Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹22.2 L
EMD Value
₹44,347
Closing Date
11 Apr 2023, 2:30 pmClosed
OSD HWBF Talcher
HWBF, Talcher
Annual Electrical Maintenance Works at HWBF, Talcher
2023_HWB_744793_1
HWBF/TAL/MAINT (E)/2023/02
Open Tender
Electrical Works
Item Rate
365 days
HWBF Talcher
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹44,347
19 Apr 2023
15 Mar 2023
12 Apr 2023
15 Mar 2023
11 Apr 2023
16 Mar 2023
Amount
Wiring for light /power plug / circuit wiring/ sub main wiring with PVC insulated copper wire in PVC conduit/casing caping as reqd. (supply of PVC conduit/casing caping wire in dept. scope) upto 3 × 4.0 mm² inclusive of earth copper wire.
Checking of Earthing, Split pin, Check pin etc. in angle of safety point of view of Fan rectification including overall cleaning replacement of split pin, check nut etc. where required.
Installation of TPN switches from 32 AMP to 125 AMP
Installation of TPN switches from 240 AMP to 300 AMP
Surface cable of 3/4 core wiring on the wall, channel etc (materials will be supplied by dept.)
up to 16 sq. mm.
more than 16 sq. mm. to 125 sq. mm.
CABLE LAYING: -laying of PVC/XLPE armoured /un armoured 3/4 core at a depth of 900 mm with brick supporting at side and top. work involve cutting of trench, back filling ramming etc. [Brick, Sand & other materials will be Dept. Scope]
Up to 70 sq. mm. PVC.
Above 70 sq. mm. to 250 sq. mm
Glanding and both end termination of cables (Materials will be supplied by HWP.)
up to 16 sq. mm.
more than 16 sq. mm. to 125 sq. mm.
Repairing/ replacement of defective components / electrical installations such as switch, socket, holder, fan, regulator, light points including cleaning in the Technical Building, Laboratory and Substation building etc. and attending no power supply of any installations.
Checking, testing, installing, repairing, replacing and maintenance of street light fittings located at different location in the Plant and different components including attending the loose connections.
Checking, testing, installing, repairing, replacing and maintenance of Emergency DC light fittings located at different location in the Plant and different components including attending the loose connections.
Replacement of 1 or 2 pole MCB, Kit Kat fuse base unit up to 64 amp. MCB or fuse base will be supplied by departmentally.
Replacement of 3 or 4 pole MCB MCB or fuse base will be supplied by departmentally.
Temporary power supply connection / disconnection at different location (material collection from plant store and safe return to plant in contractor scope)
Maintenance of Battery banks including cleaning of terminals and maintaining electrolyte level.
Preventive Maintenance of 415 V Power Distribution Boards
Preventive Maintenance of 415 V MCCs
Preventive Maintenance/ Overhauling of 415 V LT Air circuit breaker.
Preventive Maintenance of 415 V Emergency Board located in Sub Station
Complete Maintenance / Repairing of Thermic Fluid Heaters & equipments at Boron 32 Unit / Boron 31 Unit
Break Down Maintenance of Thermic Fluid Heater coils at Boron 32 Unit / Boron 31 Unit
Maintenance / Repairing Three Phase Heater at Canteen above 5 kW
Maintenance / Repairing Single Phase Heater at Canteen upto 5 kW
Preventive Maintenance of 415 V Motor upto 5 kW
Preventive Maintenance of 415 V Motor above 5 kW upto 15 kW
Preventive Maintenance of 415 V Motor above 15 kW upto 45 kW
Preventive Maintenance of 200 kVA / 400 kVA DG Set
Preventive Maintenance of 25 kVA DG Set
Diesel Oil topping up in DG Sets
Preventive Maintenance of electrical equipments and circuits of Lathe L-22 / Lathe (Small) / Radial Drill / Welding / Shaping Machines
Checking of Earth Resistance of earthpits.
Checking of Earth Continuity of equipments pit.
Provision of earthing with connection complete in all respect with GI pipe medium density 'B' class (Blue) confirming to IS 1239 part I length 3 mtrs., bore 50 mm. Digging pit and refilling it with charcoal and salt in successive layer . Masonry enclosure of 45cm × 45cm × depth 1 feet (inside) with thickness 10 cm should be provided at top, hinged MS cover, water funnel etc. as per drawing and IS 3043. Grouting of a GI strip of size 6mm x 50mm with holes in nearest point on wall and connection with earth electrode . (All material will be supplied by the contractor)
Checking, testing, installing, repairing, replacing and maintenance of Flame Proof light fittings located at different location in the Plant and different components including attending the loose connections, cleaning and attending the defects and repairing
Preventive Maintenance of 415 V CWC / Offside / Process Board
Preventive Maintenance of 11 kV Bus
Preventive Maintenance of 11 kV Breaker
Preventive Maintenance of Electrode Boiler
Preventive Maintenance of 11 kV / 415 V 1600 kVA CWC / Offside / Process Transformer
Preventive Maintenance of 11 kV Capacitor Bank
Replacement of Silica Gel in the Transformer / Oil top up including testing of oil sample.
Cleaning of Insulators in 132 kV Line - I / Line - II System
Preventive Maintenance of 8 MVA , 132 kV / 11 kV Transformer T - 10 / T - 11
Preventive Maintenance of 132 kV circuit breakers
Preventive Maintenance of 132 kV Isolators
Complete Overhauling of ceiling fan (upto 56") inclusive bearing replacement, electrical connection, drying of coil painting with enamel paint inclusive of fan removal & fixing. [Material supply will be Dept. Scope]
Complete Overhauling of 415 V Motors upto 45KW inclusive bearing replacement, electrical connection, drying of coil painting with enamel paint inclusive of fan removal & fixing. [Material supply will be Dept. Scope]
Checking, testing, installing, repairing, replacing and maintenance of Air Cooler
Supply and installation of Air cooler cooling pad for Bajaj DC 2004 model air cooler
Assisting to RTC shift staff in operation of electrical equipments like 415V breakers, Isolators, switches as and when required of different units i.e substation, VSPP, TBP, BEXD, KBF4, BACU, IETP etc. at HWP Talcher including recording electrical parameters of substation on monthly basis.
Clearing of grass, brush wood, triming of trees and saplings under area covering the 132KV termination bay and along the periphery of 132KV switchyard of 1770 sqm. including removal of rubbish upto a distance of 50 m outside the periphery of area cleared as when required as directed by EIC
PROGRESSIVE ENGINEERS AND ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .