Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
3 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Panchayat R&B Division Bharuch
Construction of Box Turf For Multiple Sports at EMRS School Vagalkhod Tal.Valia . Dist. Bharuch
313987
4/2026-27 (2nd Attempt)
Open
Civil - All
Bharuch
5 documents required · 5 mandatory
₹900
Executive Engineer Panchayat R&B Division Bharuch
₹14,500
19 Jun 2026
19 Jun 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
No. figures Amount
1 Excavation for foundation up to 1.50 Mt depth including sorting out and 38.90 Cum 117.08
stacking of usefull materials and disposing of the excavated stuff upto
Mt lead (B) Loose or soft soil .
2 Filling available excavated earth (excluding rock in trenches plinth,slides 25.60 Cum 130.39
of foundations etc. in layers not exceeding 20 cm in depthconsolidating
each deposited layer by ramming and watering)
3 Providing and laying cement concrete work 1:2:4 (M-150) (1-Cement : 2- 3.90 Cum 3746.12
Coarse sand : 4- graded stone aggregates 20 mmnominal size) and
curing complete excluding cost of formwork andreinforcement for
reinforced concrete work in (A) Foundations,footings, Base or columns
and Mass concrete.
4 Providing and laying cement concrete 1:1:2 (M-250) and curingcomplete 7.00 Cum 4730.84
including the cost of form work but excluding cost ofreinforcement for
reinforced concrete work in Foundations,footings bases of columns and
the like and Mass concrete forFooting
5 Providing and laying cement concrete 1:1:2 (M-250) and curingcomplete 2.60 Nos 8324.42
including the cost of form work but excluding cost ofreinforcement for
reinforced concrete work in Foundations,footings bases of columns and
the like and Mass concrete forbelow plinth columns.
6 6 Construction of granular sub-base Grading-I by providing coarsegraded 558.20 Nos 615.09
B.T. machine crushed material satisfying MOSTspecification of grading I
including spreading in uniform layers withmotor grader on prepared
surface, mixing by mix in place methodwith rotavator at OMC, and
compacting with vibratory roller to achieve the desired density, etc
7 Providing and laying Cement Concrete 1:1.5:3 (M 200) and 56.50 Cum 4262.20
curingcomplete Including the cost of formwork But Excluding the cost
ofreinforcement for reinforced concrete work in R.C.C. Plinth Slab.
8 Providng TMT bars renforcement of FE 500 / 500D for R.C.C.work 3255.00 Kg. 76.21
including bending binding and placing in position complete for all floor.
9 Steel work, riveted in built up sections framed work includingcutting, 10.09 Qt 5818.65
hoisting, fixing in position and applying a priming coat ofred lead paint. (A)
In beams and joists, channels angles Tees,flats, with connecting plates or
angle cleats as in main and crossbeams. Hip and jack rafters, purlins
conneted to common rafters
10 Polypropylene UV resistant PE straight and PP curlymonofilament yarn 6005.700 Sq.ft 71.38
Artificial Turf
11 Providing Green Polyethylene Net29.00 29.000 1812.95
TOTAL Rs.
i.e. Rs. Fourteen lacs Fourty Nine thousand Four hundred Fifty Five and therty two paisa only.
It. Rate in Total
Description of Item Qty. Unit
No. figures Amount
I/We am/are willing to carry out the work @ ______________ % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
Net Rs. ___________________________ Total Rs. ________________________
In words ____________________ In words ____________________
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and found
Deputy Executive Engineer Sr. Divisional Account Officer Executive Engineer
Panchayat (R & B) Sub Division, Panchayat (R & B) Division, Panchayat (R & B) Division,
Valiya Bharuch Bharuch
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tech spefic index.pdf
SPECI_BOX CRICKET_VAGALKHOD.pdf
SBD_BOX CRICKET_VAGALKHOD.pdf
boq_emrs school.pdf
NIT_Multi Purpuse _EMRS School_BOX CRICKET_VAGALKHOD.pdf
NIVIDA NO. 4.pdf
Download all tender documents and submit your bid