| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 CrAccepted-AOC | ₹33.3 Cr Quoted ₹33.8 Cr | L1 | Accepted-AOC Negotiated Amount |
| 2 | L2₹34.8 CrRejected-Finance | ₹34.8 Cr | L2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | Aquachem Enviro Engineers Pvt. Ltd. L1 | HUBERT ENVIRO CARE SYSTEMS LTD L2 |
|---|---|---|---|---|---|
| 1.00Construction | |||||
| 1.01 | Construction of 6m diameter Intake Well. | 1 | Lumpsum | 65,00,000 ₹65 L | 35,54,160 ₹35.5 L |
| 1.02 | Construction of RC Frame Pump House near Intake Well of minimum area 15sq.m. and height 4m. | 1 | Lumpsum | 18,00,000 ₹18 L | 5,56,960 ₹5.6 L |
| 1.03 | Installation of Pump Set powered by 30HP motor capable of pumping 100 cubic meters per hour and a head range of 40-50 meters for drawing and conveying water from Intake Well to WTP System within the Pump House near Intake Well. | 1 | Lumpsum | 18,50,000 ₹18.5 L | 10,30,140 ₹10.3 L |
| 1.04 | Laying of 250mm HDPE rising main of adequate pressure, including thrust blocks at 200m intervals and Pipe Crossings using RCC casing pipes for conveying from Intake Well to Site. (Approximately 2200m) | 1 | Lumpsum | 93,00,000 ₹93 L | 1,02,33,668 ₹1.0 Cr |
| 1.05 | Construction and Installation of 1MLD Water Treatment Plant. | 1 | Lumpsum | 8,85,50,000 ₹8.9 Cr | 4,98,27,860 ₹5.0 Cr |
| 1.06 | Construction of 18m x 19m x 4.5m Domestic Water Central Overhead Service Reservoir (DWC OHSR) 20m above ground formation level. | 1 | Lumpsum | 1,47,00,000 ₹1.5 Cr | 94,70,680 ₹94.7 L |
| 1.07 | Laying of PE pipe of adequate pressure, diameter and length as per the approved desgin for water supply distribution network. | 1 | Lumpsum | 7,80,000 ₹7.8 L | 88,31,120 ₹88.3 L |
| 1.08 | Laying of DI / uPVC pipe of adequate pressure, diameter and length as per the approved desgin for waste water collection network including Lifting Station Sump and Pump Sets. | 1 | Lumpsum | 10,50,000 ₹10.5 L | 69,69,080 ₹69.7 L |
| 1.09 | Construction and Installation of 500kLD Common Effluent Treatment Plant (CETP). | 1 | Lumpsum | 12,99,00,000 ₹13.0 Cr | 14,94,49,360 ₹14.9 Cr |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
16 Feb 2026, 11:00 amClosed
Reji John
Director Finance
REQUEST FOR PROPOSAL (RFP) FOR APPOINTMENT OF CONTRACTOR FOR DEVELOPMENT AND OPERATION OF COMMON EFFLUENT TREATMENT PLANT AND WATER TREATMENT PLANT AT INDUSTRIAL RUBBER COMPLEX AT VELLOOR, KOTTAYAM DISTRICT, KERALA
2026_KIIFC_830015_1
KRL/N/CETPWTP/MX/DOC011
Open Tender
Civil Works - Others
450 days
velloor
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹5 L
velloor, Kottayam
19 May 2026
22 Jan 2026
17 Feb 2026
22 Jan 2026
16 Feb 2026
22 Jan 2026
22 Jan 2026 - 29 Jan 2026
30 Jan 2026
Construction of 6m diameter Intake Well.
Construction of RC Frame Pump House near Intake Well of minimum area 15sq.m. and height 4m.
Installation of Pump Set powered by 30HP motor capable of pumping 100 cubic meters per hour and a head range of 40-50 meters for drawing and conveying water from Intake Well to WTP System within the Pump House near Intake Well.
Laying of 250mm HDPE rising main of adequate pressure, including thrust blocks at 200m intervals and Pipe Crossings using RCC casing pipes for conveying from Intake Well to Site. (Approximately 2200m)
Construction and Installation of 1MLD Water Treatment Plant.
Construction of 18m x 19m x 4.5m Domestic Water Central Overhead Service Reservoir (DWC OHSR) 20m above ground formation level.
Laying of PE pipe of adequate pressure, diameter and length as per the approved desgin for water supply distribution network.
Laying of DI / uPVC pipe of adequate pressure, diameter and length as per the approved desgin for waste water collection network including Lifting Station Sump and Pump Sets.
Construction and Installation of 500kLD Common Effluent Treatment Plant (CETP).
Construction of 16m x 8m x 4.5m Treated Wastewater Central Overhead Service Reservoir (TWC OHSR) 20m above ground formation level.
Laying of DI / uPVC pipe of adequate pressure, diameter and length as per the approved desgin for treated wastewater distribution network.
Construction of 1 storeyed RC Frame Laboratory of size 5m x 6m x 3.5m.
Installation of DG Set to ensure uninterrupted power supply during operations and maintenance of CETP, WTP and associated infrastructure.
Installation of Online Monitoring and Control System (SCADA) for CETP, WTP and associated infrastructure.
Applicable Permits
O&M Charges for Water Supply System (1MLD WTP, Pumps, OHSR, Supply Network, etc.) per month excluding Power charges
O&M Charges for Common Effluent Treatment System (500kLD CETP, Pumps, OHSR, Collection Network, etc.) per month excluding Power charges
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Part_4_Drawings.pdf
Other Document • 27.42 MB
Part_3_Technical_Specifications.pdf
Other Document • 1.89 MB
Part_2_Employers_Requirement.pdf
Other Document • 0.51 MB
Part_4_Master_Plan_Drawing.pdf
Other Document • 3.69 MB
Part_4_Site_Formation_Levels_Drawing.pdf
Other Document • 2.01 MB
Part_5_Contract_Agreement_and_Contract_Forms.pdf
Other Document • 0.67 MB
BOQ_1394136.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid