Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.9 L
EMD Value
₹35,000
Closing Date
19 Nov 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE NH Divn Kalaburagi
EE NH Divn Kalaburagi
M R to NH-161A from KM 4.500 to 6.300
2020_MoRTH_596914_1
EE/NHD/KLB/161A/2020-21/909
Open Tender
Civil Works
Works
30 days
Aurad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
RPAO
₹35,000
20 Nov 2020
13 Nov 2020
20 Nov 2020
13 Nov 2020
19 Nov 2020
13 Nov 2020
90 days
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shurbs, saplings and trees upto girth 300mm, removal of stumps of trees cut earlier and disposal of unservicable materials and stacking of servicable materials to be used or auctioned, with lead, including removal and disposal of top organic soil not exceeding 150mm in thickness including all labour, hire charges of all machineries. By mechanical means in area of light jungle etc., Complete. As directed by Engineer incharge of the work.
Wet Mix Macadam Plant Mix Method Construction of Wet Mix Macadum by providing laying, spreading and compacting of graded stone aggregates as per Table 400-12&13, mixing in a Wet mix plant of 75 tonne capacity at OMC, carriage of mixed material to work site in tipper to paver, laid over a previously prepared surface with Mechanical paver finisher to the required grade, level and alignment, compacting with vibratory roller 8-10 tonne to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, hire charges of machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading, all lead and lift etc., complete with all lead of mixed material (Compacted Thickness) etc., Complete. As directed by Engineer incharge of the work.
Prime Coat Providing and applying primer coat with slow setting bitumen emulsion (SS-I) emulsion complying with IS: 8887 of approved quality and make on prepared surface of granular Base such as WBM, WMM including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying using Bitumen Pressure Distributor, uniformly at the rate as per Table 500-1, including cost of all materials, labour, hire charges of machinery, loading, unloading etc., complete, including lead for emulsion. On WMM/WBM surface @ 0.80Kg/sqm etc., complete. As directed by Engineer incharge of the work.
Tack Coat Providing and applying Tack coat as per table 500-5 on a prepared surface using rapid setting bituminous(RS-1) emulsion complying with IS 8887 of approved quality and make including cleaning of road surface by mechanical broom & dusting by Air compressior, and spraying by bitumen pressure distributor, including cost of all material, labour, hire charges of machinery, loading and unloading stacking, etc complete, including lead for emulsion II) Using Bitumen 80/100 Grade (VG-10) B)On Granular surface treated with primer at 2.5Kg/10 Sqm etc., complete As directed by Engineer incharge of the work.
Tack Coat Providing and applying Tack coat as per table 500-5 on a prepared surface using rapid setting bituminous(RS-1) emulsion complying with IS 8887 of approved quality and make including cleaning of road surface by mechanical broom & dusting by Air compressior, and spraying by bitumen pressure distributor, including cost of all material, labour, hire charges of machinery, loading and unloading stacking, etc complete, including lead for emulsion II) Using Bitumen 80/100 Grade (VG-10) B)On Bituminus surface treated with primer at 2.0Kg/10 Sqm etc., complete. As directed by Engineer incharge of the work.
Dense Bituminous Macadam Providing and laying Dense Graded Bituminous Macadam using crushed aggregates as per table 500-8,9,10 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates, premixed with bituminous binder 60/70 Grade (VG-30) in Batch/ Hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Paver Finisher to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labours, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting etc complete, including lead for Bitumen, with a lead of mixed material, excluding cost of primer/tack coat. (Compacted thickness) Using 40-60 TPH Hot mix plant and Mechanical Paver Finisher Grading 2 :50-75 mm compacted thickness(26.50 mm nominal size) @ 4.50% Bitumen using Bitumen 60/70 Grade (VG-30 ) etc., complete. As directed by Engineer incharge of the work.
Bituminous Concrete: Providing and laying Bituminous Concrete using crushed stone aggregates as per table 500-16, 17 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates premixed with bituminous binder in Batch/ Hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Hydraustatic Paver Finisher with sensor control to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting etc complete, including lead for Bitumen & cement with a lead of mixed material, excluding cost of primer/tack coat. (Compacted thickness) Using 40-60 TPH Hot mix plant with Mechanical Paver Finisher Grading 2 with 5.40% Bitumen (30 - 40 mm compacted thickness)(13.20 mm nominal size) Using 60/70 Grade (VG-30 Bitumen etc., complete. As directed by Engineer incharge of the work.
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil upto 150mm excavated by excavator, carriage by tipper and compacting it with plate compactor to the desired field density including cost of all materials, labour, hire charges of machinery, loading, unloading, lead & lift etc., complete. As directed by Engineer incharge of the work.
Surface Drains in Soil:- Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of Clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres inculding all lead, lifts, all labour, hire charges of all machineries. (A) Mechanical means using Hydraulic excavator etc complete., As directed by Engineer incharge of the work.
Removal of unserviceable soil with hydraulic excavator 0.9 cum bucket capacity including excavation, loading in tippers, unloading, all lifts, disposal upto 1000 metres including all labour, hire charges of all machineries. As directed by Engineer incharge of the work.
SHIVANAND MANGALGI
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .