Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAccepted-AOC | ₹42.6 L Quoted ₹42.7 L | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder |
| 2 | L2₹43.1 LRejected-AOC | ₹43.1 L | L2 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 3 | L3₹47.7 LRejected-AOC | ₹47.7 L | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 4 | L4₹47.8 LRejected-AOC | ₹47.8 L | L4 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 5 | Not Admitted-Fee | - | - | Not Admitted-Fee EMD/Instrument is not valid |
| Sl No | Description | Qty | Unit | M/S SAMAR ELECTRICALS L2 | ZAHOOR TRADERS L4 | M/S R.S. ENGINEERING TRADERS L3 | DURGESH CHANDEL L1 |
|---|---|---|---|---|---|---|---|
| 1.00The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Aonla Approx. distance upto 100 Km. Including safe loading and unloading. | |||||||
| 1.01 | PCC Pole 8.5 Mtr | 123 | Nos. | 900 ₹1.1 L | 950 ₹1.2 L | 950 ₹1.2 L | 450 ₹55,350 |
| 1.02 | ACSR Weasal Conductor | 1,073 | Mtr | 4 ₹4,292 | 6 ₹6,438 | 5 ₹5,365 | 5 ₹5,365 |
| 1.03 | AB Cable 3x50 sqmm | 4,300 | Mtr | 6 ₹25,800 | 6 ₹25,800 | 5 ₹21,500 | 5 ₹21,500 |
| 1.04 | AB Cable 3x95 sqmm | 440 | Mtr | 6 ₹2,640 | 6 ₹2,640 | 5 ₹2,200 | 5 ₹2,200 |
| 1.05 | 11/0.4 KV 3 Phase 250 KVA T/F | 25 | Nos. | 5,000 ₹1.3 L | 5,500 ₹1.4 L | 5,500 ₹1.4 L | 5,500 ₹1.4 L |
| 1.06 | 11/0.4 KV 3 Phase 25 KVA T/F | 22 | Nos. | 3,000 ₹66,000 | 3,500 ₹77,000 | 3,500 ₹77,000 | 3,500 ₹77,000 |
| 1.07 | LT Cable 1x240 sqmm | 720 | Mtr | 6 ₹4,320 | 6 ₹4,320 | 5 ₹3,600 | 5 ₹3,600 |
| 1.08 | LT Cable 1x400 sqmm | 100 | Mtr | 6 ₹600 | 6 ₹600 | 5 ₹500 | 5 ₹500 |
| 1.09 | LT Cable 3.5x70 sq mm | 162 | Mtr | 2 ₹324 | 6 ₹972 | 5 ₹810 | 5 ₹810 |
Tender Value
₹43.1 L
EMD Value
₹43,130
Closing Date
18 Sept 2025, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For Increasing Capacity of Existing Distribution Transformer of Various Capacity Transformes at Various Places under Business Paln 2025-26 scheme under EDD-Aonla.
2025_MVVNL_1070865_1
16/EDCB/2025-26
Open Tender
Electrical Works
90 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE,EDC
₹43,130
29 Dec 2025
3 Sept 2025
19 Sept 2025
3 Sept 2025
18 Sept 2025
3 Sept 2025
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Aonla Approx. distance upto 100 Km. Including safe loading and unloading.
PCC Pole 8.5 Mtr
ACSR Weasal Conductor
AB Cable 3x50 sqmm
AB Cable 3x95 sqmm
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
LT Cable 1x240 sqmm
LT Cable 1x400 sqmm
LT Cable 3.5x70 sq mm
Other Line material i.e., 33 KV & 11 KV pin insulater/stay/earthing complete/Disc Fitting/Disc Insulators/Dropper Channel/Crossing Bracing/ Top Channel/Binding Wire/Danger Board/Barbed Wire/numberplate/stone pad/Control Cable etc
Construction of T/F plinth 2x2x1 m3 for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect
Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE)
Dismentaling of 100 KVA Transformer as per norms complete in all respect
Dismentaling of 16 KVA Transformer as per norms complete in all respect
Dismentaling of 10 KVA Transformer as per norms complete in all respect
Mounting of 250 KVA T/F Transformers as per norms complete in all respect -
Mounting of 25 KVA T/F Transformers as per norms complete in all respect -
Fabrication & Installation of 11 KV Fuse set comptele unit to be installed on midway of 11 KV Double Pole Structure Complete in all respect
Installation of LT Fuse Box With SMC Box Complete in all respect
Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Laying of LT Cable 1x240 sq mm complete in all respect
Laying of LT Cable 1x400 sq mm complete in all respect
Laying of LT Cable 3.5x70 sq mm complete in all respect
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
AB Cable 3x50 sqmm
AB Cable 3x95 sqmm
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Fixing of 3 Pahse Distribution Box complete in all respect
Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost)
Holding Clamp for S/s
LT 'T' Off
Stone Pad 300x300x75 mm
Danger Board
Barbed Wire
Piercing Connector
LT Clamp with Nut & Bolt
LT Pole Clamp eith Nut & Bolt For PCC Pole
Earthwire Clamp
Suspension Clamp
Dead End Clamp
Aluminium Lug 240 sqmm with Nut&Bolt
Tailless Unit Suitable For 250 KVA DT
Copper "L" Piece 50x225x10 mm For Tail less Unit
Fuse Wire 30 SWG
Al. Leg Long Barrel off Size
All Bus Bar 65x10 mm
11 KV Fuse Set Complete (11 KV DO Fuse Set- 1 Nos, MS Channel 100x50x2028mm-1 No., Holding Clamp with n&B-2 Nos, Al Lug 70 Sqmm-9 Nos)
LT Fuse Set Protection for DT with SMC Box
Connecting Lead 1x16 sq mm
Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto 85 Km including loading & unloading.
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 16 KVA T/F
11/0.4 KV 3 Phase 10 KVA T/F
M/S SAMAR ELECTRICALS (BID ID -5535426)
M/S R.S. ENGINEERING TRADERS (BID ID -5543983)
ZAHOOR TRADERS (BID ID -5544038)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid