Tender Value
₹45.5 L
EMD Value
₹46,000
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer, Rajkot Irrigation Division, Rajkot.
THIRD ATTEMPT SANKROLI IRRIGATION SCHEME. Resurfacing of Existing Asphalt Dam Approach Road of Sankroli Irrigation Scheme
311396
SBD-08 of 2026-27
Open
Civil - All
Rajkot
5 documents required · 5 mandatory
₹1,500
Executive Engineer, Rajkot Irrigation Division Rajkot
₹46,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
NAME OF WORK :-
Resurfacing of Existing Asphalt Approach Road of Sankroli Irrigation Scheme.
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Clearing and grubbing road land including uprooting rank, vegetation, grass 1.16 Ha. 28455.09 Rupees: Twenty Eight
bushed, shrubs, saplings and trees girth up to 300mm removal of stumps of trees Thousand Four Hundred
cut earlier and disposal of unserviceable materials and stacking of serviceable Fifty Five & Ps. Nine
materials to be used of ouctional upto a lead of 1000mt. Including removal and Only.
disposal of top organic soil not exceeding 150mm in thickness.
(c) by mechanical means in area of light jungle.
2 Preparing surface by brushing with wire brushes for removing caked mud etc. 13392.00 Sqm. 18.74 Rupees: Eighteen & Ps.
sweeping with brooms and finaly fanning the cleaned surface with gunny bags to Seventy Four Only.
remove all loose dirt etc.
(II) Black Top Surface
3 Providing, laying and rolling of 25 mm thick open graded premix bitumenous 770.00 M.T. 2469.11 Rupees: Two Thousand
carpet with B.T. aggregate as specified and using bitumen VG-30 on BT Surface Four Hundred Sixty Nine
and using bitumen VG-30 for mixing with aggregates at rate of 3.40 % i.e. 34.00 & Ps. Eleven Only.
Kg/M.T. of total mix including heating and mixing drum plant, spreading the same
with paver finisher and consolidation with vibrator roller necessary fire, wood, oil,
lubricants, labour charges etc. using contractor’s own Drum Mix Plant and
equipment tools etc. completed in accordance with the requirement of
4 Providing and laying 20 mm thick Mix Seal surface (M.S.S.) using stone chips as 616.00 M.T. 2888.28 Rupees: Two Thousand
per MORTH specification using 60/70 grade bitumen at rate of 50.00 Kg/M.T ie Eight Hundred Eighty
5.00 % by weight of total mix using Drum mix plant and laid by paver finisher Eight & Ps. Twenty
including consolidation with vibrator roller including heating the asphalt inluding Eight Only.
all necessary equipment tools, plants, oil, fire, wood and kerosene and all labour
charges etc complete (Including using contractor"s own drum mix plant and
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
5 Providing and laying Asphalt painting on B.T. surface with bitumen V.G. 30 13392.00 Sqm. 25.301 Rupees: Twenty Five &
Graded at rate 5.00 K.G./ Sq.mt by Mrchanical sprayer in uniform layer and Ps. Three Zero One
spreading the stone dust on prepared surface at the rate of 0.03 Cum/10 sq.mt Only.
and rolling with smooth wheel roller
6 Providing murrum including spreading the same and dressing the side slope & top 1032.75 Cum. 237.46 Rupees:Two Hundred
surface in required grade and camber with lead upto 5.00 Km etc. complete. Thirty Seven & Ps. Forty
For Road Side Solder Six Only.
Rupees: Forty Five Lacs Forty Eight Thousand Four Hundred Thirty Six & Ps. Ninety Seven Only.
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated rates
mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P 1 to 16.pdf
2- SBD Approach Road - Sankroli P. 1 to 166.pdf
3 Paripatra P 167 to 191 R and B.pdf
4 Sch B - Approach Road - Sankroli P 192 to 193.pdf
Download all tender documents and submit your bid