Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC CHITTATHARA HOUSE MANAKKAPPADY KARUMALLOOR P O | ₹4.5 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹4.5 LRejected-AOC | ₹4.5 L | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹4.8 LRejected-AOC | ₹4.8 L | L3 | Rejected-AOC Third Lowest |
| 4 | L4₹4.9 LRejected-AOC | ₹4.9 L | L4 | Rejected-AOC Fourth Lowest |
Tender Value
₹5.1 L
EMD Value
₹12,800
Closing Date
26 Jun 2026, 1:00 pmClosed
The Executive Engineer TDB,Kottayam
Office of the Executive Engineer, TDB, Kottayam- 686001
Aluva Mahadevar devaswom-Paravur group--Concreting the pathway infront of foot over bridge to prevent the water stagnation, clay and silt during the time of Karkkidakavavu and sivarathry.
2026_TDB_857224_1
TDB/EEK/ET-21/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Aluva
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,239
₹12,800
20 Jul 2026
23 Jun 2026
27 Jun 2026
23 Jun 2026
26 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1concreting | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 40.6 | M3 | 257.63 | ₹10,459.78 |
| 1.02 | DR PACKING Under foundation - Dry stone packing under foundation with good
quality blasted rubble including conveyance of material and labour charges etc.
complete as per direction of departmental officers at site. | 34.8 | M3 | 2,967.19 | ₹1,03,258.21 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | - | M3 | 7,932.89 | - |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 17.3 | M3 | 9,963.93 | ₹1,72,375.99 |
| 1.05 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 865 | Kg | 112.43 | ₹97,251.95 |
| 1.06 | Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | 5.8 | M2 | 386.16 | ₹2,239.73 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
1preagmntformat.pdf
Tender Documents • 0.50 MB
BOQ_1449029.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].