Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance 512 CHITTILAKATTU IRIPANAM TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
24 Oct 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Dismantling, Shifting, Reinstallation of Diesel Engines and Commissioning of Electric Motors, with its Pumps in Phase-1 Workshop, FACT CD
2025_FACT_880751_1
4032/2025-2026/E32283
Limited
Miscellaneous Works
Item Rate
30 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹2,000
Yes
25 Oct 2025
9 Oct 2025
25 Oct 2025
9 Oct 2025
24 Oct 2025
9 Oct 2025
Dismantling, Shifting, Reinstallation of Diesel Engines and Commissioning of Electric Motors, with its Pumps in Phase-1 Workshop, FACT CD
Dismantling the existing fire hydrant diesel engine-1 & 2: The work involves: The contractor shall collect and transport all necessary tools, chain blocks, and lifting tackles from the tool crib to the site. All work shall commence only after receiving clearance from the Engineer-in-Charge. The existing diesel engine-1 & 2 shall be decoupled from the pump, and all foundation bolts, pipelines, and fittings shall be removed. The suction, discharge, and associated lines shall be disconnected from the pump and diesel engine. The pump of diesel engine-1 shall also be dismantled from the suction and discharge line and all foundation bolts, and fittings shall be removed. The diesel engine-2 and pump on the diesel engine-1 platform shall be sent to the workshop for reconditioning. After removal, the foundation of diesel engine-1 shall also be dismantled and the site shall be clear for fixing of the new electric motor and pump.
Installation of the Engine-1 to Engine-2 platform: The work involves: The diesel engine-1 shall be fixed on diesel engine-2 platform, the diesel engine shall be fixed on the frame using a water level check for proper levelling, coupling shall be fixed. The rigging assistance shall be provided for the alignment of the diesel engine. The foundation bolts shall be inserted and tightened as per instructions. Suction and discharge lines, along with necessary gauges, valves, and associated connections, shall be assembled and properly fitted. Any required modifications in the pipeline shall be carried out as per site conditions and Engineer-in-Charge’s directions. A trial run shall be conducted to ensure proper installation and functioning and and any works necessary to ensure a successful trial run of the diesel engine and pump shall be carried out.
Installation of the Electric Motor with Pump: The work involves: The contractor shall collect and transport all necessary tools, chain blocks, and lifting tackles from the tool crib to the site. All work shall commence only after receiving clearance from the Engineer-in-Charge. The new pump, motor, frame, and all accessories shall be securely lifted from the stores and transported to the fire pump house area. The frame shall be placed in diesel engine-1 position for completion of civil works. After civil works completion the work shall commence only after receiving clearance from the Engineer-in-Charge. The base plate shall be cleaned thoroughly before installation. The foundation bolts shall be inserted and tightened as per instructions. The new motor and pump shall be fixed on the frame using a water level check for proper levelling, coupling shall be fixed. The rigging assistance shall be provided for the alignment of the electric motor and pump. Suction and discharge lines, along with necessary gauges, valves, and associated connections, shall be assembled and properly fitted. Any required modifications in the pipeline shall be carried out as per site conditions and Engineer-in-Charge’s directions. A trial run shall be conducted to ensure proper installation and functioning and any works necessary to ensure a successful trial run of the motor and pump shall be carried out. After successful completion, the contractor shall clear the site, return all borrowed tools and tackles to the tool crib/store, and transport any damaged or worn-out parts to the scrap yard or workshop as instructed.
Abdul Rasheed K K (BID ID -3303774)
V M ALIAS (BID ID -3302683)
VIKRAMAN NAIR S (BID ID -3302010)
HASSAN MM (BID ID -3303931)
finance_925742.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocuments.pdf
Tender Documents • 1.29 MB
BOQ_925742.xls
BOQ • 0.25 MB
Compliance.pdf
Tender Documents • 0.10 MB
SpecialConditions.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .