Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.6 L+₹4.3 L (191.4%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
11 May 2021, 4:00 pmClosed
DGM - PRODUCTION AND TECHNICAL SERVICES
MFL MANALI CHENNAI
Laying of Roof Tiles Construction of Kerb wall at entrance and Eastern Side wall painting at New Fire Station at MFL including material supply
2021_MFL_626392_1
ESER/ENGG/NEW FIRE STATION/110521/003 DT 12.04.21
Open Tender
Miscellaneous Services
Works
30 days
MFL, MANALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
28 Oct 2021
12 Apr 2021
12 May 2021
12 Apr 2021
11 May 2021
12 Apr 2021
Prepare any surface by scrapping, sanding, cleaning (or) other means and apply Cement paint of any colour including scaffolding. East Side outer wall: 35.10 X 4 = 140.4 M2 140.4 X 2 coat = 280.8 M2 East side Fire Station Rest Room : North Side : 7.40 X 4.20 = 31.08 East Side : 7.40 X 4.20 = 31.08 South Side : 8.00 X 4.20 = 33.6 31.08 + 31.08 + 33.6 = 95.76 95.76 X 2 Coat = 191.52 M2 Total : 280.8 + 191.52 = 472.32 M2
Supplying and Laying Brick work half brick work in CM 1:4 including curing : KERB Wall : 10.00 X 0.61= 6.1 M2 6.1 X 2 Nos = 12.2 M2
Plastering in 1:4 Cement mortar, 20 mm thick, including curing and cleaning the areas: Below 10 mtrs: 10.00 X 0.61 X 4 sides= 24.4 M2 Face Plastering : 10.00 X 0.11 X 2 Nos = 2.2 M2 Total = 24.4 + 2.2 = 26.6 m2
Prepare any surface by scrapping, sanding, cleaning (or) other means and apply Wall Kerbs : 10.00 X 0.61 X 4 Sides = 24.4 M2 Kerb Wall face Enamel painting 10.00 X 0.11 X 2 nos = 2.2 M2 Total : 24.4 + 2.2 = 26.6 M2 26.6 x 2 coats = 53.2 M2
Chipping the Surface of concrete of brick work upto a maximum depth not exceeding 75 mm. Roof Chipping at Fire Station : 19.00 X 7.00 = 133 M2
Supply and using water proofing compound. Water proofing for tiles laying 19.00 X 7.00 = 133 M2
Providing and fixing 1st quality roof tiles over 12 mm thick of cement mortar 1:3, including pointing in mixed white cement. Tiles laying for roof: 19.00 X 7.00 = 133 M2 Skirting tiles : 1) 19.00 X 0.15 X 2 sides = 5.7 M2 ii) 7.00 X 0.15 X 2 sides = 2.1 M2 Total: 133 + 5.7 + 2.1 = 140.8 M2
KBS ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .