| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC THIRUVILAKKIL SANATHANAPURAM P O ALAPPUZHA AMBALAPPUZHA TALUK ALAPPUZHA DISTRICT | ₹5.9 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹6.1 L+₹22,854.80 (3.90%)Rejected-AOC | ₹6.1 L+₹22,854.80 (3.90%) | L2 | Rejected-AOC 2ND LOWEST |
Tender Value
₹6.2 L
EMD Value
₹9,380
Closing Date
12 Jan 2022, 5:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER
compound wall CONSTRUCTION
2022_LSGD_464872_9
T5/AE/PKD/21-22
Open Tender
Civil Works - Buildings
Item Rate
180 days
W10 OF PURAKKAD GP
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,250
₹9,380
22 Feb 2022
4 Jan 2022
15 Jan 2022
5 Jan 2022
12 Jan 2022
5 Jan 2022
Amount
earth work
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.39.1 : Colour washing such as green, blue or buff to give an even shade:New work ( two or more coats) with a base coat of white washing with lime
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
od1438005/2021_2022 : supply and fixing nameboard as per the direction of engineer in charge
BERLY VARGHESE
Bidder Name
BAIJU V
BERLY VARGHESE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_665618.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .