Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
7 Sept 2026, 6:00 pm
DEPUTY CITY ENGINEER-3 SOUTH ZONE
Colour Work in various Municipal properties Buildings in Maninagar Ward of South Zone ARC
338152
Tender Notice No 05 Tender No 360
Open
Miscellaneous Works
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹15,000
24 Aug 2026
24 Aug 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
Name of Work:- Colour work in various Municipal properties/Building’s in Maninagar Ward
of South Zone (ARC)
Sr. Qty Items Rate Per Amount
1 1500.00 White / Colour washing with lime on 12.29 Smt
undecorated wall surfaces (two coats) to give
an even shade including thoroughly brooming
the surface to remove all dirt, dust mortar
drops and other foreign matter.
2 250.00 White washing with lime on wall surfaces 5.67 Smt
(one coats) to give an even shade including
thoroughly brooming the surface to remove
all dirt,dust,mortar drops & other
3 11000.0 Finishing Wall With Apex Ultima Acrylic Paint 79.00 Smt
0 Of " Asian Paint " Or Equivalent On Wall
Surfaces (Two Coats) To Give Required
Even Shade After Application Of Exterior
Primer Of Approved Brand & Manufactures
After Thoroughly Brushing The Surface To
Remove All Dirt & Remains Of Loose
Powered Materials.(N.S.)
4 2000.00 Wall painting (two coats) with plastic 78.44 Smt
emulsion paint of approved brand and
manufacture on undecorated wall surface to
give an even shade including throughly
brushing the surface free from mortar
droppings and other foreign matter and sand
papered smooth..
5 10.00 Extra over item 4 for every subsequent coat 33.39 Smt
of wall painting with plastic emulsion pain of
approved brand.
6 10.00 Extra over item 4 for painting with plastic 5.36 Smt
emulsion paint of approved brand on ceilings
and sloping roofs.
7 50.00 Painting two coats (excluding priming coat) 86.94 smt
on new steel and other metal surface with
enamel paint, brushing, interior to give an
even shade including cleaning the surface an
even shade including cleanicn the surface of
all dirt, dust and other foreign matter.
8 997.00 Scraping oil paint from steel and other metal 48.83 smt
surface and making the surface even (with
Hand Scraping.)
9 900.00 Painting one coats (excl. priming coat) on 54.35 Smt
peviously painted steel & other Metal
surfacer with enamel paint, brushing, interior
to give an even shade incl. cleaning the
surface of all dirt, dust and other foreign
10 500.00 Extra ove ritem 7 and 9 for every sub sequent 50.40 Smt
11 150.00 Painting two coats (excluding priming coat) 87.11 smt
on new wood and wood based surface with
enamel paint, interior to give an even shade
including cleaning the surface of all dirt, dust
and other foreign matter sand papering and
12 250.00 Painting one coats (excluding priming coat) 55.13 Smt
on previously painted wood and wood based
surface with enamel paint, to give an even
shade including cleaning the of all dirt, dust
and other foreign matter.
13 200.00 Extra ove ritem 11 and 12 for every sub 51.83 Smt
sequent coat of paint.
14 50.00 Finishing wall with weather proof exterior 113.40 Smt
emulsion paint on wall surface (two coats) to
give an required shape even shade after
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered
materials.etc complete
15 100.00 Distempering with dry distemper of approved 46.94 Smt
brand & manufacture (twocoats) and of
required shade on wall surfaces to give an
even shade over & including priming coat of
whiting after thoroughly brooming the surface
free from mortar dropping & other foreign
16 400.00 Distempeing (Two coats) with oil bound 76.08 Smt
distemper of approved brand and
manufacture and of required shade on wall
surfaces to give an even shade, over and
including a priming coat with distemper
primer of approved brand and manufacture
after thoroughly brushing the surface free
from mortar dropping and other foreign matter
and also including preparing the surface even
and sand papered smooth.
17 10.90 Extra over Item 15 and 16 for every 30.09 Smt
subsequent coat of approved brand and
18 0.00 Extra over Item 15 and 16 for distempering 8.04 Smt
with oil bound washable distemper on celling
and sloping roofs.
19 800.00 Removing dry or oil bound distemper by a 11.19 Smt
washing and scraping and sand papering the
wall surface smooth including necessary
repairs to scratches complete.(SOR 2021-22
20 12.35 Extra over item 19 for removing dry oil bound 1.58 Smt
distemper on ceilings and sloping roofs.(SOR
21 100.00 Providing Scaffolding for Demolation , Plaster 40.00 Smt
work & painting work by "H" Frame Stand of
by any means like bamboo, valli etc. inluding
carting material work site and removing after
compltion of work. Rate include any type rent
etc complet for any height as directerd by
engg. incharge.I00899 (App Rate)
22 40.00 Arrangement of zula with two or nece. skilled 950.00 No
labour for repairing & maintenance work out
side building work etc.complete as per
insructer incharge(At any floor level)
23 1600.00 Applying two coats of Birla (white cement 40.19 Smt
based) or Asian (acrylic lapy- putty) or
equivalent & two coats of primer of approved
brand and manufacture on new wall surface
to give an even shade including thoroughly
brushing the surface free from mortar
dropping and other foreign matter and sand
papered smooth.
24 100.00 Providing and applying texture paint at 495.00 Smt
approved quality, colour scheme, including
preparation of surface, primer 2 coats+2
coats of putty and texture paint, as per
manufacture's specification, scaffolding, roller
finish etc complete as per instruction of
engineer in charge
25 1000.00 Applying priming coat over old kerb surface 19.46 Sq.M.
after and including,preparing the surface with
ready mixed priming paint brushing red lead
26 1000.00 Painting Two Coats on divider and footpath 64.16 Sq.M.
curb surface / New Concrete Surface (
Painting two coats after filling the surface with
synthetic enamel paint in all shades on new
plastered concrete surfaces)
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl.City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for
the work mentioned below.
1 Name of work Colour Work in various Municipal properties / Building’s in
Maninagar Ward of South Zone (ARC)
2 Time Limit 12 Months
3 Tender Validity Period 120 days from the date of submission of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC orequivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.15000.00 Demand Draft Or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad to be submitted as prescribed
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand Draft
in favour of Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
10 Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to
Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate ( One
Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this
own exppence any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
complition, The within 15 days of recipts of the notice. In the case of
failure on the part of the contractor, the Engineer incharge may rectfy
or remove or reexecute the work at the risk & cost of the contractore.
The Engineer incharge shall be entitled to appropriate the whole or
any part of the amount of cicurity deposit towrdes they expences, If
any, incurred by him in rectification, removal or re- execution. The
defect liability period shall be as under (a) for all works costing up to
Rs. 50,000 (amount put to tender), the period shall be three months
from the cirtified date of complition. (b) for all workscosting more
than Rs. 50,000 and upto Rs. 1 crore (Amount put to tender) ,the
period shall be six (6) month from the cirtified date of compition or
one monsoon , which ever letter.(c) the major project costing more
than Rs. 1 crore , the period shall be 12 months from the cirtified date
of complition which should include one monsoon.(d) For building
works , the period specified in (a) ,(b) & (c) above or elapse of
monsoon period following cirtifide date of complition.,whichever is
letter . For the purpose of deciding the monsoon period, the
september may be treated as the last date.
16 Compansation for Delay 0.1% per day delay of remaining work after the completion date but
not more than 10% of cost of remaining works.
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from each
Money from each RA RA bill. It will be released along with release of payment of Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
Tender And The Same As to be Attached Along With The Tender
19 For E.P.F. Act. As per Account department cicular no.27, date-07/01/2026
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-2022.
The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any or
all the tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Addl.City Engineer
13. ftuLx[tfxh ÷tht R.ve.yuV hSMx[uNl ykdu lt y.Bgw.ftuvtuou.mhfgwjhlk.27, <t.07.01.2026 bwsc R.ve.yuV hSMx[uNl hsw fhJtlw hnuNu .
ftuLx[tfxhlemne - rm¬tu yuze.mexe Rsluh
btuctEjlkchmt&u (œrûtKÍtul)
FOR BANK GUARANTEE
Seal and Signature of the Bidder Addl.City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Addl.City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad MunicipalCorporation,
A'bad specified up to his first written demand, without demur without delay andwithout the necessity
of a previous of judicial or administrative procedures and without thenecessity to prove to the Bank
the defects or short comings or debits of the contractor any sumwithin the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Addl.City Engineer (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: Colour Work in various Municipal properties / Building’s in Maninagar Ward of
South Zone (ARC).
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the
above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have
visited site & fully acquainted with local situations regarding materials, labours & others factorspertaining to
work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument
and with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B or
at such other rates as maybe fixed under the provisions of these conditions.In the event of this tender being
accepted I/We agree to enter into an agreement and when required andexecute the contract, according to your
fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC fromthe
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and takenecessary action
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for thesum
as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer IfI/We fail to
commence the work specified. Otherwise the said sum shall be retained, by the Employer as onaccount of such.
Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR.ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs
ðgth ctœ Jfo ytuzoh R~gw&gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu<u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo
ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h
(œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the ftuLx[tfxhle
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht
^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ
WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e
hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo
sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg
<ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the
vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu
BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu<ulu vubuLx ytvJtbtk ytJNu lrn <ubs
ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu
ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn
fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo
>ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt
Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l
&E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb
NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l ntug
<tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu.
J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne
juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj
ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle
m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe Rsluh
btuctEj lkch mt&u (œrûtK Ítul)
yufhthlwk Vtubo
(1)nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
(2)nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe Rsluh
btuctEj lkch mt&u (œrûtK Ítul)
" ybœtJtœ BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ
J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe>huf ytExbbtk J^^x
&tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu
CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb
fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl
meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn
yLg&t htuslt Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk
ftuLx[tfxhle mne - rm¬tu yuze.mexe Rsluh
btuctEj lkch mt&u (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as
per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be
final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected
materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall
have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add.City Engg.shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and
the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim
for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully :-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as
per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP Addl.City Engineer
Mobile No.:- ( South Zone)
Name of Works: - Colour Work in various Municipal properties / Building’s in Maninagar Ward of
South Zone (ARC)
TECHNICAL SPECIFICATIONS
White Washing With Lime On Undecorated Wall Surfaces (Two Coats) To Give AnEven Shade
Including Thoroughly Brooming The Surface To Remove All Dirt, Dust Mortar Drops And Other
Foreign Matter.
White / Colour Washing With Lime On Undecorated Wall Surfaces (Three Coats) To Give An Even
Shade Including Thoroughly Brooming The Surface To Remove All Dirt, Dust Mortar Drops
And Other Foreign Matter
1.1 The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably
tinted where required for use under coloured distemper if required. Glue shall conform to I.S. 852-1969
(Specifications for animal glue).
1.2 Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S. 712-
1973. Water shall conform to M-1 Best quality of gum shall be sued in the preparation of white wash.
Ultramarine blue or Indigo: This shall conform to I.S. 55-1970 for points and shall be used for preparation
of white wash. Pigments: mineral colours, not affected by lime shall be sued in preparing colour wash.
2.0 Workmanship :
2.1 Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and
stirred with about five litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be
allowed to stand for a period of 24 hours and then shall be screened through a clean coarse cloth, 4kg. of
gum dissolved in hot water shall be added to each cubic metre of lime cream. Small quantity of
ultramarine blut (Upto 3 gms. Per kg. of lime) shall also be added to the last two coats of white wash
solution and the whole solution shall be stirred thoroughly before use.
2.2 Preparation of surface :
2.2.1 The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters
before white wash is to be applied.
2.2.2 The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or
shall be rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all
dust, dirt and shall be washed with clean water.
2.2.3 Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire
2.2.4 All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular
patches and plastered again after raking the masonry joints properly. Such portion shall be wetted and
allowed to dry. They shall then be given one coat of white wash.
2.2.5 All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with
materials similar in composition to the surface to be prepared.
2.3 Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far
aspossible on part of scaffolding shall rest against the surface to be white or coloured washed. A
properly secured strong and well tied suspended platform (Zoola) may be used for white washing.
Where ladders are sued, pieces of old gunny bags shall be tied at top and bottom to prevent
scratches to the floors and walls. For white washing of ceilings proper stage scaffolding shall be
erected where necessary.
2.4 Application of white wash :
2.4.1 On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of
the brush shall be from top downwards, another from bottom upwards over the first stroke and
similarly one stroke from the right another from the left, over the first stroke brush before the it dries.This
will from one coat. Each coat shall be allowed to dry before next coat is applied. Number coats as
specified in item shall be applied. It shall present smooth and uniform finish free from brush marks and it
should not come off easily when rubbed finger.
2.4.2 Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the
surface cleaned.
2.4.3 Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke
soot removed of oil and grease spots treatment for infection with effloresces moulds moss, funji and
kitchen and patch repairs to plaster wherever done shall not be paid extra.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
3.0 Mode of measurements & payment :
3.1 All the work shall be measured in the decimal system as under :
(a) Dimensions shall be measured to the nearest 0.01 M.
(b) Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not
exceeding 0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not
exceeding 0.5 sq. mt. each in area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt.
each in area deductions and additions shall be made as under :
3.2 No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq.
mt. each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish
around ends of joints, beams, posts etc.
3.3 Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. of these openings :
(a) When both the faces or walls are provided with finish, deduction shall be made for one face only.(b)
When each face of wall is provided with different finish deduction shall be made for that side of frame for
door, windows etc. on which width of reveals is less than that of the other side, where width of reveals on
both faces of wall are equal, deduction of 50% of area of opening on each face shall be made from total
area of finish.
(c) When only one face of wall is treated and the other face is not treated, full deduction shall be made if
the width of reveal on the treated side is less than that on the untreated side, but if the width of the reveal
is equal or more than on the untreated side neither deductions nor additions be made for reveals, jambs,
soffits, sills etc.
3.4 In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs,
soffits, shall be measured.
3.5 No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the
3.6 corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be
increased by the following percentage and the resultant shall be included with thegeneral areas.
(a) Corrugated steel sheets 4%
(b) Corrugated A. C. Sheets 20%
(c) Semi corrugated A. C. Sheets 10%
(d) Nainital pattern roof (Plain sheeting with rolls) 10%
(e) Nainital pattern roof (with corrugated sheets) 25%
3.7 Cornices and other wall features, when they are not picked out in a different finish/colour shall be
girthed and included in the general area.
3.8 The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved
in all the operations described above.
3.9 The rate shall be for a unit of one sq. metre.
Finishing Wall With Apex Ultima Acrylic Paint Of " Asian Paint " Or Equivalent On Wall Surfaces
(Two Coats) To Give Required Even Shade After Application Of Exterior Primer Of Approved
Brand & Manufactures After Thoroughly Brushing The Surface To Remove All Dirt & Remains Of
Loose Powered Materials.(N.S.) - I00099
As Per Item & instructed by Engineer-in-charge.
The rate shall be for a unit of one sq. metre.
Wall painting (two coats) with plastic emulsion paint of approved brand & manufacture on under
coated wall surface to give an even shade including thoroughly brushing the surface free from
mortar droppings and other foreign matter and sand papered smooth.(N.S.) ( Building SOR - 2015-
16 Ch-18, Item No.18.57, Page no.202)
1.0 Materials :
1.1 Oil bound washable distemper and primer shall be of approved brand and manufacture. The
distemper shall be of required colour and shade and the same shall conform to I.S. 428-1969.
2.0 Workmanship :
2.1 Scaffolding : Where scaffolding is required, it shall be erected in such a way that as far as possible no
part of scaffolding shall rest against the surface to be distempered. A properly secured strong and well
tied suspended platform (Jools) may be used for distempering. Where ladders are used, pieces of old
gunny bags shall be tied at top and bottom to prevent scratches to the walls and floors. For distempering
to ceiling, proper stage scaffolding shall be erected where necessary.
2.2 Preparation of surface :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
2.2.1 The undecorated surface to be distempered shall be thoroughly brushed off from dust, dirt, grease,
mortar dropping and other foreign matter and sand papered smooth. New plaster surface shall be allowed
to dry for atleast 2 months before applications of distemper.
2.2.2 All unnecessary nails shall be removed. pitting in plaster shall be made good with plaster of paris
mixed with dry distemper of colour to be used. The surface shall then be rubbed down again with a fine
grade sand paper and made smooth. A coat of distemper shall be applied over the patches.The surface
shall be allowed to dry thoroughly before the regular coat of distemper is allowed. The surface affected by
moulds, moss, fungi algae lichens, efflorescence etc. shall be treated inaccordance with I. S. 2395 (Part-I)
1966. Before applying distempering, any unevenness shall be made good by applying putty made of
plaster of paris mixed with water on entire surface including filling up the undulation and then sand
papering the same after it is dry.
2.3 Priming coat :
2.3.1 A priming coat or distemper prime of approved manufacture and shade shall be applied over the
papered surface in case of new work on undecorated surface. If the distemper priming is done after the
wall surface dries completely, the distemper primer shall be applied.
2.3.2 Application of Primer shall be done as under :
The primer shall be applied with a brush on the clean dry and smooth surface. Horizontal strokes shall be
given first and vertical strokes shall be applied immediately afterwards. This entire operation will
constitute one coat. The surface shall be finished as uniformly as possible leavin no brush marks. It shall
be allowed to dry for atleast 48 hours before oil bound distemper or Paint is applied.
2.3.3 Oil bound distemper is not recommended to be applied within six months of the completion of wall
2.4 Preparation of oil bound distemper :
2.4.1 The distemper shall be diluted with water or any other prescribed thinner in a manner recommended
by the manner recommended by the manufacture only. Sufficient quantity of distemper required for a
day's work shall be prepared.
2.5 Application of Distemper coat :
2.5.1 For undecorated surfaces, after the primer coat is dried for atleast 48 hours, the surface shall be
lightly sand papered to make it smooth for receiving the distemper, taking care not to rub out the priming
coat. All loose particles shall be dusted off after rubbing. Minimum two coats of distemper shall be applied
with brushes in horizontal strokes followed immediately by vertical strokes which together shall constitute
one coat. The subsequent coats shall be applied after a time interval of atleast 24 hours between
consecutive coats to permit proper drying of the preceding coat. The finished surface shall be even and
uniform without patches, brush marks, distemper drops etc.
2.5.2 sufficient quantity of distemper shall be mixed to finish one room at a time. The application of a coat
in each room shall be finished in one operation and no work shall be started in any room which cannot be
completed on the same day.
2.5.3 15 cm. double bristled distemper brush shall be used. After day's work brushes shall be thoroughly
washed in hot water soap solution and hung down to dry. Old brushes which are dirty and cakedwith
distemper shall not be used on the work.
2.6 Protective measurements : The surfaces of doors, windows, floors, articles of furniture etc. and
such other parts of the buildings as are not to be distempered shall be protected from being
splashed upon. Such surfaces shall be cleaned of distemper splashes if any.
3.0 Mode of measurements & payment :
3.1 Priming coat of distemper primer, scraping of surface spoiled by stunk soots removal of oil and
grease spots, treatment for infection of effloresces mould moss, fungi, algae and litchen and patch
repairs to plaster shall be included in this item for which nothing extra shall be paid.
3.2 All the work shall be measured net in the decimal system as in place subject tot he following limits
unless otherwise stated hereinafter :
(a) Dimensions shall be measured to the nearest 0.01 m.
(b) Area in individual items shall be worked out to the nearest 0.01 sq. m. all work shall be measured in
sq. metre. No deductions shall be made for ends of joints, beams, posts etc., and openings, not
exceeding 0.5 sq.m. each and no addition shall be made for reveals, jambs, soffits, sills etc. of
these openings nor for finish around ends of joints, beams, posts etc.
3.3 Deductions of opening exceeding 0.5 sq.m. but not exceeding 3 m. in each shall be made as
follows and net addition shall be made for reveals, jambs, soffits etc. of these openings :
(a) When both the faces of walls are provided with same finish : deductions shall be made or one face
(b) When each face of wall is provided with different finish, deduction shall be made for that side of
frame for doors, windows etc. on which width of reveal is less than that of the other side but no
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
deduction shall be made on the other side. Where the width of reveals on the both the faces of wall
are equal, deduction of 50% of area of opening of each face shall be made from area of finish.
(c) When only one face of wall is treated and the other face is not treated, full deduction shall be made
if the width of the reveal on treated side is less than that on untreated sides but if the width of the
reveal is equal or more than that on untreated side neither deductions not addition to be made for
reveals, jambs, soffits, sills etc.
3.4 In case opening of area exceeding 3 sq. m. each, deduction shall be made for openings but jambs,
sills and soffits shall be measured.
3.5 No deductions shall be made for attachments such as casings, conduits, pipes, electric wiring and
3.6 Item includes removing nails, making good holes, cracks, patches with material similar in
composition of distemper.
3.7 The rate includes cost of all materials, labour, scaffolding, protective measures etc. involved in all
the operations described above. This shall also include conveyance, delivery, handling, unloading,
storing work etc.
3.8 The rate shall be for a unit of one sq. metre.
Extra over item 57 for every subsequent coat of wall painting with plastic emulsion paint of
approved brand. (Bldg.s.o.r.2015-2016,it. No.18.59 Ch- 18)
The rate shall be for a unit of one sq. metre.
Extra over item 57 for painting with plastic emulsion paint of approved brand on
ceiling sand sloping roofs. (Bldg.s.o.r.2015-2016,it. No.18.6 Ch- 18)The rate shall be for a
unit of one sq. metre.
Painting two coats (excl. priming coat) on new steel & other Metal surfacer with enamel paint,
brushing, interior to give an even shade incl. cleaning the surface of all dirt, dust and other
foreign matter..( Building SOR - 2015-16 Ch-19, Item No.19.7Page no.211)
rate shall be for a unit of one sq. metre.
Scraping oil paint from steel and other metal surface and making the surface even
(with Hand Scraping.) (Building SOR - 2015-16 Ch-20, Item No.20017)
rate shall be for a unit of one sq. metre.
Painting Two Coats (Excl. Priming Coat) On Peviously Painted Steel & Other MetalSurfacer With
Enamel Paint, Brushing, Interior To Give An Even Shade Incl. Cleaning TheSurface Of All Dirt,
Dust And Other Foreign Matter.( Building SOR - 2015-16Ch-19, Item No.19.11+19.15, Page no.211)
Materials : Water shall be conform to M-1. The plastic emulsion shall conform to I.S. 5411-1969 (part-I)
1.0 Workmanship :
1.1 Scaffolding : The relevant specifications of item No. 18.11 para 2.1. shall be followed.
1.2 Preparation of Surface : The relevant specifications of item No. 18.44 para 2.2 shall be followed.
1.3 Preparation of Mix : This shall be done as per manufacturers instructions. The thinning of emulsion
is to be done with water and not with turpentine. The quantity of thinner to be added shall be as per
manufacturer instructions.
1.4 Applications :
1.4.1 Before pouring into small containers for use, the paint shall be stirred thoroughly in its container.
When applying also, the paint shall be continuously stirred in the smaller container, so that its
consistency is kept uniform.
1.4.2 The paint shall be laid on evenly and smoothly by meant of crossing and laying off the crossing and
laying off consist of covering the area over with paint, brushing the surface hard for the first time
over and then brushing alternately in opposite direction two or three times and then finally brushing
lightly in a direction at right angles to the same. In this process, no brush marks shall be left after
the laying off is finished. No hair marks from the brush or clogging of paint puddles in the corners of
panels, angles of mouldings, etc. shall be left on the work. The full process of crossing and laying
off will constitute one coat.
1.4.3 The paint shall be applied with brush or rollers. For undecorated surfaces, the surface shall be
treated with minimum two coats of cement water proofing paint. The second or subsequent coat
shall not be started until the preceding coat has become sufficiently hard to resist marking by brush
1.4.4 The surface on finishing shall present a flat velvety smooth finish. It shall be even and uniform in
shade without patches, brush marks, paint drops etc.
1.5 Precautions :
(a) Old brushes if they are to be used with emulsion paints, shall be completely dried of turpentine oil
paint by washing in warm soap water.
Brushes shall be quickly washed in water immediately after use and kept immersed in water during
break periods to prevent the paint from hardening on the brush.
(b) In the preparation of wall for plastic emulsion painting, no oil base putties shall be used in filling
cracks, holes etc.
(c) Splashes on floors etc. shall be cleaned out without delay as they will be difficult to remove after
(d) Washing of surfaces treated with emulsion paint shall not be done within 3 to 4 weeks of
2.6 Protective measures :
2.1.1 The relevant specifications of item No. 18.17 para 2.3 shall be followed.
2.0 Mode of measurements & payment :
2.1 The relevant specifications of item No. 18.11 shall be followed.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
2.2 The rate shall be for a unit of one sq. metre.
Extra overitem 5 and 6 for every sub sequent coat of paint.
rate shall be for a unit of one sq. metre
Painting two coat (excluding priming coat) on new wood and wood based surfaces with enamel
paint to give even shade including cleaning of all dirt, dust and other foreign matter. (Building
SOR - 2015-16 Ch-19, Item No.19.71, Page no.213)
1.0 Materials :
2.0 The enamel paint shall conform to M-44 B.
3.0 Workmanship :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
3.1.1 The materials required for work of painting work shall be obtained directly from approved
manufacturers or approved dealer and brought to the site in maker's drums, kege etc. with seal
3.1.2 All materials not in actual use shall be kept properly protected, lids of containers shall be kept
closed and surface of paint in open or partially open containers covered with a thin layer of turpentine to
prevent formation of skin. The materials which have become stale or flat due to improper and long
storage shall not be used. The paint shall be stirred thoroughly in its container before pouring into small
containers. While applying also the paint shall be continuously stirred in smaller container. No left over
paint shall be put back into stock tins. When not in use, the containers shall be kept properly closed.
3.1.3 If for any seasons, thinning is necessary, the brand of thinner recommended by the manufacturer
3.1.4 The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be
thoroughly removed before painting is started. No painting on exterior or other exposed parts of the
work shall be carried out in wet, damp of otherwise unfavourable weather and all the surfaces shall
be thoroughly dry before painting work is started.
2.2 Application :
1.1.1 Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of
particular paint. The paint shall be applied evenly and smoothly by means of crossing and laying off. The
crossing and laying off consists of covering the area over with paint, brushing the surface hard for the first
time over and then brushing alternately in opposite directions two or three times and then finally brushing
lightly in direction at right angles to the same. In this process, no brush marks shall be left after the laying
off is finished. The full process of crossing and laying off will
constitute one coat.
1.1.2 Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper
and loose particles brushed off before next coat is applied. Each coat shall vary slightly in shade and shall
be got approved from Engineer-in-charge before next coat is started.
1.1.3 Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone
and cleaned of dust before the next coat is applied. No hair marks from the brush or clogging of paint
puddles in the corners of panels angles of mouldings etc. shall be left on the work.
1.1.4 special care shall be taken while painting over bolts, nuts, rivets, overlaps etc. Approved best
quality brushes shall be used.
2.0 Mode of measurements & payment :
2.1 The relevant specifications of item No. 19.12 shall be followed for mode of measurements and
payment. The rate is excluding priming coat.
2.2 The rate shall be for a unit of one sq. metre.
Painting one coat (excluding priming coat) on previously painted wood and wood based surfaces
with enamel paint to give even shade including cleaning of all dirt, dust and other foreign matter.
(Building SOR - 2015-16 Ch-19, Item No.19.71, Page no.213)
rate shall be for a unit of one sq. metre
Extra overitem 8 and 9 for every sub sequent coat of paint.
rate shall be for a unit of one sq. metre
Finishing wall with water proofing cement paint on wall surfaces (two coats) to givean approved
brand and manufacturer & required shape even shade after thoroughlybrushing the surface to
remove all dirt & remains of loose powdered materials. ( BuildingSOR - 2012-13 Ch-18, Item
No.18.51 Page no.200)
1.0 Materials :
1.1 The water shall conform to M-1. Cement water proofing shall conform to I.S. 5410-1969.
2.0 Workmanship :
2.2 Scaffolding : The relevant specifications of item No. 18.11 shall be followed.
2.3 Preparation of surface : The relevant specifications of item No. 18.11 shall be followed except that
the word white wash colour wash shall be substituted with water proofing cement paint. The surface
shall be thoroughly wetted with clean water before cement water proofing paint is applied.
2.4 Preparation of paint : Portland cement shall be prepared by adding paint powder to water and
stirring to obtain a thick paste, which shall then be diluted to a brushable consistency. Generally,
equal volumes of paint powder and water make a satisfactory paint. In all cases, the manufacture's
instructions shall be followed. The paint shall be mixed in such quantities as can used up within an
hour of mixing as otherwise the mixture will set and thickness, affecting flowing and finish. The libs
of cement paint drums shall be kept tightly when not in use.
2.5 Application of Paint :
2.5.1 No painting shall be done when the paint is likely to be exposed to a temperature of below 7°C
within 48 hours after application.
2.5.2 When weather conditions are such as to cause damage the work shall be carried out "in the
shadow" as far as possible. This helps the proper hardening of the paint film by keeping the surface
moist for a longer period.
2.5.3 To maintain the uniform mixture and to prevent segregation, the paint shall be stirred frequently in
2.5.4 For undercoated surfaces, the surfaces shall be treated with minimum two coats of water proof
cement paint. Not less than 24 hours shall be allowed between two coats. Next coat shall not be
started until the preceding coat has become sufficiently hard to resist marking by the brush being
used. In hot dry weather, the preceding coat shall be allowed between two coats. Next coat shall
not be started until the preceding coat has become sufficiently hard to resist marking by the brush
being used. In hot dry weather, the preceding coat shall be slightly moistened before applying the
subsequent coat.
2.5.5 The finished surface shall be even and uniform in shade, without patches, brush masks, paint drops
2.5.6 The cement paint shall be applied with a brush with relatively short stiff hog or fibre bristles. The
paint shall be brushed in uniform thickness and shall be free from excessive heavy brush marks.
The lamps shall be well brushed out.
2.5.7 Water proof cement paint shall not be applied on surfaces already treated with white wash colour
wash, distemper dry or oil bound varnishes, paint etc. It shall not be applied on gypsum, wood and
metal surfaces.
2.6 Curing : Painted surfaces shall be sprinkled with water two or three times a day. This shall be done
between coats and for atleast two days following the final coat. The curing shall be started as soon
as the paint has hardened so as not to be damaged by the sprinkling of water say about 12 hours
after the application.
2.7 Protection measures shall be taken as per item No. 18.11 para 2.6.
3.0 Mode of measurements & payments :
3.1 The relevant specifications of item No. 18.11 shall be followed.
3.2 The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand & manufacture (two coats) and ofrequired
shade on wall surfaces to give an even shade over & including priming coat ofwhiting after
thoroughly brooming the surface free from mortar dropping & other foreignmatter. ( Building SOR
- 2015-16 Ch-18, Item No.18.38 Page no.207)
Distempering (two coats) with oil bound distemper of approved brand & manufactureand of
required shade on wall surfaces to give an even shade over & including primingcoat with
distemper primer of approved brand after thoroughly brushing the surface freefrom mortar
dropping & other foreign matter and also preparing the surface even andsmooth..( Building SOR -
2012-13 Ch-18, Item No.18.44, Page no.207)
4.0 Materials :-
1.1 Oil bound washable distemper and primer shall be of approved brand and manufacture. The
distemper shall be of required colour and shade and the same shall conform to I.S. 428-1969.
5.0 Workmanship :
5.1 Scaffolding : Where scaffolding is required, it shall be erected in such a way that as far as possible
no part of scaffolding shall rest against the surface to be distempered. A properly secured strong
and well tied suspended platform (Jools) may be used for distempering. Where ladders are used,
pieces of old gunny bags shall be tied at top and bottom to prevent scratches to the walls and
floors. For distempering to ceiling, proper stage scaffolding shall be erected where necessary.
5.2 Preparation of surface :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
5.2.1 The undecorated surface to be distempered shall be thoroughly brushed off from dust, dirt, grease,
mortar dropping and other foreign matter and sand papered smooth. New plaster surface shall be
allowed to dry for atleast 2 months before applications of distemper.
5.2.2 All unnecessary nails shall be removed. pitting in plaster shall be made good with plaster of paris
mixed with dry distemper of colour to be used. The surface shall then be rubbed down again with a
fine grade sand paper and made smooth. A coat of distemper shall be applied over the patches.
The surface shall be allowed to dry thoroughly before the regular coat of distemper is allowed. The
surface affected by moulds, moss, fungi algae lichens, efflorescence etc. shall be treated in
accordance with I. S. 2395 (Part-I) 1966. Before applying distempering, any unevenness shall be
made good by applying putty made of plaster of paris mixed with water on entire surface including
filling up the undulation and then sand papering the same after it is dry.
5.3 Priming coat :
5.3.1 A priming coat or distemper prime of approved manufacture and shade shall be applied over the
papered surface in case of new work on undecorated surface. If the distemper priming is done after
the wall surface dries completely, the distemper primer shall be applied.
5.3.2 Application of Primer shall be done as under :
The primer shall be applied with a brush on the clean dry and smooth surface. Horizontal strokes
shall be given first and vertical strokes shall be applied immediately afterwards. This entire
operation will constitute one coat. The surface shall be finished as uniformly as possible leaving no
brush marks. It shall be allowed to dry for atleast 48 hours before oil bound distemper or Paint is
5.3.3 Oil bound distemper is not recommended to be applied within six months of the completion of wall
5.4 Preparation of oil bound distemper :
2.4.1 The distemper shall be diluted with water or any other prescribed thinner in a manner
recommended by the manner recommended by the manufacture only. Sufficient quantity of
distemper required for a day's work shall be prepared.
2.5 Application of Distemper coat :
2.6.1 For undecorated surfaces, after the primer coat is dried for atleast 48 hours, the surface shall be
lightly sand papered to make it smooth for receiving the distemper, taking care not to rub out the
priming coat. All loose particles shall be dusted off after rubbing. Minimum two coats of distemper
shall be applied with brushes in horizontal strokes followed immediately by vertical strokes which
together shall constitute one coat. The subsequent coats shall be applied after a time interval of
atleast 24 hours between consecutive coats to permit proper drying of the preceding coat. The
finished surface shall be even and uniform without patches, brush marks, distemper drops etc.
2.6.2 sufficient quantity of distemper shall be mixed to finish one room at a time. The application of a coat
in each room shall be finished in one operation and no work shall be started in any room which
cannot be completed on the same day.
2.6.3 15 cm. double bristled distemper brush shall be used. After day's work brushes shall be thoroughly
washed in hot water soap solution and hung down to dry. Old brushes which are dirty and caked
with distemper shall not be used on the work.
2.7 Protective measurements : The surfaces of doors, windows, floors, articles of furniture etc. and
such other parts of the buildings as are not to be distempered shall be protected from being
splashed upon. Such surfaces shall be cleaned of distemper splashes if any.
6.0 Mode of measurements & payment :
6.1 Priming coat of distemper primer, scraping of surface spoiled by stunk soots removal of oil and
grease spots, treatment for infection of effloresces mould moss, fungi, algae and litchen and patch
repairs to plaster shall be included in this item for which nothing extra shall be paid.
6.2 All the work shall be measured net in the decimal system as in place subject tot he following limits
unless otherwise stated hereinafter :
(c) Dimensions shall be measured to the nearest 0.01 m.
(d) Area in individual items shall be worked out to the nearest 0.01 sq. m. all work shall be measured in
sq. metre. No deductions shall be made for ends of joints, beams, posts etc., and openings, not
exceeding 0.5 sq.m. each and no addition shall be made for reveals, jambs, soffits, sills etc. of
these openings nor for finish around ends of joints, beams, posts etc.
6.3 Deductions of opening exceeding 0.5 sq.m. but not exceeding 3 m. in each shall be made as
follows and net addition shall be made for reveals, jambs, soffits etc. of these openings :
(d) When both the faces of walls are provided with same finish : deductions shall be made or one face
(e) When each face of wall is provided with different finish, deduction shall be made for that side of
frame for doors, windows etc. on which width of reveal is less than that of the other side but no
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
deduction shall be made on the other side. Where the width of reveals on the both the faces of wall
are equal, deduction of 50% of area of opening of each face shall be made from area of finish.
(f) When only one face of wall is treated and the other face is not treated, full deduction shall be made
if the width of the reveal on treated side is less than that on untreated sides but if the width of the
reveal is equal or more than that on untreated side neither deductions not addition to be made for
reveals, jambs, soffits, sills etc.
6.4 In case opening of area exceeding 3 sq. m. each, deduction shall be made for openings but jambs,
sills and soffits shall be measured.
6.5 No deductions shall be made for attachments such as casings, conduits, pipes, electric wiring and
6.6 Item includes removing nails, making good holes, cracks, patches with material similar in
composition of distemper.
6.7 The rate includes cost of all materials, labour, scaffolding, protective measures etc. involved in all
the operations described above. This shall also include conveyance, delivery, handling, unloading,
storing work etc.
6.8 The rate shall be for a unit of one sq. metre.
Extra over Item 44 to 46 for every sub sequent coat of approved brand and manufacture.(Building
SOR - 2015-16 Ch-18, Item No.18.47, Page no.209)
rate shall be for a unit of one sq. metre
Extra over Item 44,45 for distempering with oil bound washable distemper on celling and sloping
roofs. (Building SOR - 2015-16 Ch-18, Item No.18.48, Page no.209)
rate shall be for a unit of one sq. metre
Removing dry or oil bound distemper by ashing and scrapping and sand paperingthewall surface
smooth including necessary repairs to scratches complete..( BuildingSOR - 2012-13 Ch-18, Item
No.18.33, Page no.196)
Materials & Workmanship :
1.1 All loose pieces and scales shall be removed by sand papering and surface shall be cleared of all
greasy, dust, dirt, etc. on decorated wall surface. Where heavy scaling has taken place, the entire
surface shall be scrapped by means of steel scrappers so as to remove all accumulated distemper,
leaving clean surfaces. Necessary repairs to the scratches shall be made as directed.
1.0 Mode of measurements & payment :
1.1 The relevant specifications of item No. 18.11 shall be followed.
1.2 The rate shall be for a unit of one sq. metre.
Extra over item 13 for removing dry oil bound distemper on ceilings and sloping roofs.
As Per Item & instructed by Engineer-in-charge.
The rate shall be for a unit of one sq. metre.
Providing Scaffolding for Demolation , Plaster work & painting work by "H" Frame Stand of by any
means like bamboo, valli etc. inluding carting material work site and removing after compltion of
work. Rate include any type rent etccomplet for any height as directerd by engg. incharge.I00899
As Per Item & instructed by Engineer-in-charge.
The rate shall be for a unit of one sq. metre.
Arrangement of zula with two or nece. skilled labour for repairing & maintenance work out side
building work etc.complete as per insructerincharge(At any floor level) (App Rate))
As Per Item & instructed by Engineer-in-charge.
The rate shall be for a unit of one number basis.
Applying two coats of Birla or Asian acrylic lapy (putty) & two coats of primer of approved brand
and manufacture on new wall surface to give an even shade including thoroughly brushing the
surface free from mortar dropping and other foreign matter and sand papered smooth..( Building
SOR - 2015-16 Ch-18, Item No.18.62, Page no.217)
1.1 The ready mixed primer, brushing red lead shall conform to I. S. 102-1962.
1.2 The thinner (linseed oil) shall conform to I.S. 75-1973. If for any reason, thinning is necessary in
case of ready mix paint, the brand of thinner recommended by manufacturer shall be used.
2.0 Workmanship :
2.1 Preparation of surfaces : The surfaces to be painted shall be cleaned of all rust, scale, dirt and
other foreign matter sticking to it with wire brushes, steel wool, scrapers, sand paper etc. This
surface shall then be wiped finally with mineral turpentine which shall also removed grease and
perspiration of hand marks. The surface shall then be allowed to dry.
2.2 Application of primer :
2.2.1 After the preparation of the surface, the priming coat shall be applied immediately. The brushing
operations are to be adjusted to the spreading capacity advised by the manufacturer of the
particular primer. The paint shall be applied evenly and smoothly by means of crossing and laying
off. The crossing and laying off consists of covering the area over with paint, brushing alternately in
opposite directions, two or three times and then finally brushing lightly in a direction at right angles
to the same. In this process, no brush marks shall be left after the laying off is finished. The full
process of crossing and laying off will constitute one coat.
2.2.2 During painting, every time after the priming coat has been worked out of the brush bristles or after
the brush has been unloaded of the bristles of the brush shall be opened up by striking the brush
against portion of the unpainted surface with the end of the bristles, held at right angles to the
surface, so that bristles thereafter will collect the correct amount of paint when dipped again into a
paint container. The primary coat shall be allowed to dry completely before painting is started.
2.2.3 No hair marks from the brush or clogging at paint puddles in the corner or panels angles of
mouldings etc. shall be left on the work.
2.2.4 Special care shall be taken while painting over bolts, nuts, rivets overlaps etc.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
2.2.5 The container when not in use shall be kept close and free from air so that paint does not thickness
and also shall be kept guarded from dust.
3.0 Mode of measurements & payment :
3.1 The new steel and other metal surface shall be measured under this item.
3.2 All the work shall be measured not in the decimal system as executed subject to the following limits
unless otherwise stated hereinafter :
(a) dimensions shall be measured to the nearest 0.01 metre.
(b) Areas shall be worked out to the nearest 0.01 Sq. metre.
3.3 No deductions shall be made for openings not exceeding 0.5 sq. mt. each and no addition shall be
made for painting to beadings, mouldings, edges, jambs, soffits, etc. of such opening.
3.4 In case of fabricated structural steel and iron work, priming coat of paint shall be included with
fabrication. In case of trusses if measured in sq. m. compound girders, stanchions, Lattices, girder
and similar work, actual area shall be measured in sq. M. and no extra shall be paid for painting on
bolts, heads, nuts, washers etc. No addition shall be made to the weight calculated for the purpose
of measurements of steel and iron works for paint applied on shop or at site.
3.5 The different surfaces shall be grouped into one general item, areas of uneven surface being
converted into equivalent plain areas in accordance with the table given as per Annexure II for
3.6 The rate shall be for a unit of one sq. metre.
(1) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors,
(2) Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into
masonry and pipes etc. for concealed wiring.
(3) Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to
make splaying of jambs, throating and making Arches over the aperture be paid for
The rate shall be for a unit of one cubic meter.
Providing and applying texture paint at approved quality, colour scheme, including preparation of
surface, primer 2 coats+2 coats of putty and texture paint, as per manufacture's specification,
scaffolding, roller finish etc complete as per instruction of engineer in charge (As per RA)
As Per Item & instructed by Engineer-in-charge.
The rate shall be for a unit of one sq. metre.
.Item NO -25 Applying priming coat over old kerb surface after and including,preparing the
surface with ready mixed priming paint brushing red lead
.Item NO -26 Painting Two Coats on divider and footpath curb surface / New Concrete Surface (
Painting two coats after filling the surface with synthetic enamel paint in all shades on new
plastered concrete surfaces)
Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of items
which are not mentioned in BOQ Item, Specifications should be considered as per AMC Sor Current Approved
Rates for Civil and Electrical Works, as per Available on Site of Ahmedabadcity.gov.in All the Specifications
should be Considered as per Schedules Rates of R & B Division of both civil and Electrical Works. Hence it an
ARC Tender All the Quantity Would Vary as per Instruction of Engineer in Charge. No Rate would be given
Extra for Increase or Decrease in the Quantity of The BOQ Scheduled Items.
CONTRACTOR'S SIGNATURE & STAMP Addl.City Engineer
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No 360.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].