Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹15.3 L
EMD Value
₹38,500
Closing Date
7 Mar 2024, 4:00 pmClosed
DIVISIONAL FOREST OFFICER
DIVISIONAL FOREST OFFICER DIVISIONAL FOREST OFFICE KANNUR
EXTRACTION OF ACCACIA MANGIUM EUCALY TREES FROM CHERUVANCHERY CENTRAL NURSERY COMPOUND KANNAVAM RANGE DURING 2023 24
2024_FD_654489_2
KN 18669/23
Open Tender
Agricultural or Forestry
Item Rate
60 days
KANNAVM
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹38,500
16 Mar 2024
26 Feb 2024
11 Mar 2024
26 Feb 2024
7 Mar 2024
26 Feb 2024
Amount
Felling, Conversion, Classification including dressing drag holding wherever necessary and chisel numbering for hardwoods for 1/2 Cum (including VDA @ 118 and CP 10%)
Felling, Conversion, Classification including dressing drag holding wherever necessary and chisel numbering for hardwoods for above 1/2 Cum (including VDA @ 118 and CP 10%)
Cross cutting with saw below 125 cm in girth (including VDA @ 118 and CP 10%)
Cross cutting with saw below 125 cm to 150 cm in girth (including VDA @ 118 and CP 10%)
Cross cutting with saw above150 cm in girth (including VDA @ 118 and CP 10%)
Manual labour upto an average lead of 400 M (including VDA @ 118 and CP 10%)
Elephant dragging
Loading timber in lorries
Transport of timber in lorries to Kannoth timber Depot
Unloading timber (including VDA @ 118 and CP 10%)
Construction of temporary shed (including VDA @ 118 and CP 10%)
Billetting and stacking Accacia, Mangium, Eucaly firewood (including VDA @ 118 and CP 10%)
Transport ofAccacia, Mangium Eucaly firewood by headload 20 M upto 200 M (including VDA @ 118 and CP 10%)
Clearing boundary line to width of 5.2 M for and scrapping 1.8 M on eihter side and fire tracing the central belt of 1.6 M for taking fire line (including VDA @ 118 and CP 10%)
Earthwork excavation by mechnaical means (Hydraulicexcavation) / manual means (exceeding 30 cm in depth 1.5 cm in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 mtr and lift up to 1.5 M in width, disposal earth to be levelled and neately dressed all kinds of soil (including cost index 33.9%)
ASOKAN V K
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1029872.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .