Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L Quoted ₹2.7 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹2.8 L+₹8,524 (3.12%)Rejected-AOC SHASWTA CITY PUPUNKI KALA PATHAR CHAS BOKARO JHARKHAND INDIA 827013 | BOKARO | JHARKHAND | 827013 | ₹2.8 L+₹8,524 (3.12%) | L2 | Rejected-AOC REJ |
| 3 | L3₹2.8 L+₹11,334 (4.15%)Rejected-AOC | ₹2.8 L+₹11,334 (4.15%) | L3 | Rejected-AOC REJ |
| Sl No | Description | Qty | Unit | Maa Chhinnamasta Electrical Works L3 | M/S SAURAV ENTERPRISES L1 | M/S CHIRAG ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cost of SE Copper wire/strip size 8 SWG Total no of
coil =60 and each coil weight= 4Kg | 240 | Kg | 1,200 ₹2,88,000 | 1,173.62 ₹2,81,668.8 | 600 ₹1,44,000 Lowest |
| 2.00 | Cost of insulation charges @ 15% of sl. No. 1 | 1 | job | 43,200 ₹43,200 | 42,250.32 ₹42,250.32 | 21,600 ₹21,600 Lowest |
| 3.00 | Cost of labour charges @ 15% of sl.no. 1 | 1 | job | 43,200 ₹43,200 | 42,250.32 ₹42,250.32 | 21,600 ₹21,600 Lowest |
| 4.00 | Cost of moulding of coil with DLC mica with class H insulation | 60 | coil | 875 ₹52,500 | 890.51 ₹53,430.6 | 650 ₹39,000 Lowest |
| 5.00 | Cost of repairing of cable entry box /terminal box by drilling/welding and thread cutting | 18 | hrs | 350 ₹6,300 | 244.2 ₹4,395.6 Lowest | 3,500 ₹63,000 |
| 6.00 | cost of welding electrode | 2 | kg | 1,500 ₹3,000 | 1,793.24 ₹3,586.48 | 850 ₹1,700 Lowest |
| 7.00 | HT Insulator of terminal Block | 6 | Nos. | 300 ₹1,800 Lowest | 976.8 ₹5,860.8 | 4,100 ₹24,600 |
| 8.00 | Brass stude with nut washer | 6 | Nos. | 1,500 ₹9,000 | 651.8 ₹3,910.8 Lowest | 2,000 ₹12,000 |
| 9.00 | Copper shorting link 300 KW HT Motor | 3 | Nos. | 2,000 ₹6,000 | 203 ₹609 Lowest | 5,000 ₹15,000 |
| 10.00 | Contractor's profit @ 10% on sl.no. 3 | 1 | Nos. | 4,320 ₹4,320 | 4,225.03 ₹4,225.03 Lowest | 25,610 ₹25,610 |
Tender Value
₹4.0 L
EMD Value
₹4,200
Closing Date
18 May 2026, 6:00 pmClosed
SO ENM
SO ENM OFFICE RAJRAPPA
Repairing and rewinding of the induction motor (SI.NO. 14805001, KW 300, 6600V, 993rpm) of Rajrappa Washery Project.
2026_CCL_359190_1
GM(R)/SOENM/26-27/Et/13dt 7.5.26
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
RAJRAPPA
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,200
17 Jul 2026
7 May 2026
19 May 2026
8 May 2026
18 May 2026
8 May 2026
8 May 2026 - 11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of SE Copper wire/strip size 8 SWG Total no of
coil =60 and each coil weight= 4Kg | 240 | Kg | 3,880 | ₹9,31,200 |
| 2 | Cost of insulation charges @ 15% of sl. No. 1 | 1 | job | 3,880 | ₹3,880 |
| 3 | Cost of labour charges @ 15% of sl.no. 1 | 1 | job | 3,880 | ₹3,880 |
| 4 | Cost of moulding of coil with DLC mica with class H insulation | 60 | coil | 3,880 | ₹2,32,800 |
| 5 | Cost of repairing of cable entry box /terminal box by drilling/welding and thread cutting | 18 | hrs | 3,880 | ₹69,840 |
| 6 | cost of welding electrode | 2 | kg | 3,880 | ₹7,760 |
| 7 | HT Insulator of terminal Block | 6 | Nos. | 3,880 | ₹23,280 |
| 8 | Brass stude with nut washer | 6 | Nos. | 3,880 | ₹23,280 |
| 9 | Copper shorting link 300 KW HT Motor | 3 | Nos. | 3,880 | ₹11,640 |
| 10 | Contractor's profit @ 10% on sl.no. 3 | 1 | Nos. | 3,880 | ₹3,880 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_372055.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .