Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance CHAKOR 1 3 HOUSE FIN C H S KALASH UDYAN KOPARKHAIRNE NAVI MUMBAI THANE MAHARASHTRA 400709 | THANE | MAHARASHTRA | 400709 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Jan 2021, 10:00 amClosed
PARAU MURMU
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Annual Shutdown based Mechanical Maintenance jobs of conveyors in bagging Material handling plant in RCF Trombay Unit.
2020_RCFL_604429_1
ET - MES/238/L/2021/283
Open Tender
Miscellaneous Services
Item Rate
365 days
MES DEPT ROOM NO 25 ADMIN
AS PER NIT
10 documents required · 10 mandatory
₹0
Exempted
27 Jan 2021
19 Dec 2020
2 Jan 2021
19 Dec 2020
2 Jan 2021
19 Dec 2020
Amount
1-Replacement of pulley’s with bearings -
1.a-Head Pulley (ET-1 to ET-13 conveyors) (dia 16” to 24”)
1.b-Tail /Take up pulley (ET-1 to ET-13 conveyors)(dia 12” to 20”)
1.c-Bend / Snub pulley (ET-1 to ET-13 conveyors) (dia 12” to 20”)
2-Replacement of Gear Box -
2.a-Gear Box Size - 6" to 8"
2.b-Gear Box Size – 10” -14”
3-Replacement of bearings & re-positioning of pulley
3.a-Replacement of bearings for conveyor pulley with Plummer block (one side only)
3.b-Replacement of bearings for conveyor head pulley with Plummer block (gear box side)
3.c-Repositioning of conveyor belt pulley along with bearing
4-Replacement of Oil seals of gear box
4.a-Replacement of oil seal of G/B - non drive end
4.b-Replacement of oil seal of G/B - drive end by removing coupling and realignment with dial gauge.
5-Replacement of Skirt rubber/ Skirt Board/ Scrapers of Conveyor belt.
5.a-Replacement of skirt rubber/Scraper rubber of conveyor belt
5.b-Replacement of Skirt Rubber board of conveyor belt
5.c-Replacement /Repair of belt scrapers [primary / secondary] of conveyor belts.
6-Replacement of Frames and rollers of Conveyor belt
6.a-Replacement of Troughing rollers (conveyor width 500-1000 mm)
6.b-Replacement of return rollers(conveyor width 500-1000 mm)
6.c-Replacement of guide rollers(conveyor width 500-1000 mm)
6.d-Replacement of troughing roller frame along with rollers
6.e-Replacement of return roller bracket (2 No) / Frames along with rollers
7-Crack welding after edge preparation and grinding in running feet
7.a-Repair of chute / Diverter of bulk material and Equipment’s
7.b-Equipment related structure
AL AAQIB ENGINEERING WORKS
S.R. CONSTRUCTION CO.
Mepico Fabricators
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .