Tender Value
₹1.7 Cr
EMD Value
₹2.3 L
Closing Date
13 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRACTION
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- "Erection, testing and commissioning of 25kV Overhead Electric Equipment in Railways. (OR) Construction and commissioning of transmission lines of 66kV or above voltage of requisite value as per the technical eligibility criteria. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of transmission line work produced to satisfy technical eligibility criteria. ( O R ) Provision or modification to sub- stations/switching stations/switch gear equipment, control and protection equipment, reactors, power factor correction equipment, transformers or any other power equipment in 25 kV Railway sub-stations/Switching stations or any work pertaining to 66kV and above Electrical sub-station of any PSU/Govt, agencies. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of above Substations/Switching stations work produced to satisfy technical eligibility criteria
15 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All the bidder/Tenderers should ensure that they are GST compliant
GTL div: Replacement of Leaning/critical and less contact wire height OHE structures due to raising of track with new OHE structure in connection with safety in RU-GY-DMM section
GTL-TRD-29-eTN-77-2025-26~SCR
GTL-TRD-29-eTN-77-2025-26
Open
Works - General
12 Months
Anantapur, Andhra Pradesh
₹0
₹2.3 L
13 Feb 2026
23 Jan 2026
30 Jan 2026
132 items across 6 schedules · ₹1,66,77,604 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply & Erection | Per Track KM | 12.00 | 20,066 | 2,40,792 |
| 2 | Supply & Erection | Each | 50.00 | 668 | 33,400 |
| 3 | Erection/ Labour | MT | 38.00 | 3,465 | 1,31,670 |
| 4 | 32/3(a)-Extra Rate for Erection Under Power Block | MT | 38.00 | 3,465 | 1,31,670 |
| 5 | Erection/ Labour | MT | 7.00 | 15,267 | 1,06,869 |
| 6 | 32/3(b)-Extra Rate for Erection Under Power Block | MT | 7.00 | 15,267 | 1,06,869 |
| 7 | Supply/Material | Each | 18.00 | 9,331 | 1,67,958 |
| 8 | Erection/ Labour | Each | 18.00 | 1,120 | 20,160 |
| 9 | 32/3(e)-Extra Rate for Erection Under Power Block | Each | 18.00 | 1,120 | 20,160 |
| 10 | Supply/Material | Each | 80.00 | 12,114 | 9,69,120 |
| 11 | Erection/ Labour | Each | 64.00 | 1,080 | 69,120 |
| 12 | 32/4(a)(i)-Extra Rate for Erection Under Power Block | Each | 64.00 | 1,080 | 69,120 |
| 13 | Erection/ Labour | Each | 16.00 | 1,619 | 25,904 |
| 14 | 32/4(a)(ii)-Extra Rate for Erection Under Power Block | Each | 16.00 | 1,619 | 25,904 |
| 15 | Erection/ Labour | Each | 4.00 | 1,859 | 7,436 |
| 16 | 32/4(a)(iii)-Extra Rate for Erection Under Power Block | Each | 4.00 | 1,859 | 7,436 |
| 17 | Erection/ Labour | Metre | 150.00 | 207 | 31,050 |
| 18 | 32/7(c)-Extra Rate for Erection Under Power Block | Metre | 150.00 | 207 | 31,050 |
| 19 | Supply/Material | Each | 16.00 | 21,221 | 3,39,536 |
| 20 | Erection/ Labour | Each | 16.00 | 4,000 | 64,000 |
| 21 | 32/8(a)(v)-Extra Rate for Erection Under Power Block | Each | 16.00 | 4,000 | 64,000 |
| 22 | Erection/ Labour | Each | 16.00 | 185 | 2,960 |
| 23 | Supply/Material | Each | 6.00 | 4,444 | 26,664 |
| 24 | Erection/ Labour | Each | 6.00 | 956 | 5,736 |
| 25 | 32/8(b)(i)-Extra Rate for Erection Under Power Block | Each | 6.00 | 956 | 5,736 |
| 26 | Supply/Material | Each | 16.00 | 8,201 | 1,31,216 |
| 27 | Erection/ Labour | Each | 16.00 | 1,120 | 17,920 |
| 28 | 32/8(b)(ii)-Extra Rate for Erection Under Power Block | Each | 16.00 | 1,120 | 17,920 |
| 29 | Supply/Material | Each | 1.00 | 5,192 | 5,192 |
| 30 | Erection/ Labour | Each | 1.00 | 1,000 | 1,000 |
| 31 | 32/8(b)(iii)-Extra Rate for Erection Under Power Block | Each | 1.00 | 1,000 | 1,000 |
| 32 | Supply/Material | Each | 4.00 | 22,000 | 88,000 |
| 33 | Erection/ Labour | Each | 4.00 | 3,372 | 13,488 |
| 34 | 32/9(a)-Extra Rate for Erection Under Power Block | Each | 4.00 | 3,372 | 13,488 |
| 35 | Supply/Material | Each | 4.00 | 1,859 | 7,436 |
| 36 | Erection/ Labour | Each | 4.00 | 711 | 2,844 |
| 37 | 32/11(a)(i)-Extra Rate for Erection Under Power Block | Each | 4.00 | 711 | 2,844 |
| 38 | Supply/Material | Each | 4.00 | 2,022 | 8,088 |
| 39 | Erection/ Labour | Each | 4.00 | 494 | 1,976 |
| 40 | 32/11(a)(ii)-Extra Rate for Erection Under Power Block | Each | 4.00 | 494 | 1,976 |
| 41 | Supply/Material | Each | 4.00 | 850 | 3,400 |
| 42 | Erection/ Labour | Each | 4.00 | 336 | 1,344 |
| 43 | 32/11(b)-Extra Rate for Erection Under Power Block | Each | 4.00 | 336 | 1,344 |
| 44 | Supply/Material | Each | 2.00 | 51,930 | 1,03,860 |
| 45 | Erection/ Labour | Each | 2.00 | 3,117 | 6,234 |
| 46 | 32/12(a)-Extra Rate for Erection Under Power Block | Each | 2.00 | 3,117 | 6,234 |
| 47 | Supply/Material | Each | 2.00 | 40,128 | 80,256 |
| 48 | Erection/ Labour | Each | 2.00 | 2,891 | 5,782 |
| 49 | 32/13(a)-Extra Rate for Erection Under Power Block | Each | 2.00 | 2,891 | 5,782 |
| 50 | Supply/Material | Each | 20.00 | 756 | 15,120 |
| 51 | Erection/ Labour | Each | 20.00 | 356 | 7,120 |
| 52 | 32/15(a)-Extra Rate for Erection Under Power Block | Each | 20.00 | 356 | 7,120 |
| 53 | Supply/Material | Each | 12.00 | 2,126 | 25,512 |
| 54 | Erection/ Labour | Each | 12.00 | 680 | 8,160 |
| 55 | 32/15(b)-Extra Rate for Erection Under Power Block | Each | 12.00 | 680 | 8,160 |
| 56 | Supply/Material | Each | 70.00 | 833 | 58,310 |
| 57 | Erection/ Labour | Each | 70.00 | 304 | 21,280 |
| 58 | Erection/ Labour | Each | 70.00 | 107 | 7,490 |
| 59 | Supply/Material | Metre | 50.00 | 2,250 | 1,12,500 |
| 60 | Erection/Labour | Metre | 50.00 | 146 | 7,300 |
| 61 | 32/26(a)(ii)-Extra Rate for Erection Under Power Block | Metre | 50.00 | 146 | 7,300 |
| 62 | Supply/Material | Each | 20.00 | 1,231 | 24,620 |
| 63 | Erection/Labour | Each | 20.00 | 47 | 940 |
| 64 | 32/26(c)(i)-Extra Rate for Erection Under Power Block | Each | 20.00 | 47 | 940 |
| 65 | Supply/Material | Each | 8.00 | 1,416 | 11,328 |
| 66 | Erection/Labour | Each | 8.00 | 47 | 376 |
| 67 | 32/26(c)(ii)-Extra Rate for Erection Under Power Block | Each | 8.00 | 47 | 376 |
| 68 | Erection/Labour | Each | 80.00 | 1,870 | 1,49,600 |
| 69 | 32/31(a)-Extra Rate for Erection Under Power Block | Each | 80.00 | 1,870 | 1,49,600 |
| 70 | Erection/Labour | Set | 4.00 | 2,558 | 10,232 |
| 71 | 32/31(e)-Extra Rate for Erection Under Power Block | Set | 4.00 | 2,558 | 10,232 |
| 72 | Erection/Labour | Each | 2.00 | 2,622 | 5,244 |
| 73 | 32/31(f)-Extra Rate for Erection Under Power Block | Each | 2.00 | 2,622 | 5,244 |
| 74 | Erection/Labour | Each Span | 2.00 | 2,286 | 4,572 |
| 75 | Erection/Labour | Each | 2.00 | 1,780 | 3,560 |
| 76 | 32/31(h)-Extra Rate for Erection Under Power Block | Each | 2.00 | 1,780 | 3,560 |
| 77 | Erection/Labour | Each | 4.00 | 336 | 1,344 |
| 78 | 32/31(i)-Extra Rate for Erection Under Power Block | Each | 4.00 | 336 | 1,344 |
| 79 | Erection/Labour | Each | 4.00 | 494 | 1,976 |
| 80 | 32/31(j)(i)-Extra Rate for Erection Under Power Block | Each | 4.00 | 494 | 1,976 |
| 81 | Erection/Labour | Each | 4.00 | 589 | 2,356 |
| 82 | 32/31(j)(ii)-Extra Rate for Erection Under Power Block | Each | 4.00 | 589 | 2,356 |
| 83 | Erection/Labour | Each | 55.00 | 3,062 | 1,68,410 |
| 84 | 32/31(k)(i)-Extra Rate for Erection Under Power Block | Each | 55.00 | 3,062 | 1,68,410 |
| 85 | Erection/Labour | Each | 3.00 | 4,376 | 13,128 |
| 86 | 32/31(k)(ii)-Extra Rate for Erection Under Power Block | Each | 3.00 | 4,376 | 13,128 |
| 87 | Erection/Labour | Each | 15.00 | 11,520 | 1,72,800 |
| 88 | 32/31(l)(i)-Extra Rate for Erection Under Power Block | Each | 15.00 | 11,520 | 1,72,800 |
| 89 | Erection/Labour | Each | 18.00 | 524 | 9,432 |
| 90 | 32/31(n)-Extra Rate for Erection Under Power Block | Each | 18.00 | 524 | 9,432 |
| 91 | Erection/Labour | MT | 1.00 | 5,359 | 5,359 |
| 92 | 32/31(p)-Extra Rate for Erection Under Power Block | MT | 1.00 | 5,359 | 5,359 |
| 93 | Erection/Labour | MT | 4.00 | 709 | 2,836 |
| 94 | 32/31(s)-Extra Rate for Erection Under Power Block | MT | 4.00 | 709 | 2,836 |
| 95 | Erection/Labour | Each | 16.00 | 2,542 | 40,672 |
| 96 | 32/31(t)(i)-Extra Rate for Erection Under Power Block | Each | 16.00 | 2,542 | 40,672 |
| 97 | Erection/Labour | Each | 4.00 | 1,480 | 5,920 |
| 98 | 32/31(t)(iii)-Extra Rate for Erection Under Power Block | Each | 4.00 | 1,480 | 5,920 |
| 99 | Erection/Labour | Each | 32.00 | 140 | 4,480 |
| 100 | 32/31(t)(iv)-Extra Rate for Erection Under Power Block | Each | 32.00 | 140 | 4,480 |
| 101 | Erection/Labour | Each | 16.00 | 515 | 8,240 |
| 102 | 32/31(t)(v)-Extra Rate for Erection Under Power Block | Each | 16.00 | 515 | 8,240 |
| 103 | Erection/Labour | Each | 6.00 | 2,411 | 14,466 |
| 104 | 32/31(t)(viii)-Extra Rate for Erection Under Power Block | Each | 6.00 | 2,411 | 14,466 |
| 105 | Erection/Labour | Each Span | 100.00 | 4,376 | 4,37,600 |
| 106 | 32/31(t)(ix)-Extra Rate for Erection Under Power Block | Each Span | 100.00 | 4,376 | 4,37,600 |
| 107 | Erection/Labour | Each | 70.00 | 145 | 10,150 |
| 108 | Erection/Labour | MT | 30.00 | 140 | 4,200 |
| 109 | Erection/Labour | MT | 30.00 | 240 | 7,200 |
| 110 | Erection/Labour | MT | 1.00 | 120 | 120 |
| 111 | Erection/Labour | MT | 1.00 | 120 | 120 |
| 112 | Transportation/Labour | MT-Km | 800.00 | 116 | 92,800 |
| 113 | Supply/Material | Each | 60.00 | 516 | 30,960 |
| 114 | Erection/Labour | Each | 60.00 | 100 | 6,000 |
| 115 | Supply/Material | Each | 20.00 | 1,049 | 20,980 |
| 116 | Erection/Labour | Each | 20.00 | 149 | 2,980 |
| Schedule total | ₹58,52,288 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .