence the the work is awrded to the contractor vide resolution23(1)/2025 dtd22.10.2025 |
| Sl No | Description | Qty | Unit | ABINJOSEPH L1 |
|---|---|---|---|---|
| 1.00 | Supplying and stacking in standard profile and heap for measurement at site Quarry waste ,including all cost and conveyance and all labour charges including stacking etc complete | 481.61 | 1 M3 | 1,345 ₹6.5 L |
| 2.00 | Collection of earth ncluding all cost
conveyance labour charges etc complete. | 18.36 | 1 M3 | 459 ₹8,427.24 |
| 3.00 | Collection of STONE including all cost conveyance labour charges etc complete. | 254.55 | 1 M3 | 1,577 ₹4.0 L |
| 4.00 | Collection ofStone aggregate 40 mm nominal sizeincluding all cost conveyance labour charges etc complete. | 328.81 | 1 M3 | 2,217.6 ₹7.3 L |
| 5.00 | Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 20 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete | 151.52 | 1 M3 | 2,217.6 ₹3.4 L |
| 6.00 | Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 10 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete | 73.75 | 1 M3 | 2,217.6 ₹1.6 L |
| 7.00 | Supplying and stacking in standard profile and heap for measurement at site Stone aggragate 6 mm nominal size ,including all cost and conveyance and all labour charges including stacking etc complete | 15.4 | 1 M3 | 2,271 ₹34,973.40 |
| 8.00 | Supplying and stacking for measurement at site Portland Cement (ISI standard) , including all cost and conveyance and all labour charges including stacking etc complete | 205.6 | tone | 8,760 ₹18.0 L |
| 9.00 | Supplying and stacking in standard profile and heap for measurement at site Coarse Sand - zone III (M sand for concrete work) ,including all cost and conveyance and all labour charges including stacking etc complete | 286.81 | 1m3 | 2,448.6 ₹7.0 L |
| 10.00 | Collection of twisted steel/deformed bars
cost conveyance labour charges etc complete. | 6.63 | qtl | 11,181.68 ₹74,134.54 |
Tender Value
₹61.5 L
EMD Value
₹50,000
Closing Date
15 Oct 2025, 3:00 pmClosed
Secretary balussery grama panchayath
Secretary balussery grama panchayath
Material supply of mgnrega works ward 9--12
2025_DP_799987_2
SEC/BLSY/MGNREGS/15/2025-26
Open Tender
Civil Works - Others
Balussery grama panchayath
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
2 Jun 2026
7 Oct 2025
16 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid