| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹14.2 LAccepted-AOC DASDA BAZAR KANCHANPUR NORTH TRIPURA | KANCHANPUR | NORTH TRIPURA | TRIPURA | ₹14.2 L | 1st | Accepted-AOC Quoted Reasonable Rate |
| 2 | 2nd₹15.0 LRejected-AOC | ₹15.0 L | 2nd | Rejected-AOC Quoted High Rate |
Tender Value
₹13.8 L
EMD Value
₹27,569
Closing Date
22 Apr 2026, 3:00 pmClosed
Chief Executive Officer
CEO, MNP
Const.of Open Community Shed near Mashjid Bari of Ward no.07 under Mohanpur Municipal Council during the year 2024-25 Under BEUP Scheme
2026_Urban_71953_1
74/MMC/MNP/2025-26 dt,30/03/2026
Open Tender
Civil Works
180 days
As per DNIT
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹27,569
27 May 2026
7 Apr 2026
22 Apr 2026
7 Apr 2026
22 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil cum | 33.35 | cum | - | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc.with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering - -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | cum | - | - |
| 4 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
| 5 | Centering shuttering including struttings, propping etc.and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank | 1 | sqm | - | - |
| 6 | Centering shuttering including struttings, propping etc.and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 1 | sqm | - | - |
| 7 | Centering shuttering including struttings, propping etc.and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 1 | sqm | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) cum | - | cum | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto15°landings,balconies,shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 1 | cum | - | - |
| 10 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
DNIeT74.pdf
Tender Documents • 3.95 MB
BOQ_73225.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid