Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance R O CHUCHOT LEH LADAKH UT | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹53.1 L
EMD Value
₹1.1 L
Closing Date
29 Jan 2026, 4:00 pmClosed
EE PW(RnB) Div Sankoo
EE PW(RnB) Div Sankoo
Construction of Compound walling Hamari Sankoo (Forest Department) Under SDP
2026_PWD_18374_1
E-Tender 42 PW(RnB) Div Sankoo 2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Sankoo
Please refer Tender documents.
3 documents required · 3 mandatory
₹532
EE PW(RnB) Div Sankoo
₹1.1 L
30 Jan 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
29 Jan 2026
20 Jan 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All Kinds of Soil @70%
Soft Rock @30%
Dry stone pitching (any thickness) including cost of stones and carriage complete. On Horizontal
Providing and laying in position specified grade of cement concrete excluding the cost of centering and , shuttering , All work up to plinth level 1:4:8 (1cement: 4 coarse sand : 8 graded stone aggregate (40mm nominal size)
Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level including curing by excluding form work costs.complete job
Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases of columns etc. for mass concrete.
Columns, pillars, piers, abutments, posts and struts
Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 1:3:6 (1 Cement: 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size
12mm thick Cement Plaster 1:4 mix (1cement: 4 Course Sand)
Providing and fixing Ornamental Steel Gate as per Direction of site Engineer in charage incld. Cutting welding Priming and Painting comlete.
Carriage of sand for an avg lead of 2km By MT
Carriage of Nallah agg for an avg lead of 2km By MT
Crushed Agg for an avg lead of 10Km by MT
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_44237.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .