Tender ID
Tender Value
₹77.1 Cr
EMD Value
₹77.1 L
Closing Date
27 Mar 2026, 6:30 pmClosed
Vice President, (P), GUDC Ltd., Gandhinagar
Vadnagar Interlinking and Desilting of water bodies (Package-1) (3rd Invitation) : Desilting, Redevelopment and Construction of selected water bodies and interlinking of various water bodies with 2-year post completion maintenance in Vadnagar Town, District Mehsana, Gujarat under SJMMSVY
286144
GUDC/PROJECTS/SJMMSVY/Vadnagar Interlinking Pond
Open
Civil Works - Others
Works
Gandhinagar
3 documents required · 3 mandatory
₹35,400
GUDC Ltd., Gandhinagar
₹77.1 L
13 Mar 2026
13 Mar 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
Schedule-B-1 Survey, Desilting, Excavation & Cofferdam
Schedule-B-2 Stone Pitching for Water bodies
Schedule-B-3 Recharge Well, Percolation Well & Bore Hole
Schedule-B-4 RCC Approach Road
Schedule-B-5 Inlet Structure
Schedule-B-6 Outlet Structure
Schedule-B-7 Interlinking
Schedule-B-8 Utility Shifting, Crossing and Box Culvert
Schedule-C Maintenance for 2-Years
Total Project Cost
I/We am/are willing to carry out the work at ………………… above/below/at par percent (should be written in figures and words),
the estimated rates mentioned above. Now amount of my/our tender works out as under.
* Estimated Amount * Estimated Amount
Put To Tender Put To Tender
Rupees In Word………………………………………………. Rupees In Word……………………………………………….
Schedule-B-1 : Survey, Desilting, Excavation & Cofferdam
Item Description Unit Qty. Rate Amount
1 DGPS/ Total station Surveying as directed by Engineer In- Sq.km 1.08 252500
Cleaning & Shrubbing
Clearing and grubbing road land including uprooting
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials By
mechanical means in area of light jungle
Dewatering for waterbody and allied works, foundation
3 areas, pits, trenches with diesel or electrical pumping HP/Hr 36801.93 21.07
arrangements including all cost of pipeline, materials,
labours as directed with all lifts etc. complete.
Excavation for foundation required depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto required lead.
Hard Murrum. All Excavated earth shall be used to
create a equally leveled bund around the lake as
directed by the engineer in charge
Up to 1.5 mt Depth
(B) Extra for excavation in wet condition and in all strata
Filling in foundation and plinth with murrum or selected
5 soil in layers of 20cm. thickness including watering, Cu.m. 213428.71 269.75
ramming and consolidating etc. complete
Providing and constructing cofferdam in waterbodies
including earth embankment, polyethylene sheet, 3 Per
layers of sand bags, and dismentaling cofferdam after Bag
completion of the work as directed by Engineer In
Charge. (Considering 1:2.5 slope with sandbag)
Schedule-B-2 : Stone Pitching for Water bodies
Item Description Unit Qty. Rate Amount
Providing and laying controlled cement concrete M.150
for curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings,Base of columns and Mass
Providing and laying in position Ready Mixed M-300
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
2 reinforced cement concrete work including pumping of Cu.m. 5387.04 5063.42
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate / retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer
in - charge. Without Fly Ash (Min cement level as per
latest IS 456 shall be maintained)
Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering
strutting and propping etc. Height of propping and
3 centering below supporting floor to ceiling not Sq.m. 38158.2 181.85
exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc. and Mass
Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position
complete upto floor two level
Rubble Pitching
Providing and lying dry rubble pitching with base of
inverted filter as per design and drawing including
providing headers or hand packing trimming and
dressing of slopes etc. complete for leads as specified
and all lifts etc. complete.
Schedule-B-3 : Recharge Well, Percolation Well & Bore Hole
Item Description Unit Qty. Rate Amount
Construction of Percolation well (Khmbhati well)
Diameter 2.00 meter and 9.00 meter Depth (including
excavation all lead and lift material, Scafolding work,
removing or spreading excess earth work and all type of
safety precaution as instruction of Engineer incharge)
rate including hollow brick work of 230 mm thickness
and every 1.20 meter solid Brick work of 200 mm and
300 mm thick RCC Slab(including dead shttering) with
mm dia Reinforcement top bottom jali of 100 mm c/c
Depth measure from Top of slab to bottom of well for
waterbodies only.
Bore Hole for Percolation Well
Drilling of 300 / 315mm dia. bore in over burden strata
including lowering of 204 mm dia UPVC/225/ 250mm
dia. PVC / MSERW casing pipes up to required depth and
further drilling of 200mm dia. bore hole in all types of
2 Rocky Strata, soft rock & hard rock strata formation by Rmt. 3400 544
DTH rig including flushing of bore hole by air compressor
and measuring of yield of bore by V not chand fixing of
bore cap etc. complete. (Oer burden up to 12 mtr.) From
0 to 350 meters depth (Assuming depth of 100 m for
each bore hole to reach aqua)
Schedule-B-4 : RCC Approach Road
Item Description Unit Qty. Rate Amount
Excavation for foundation upto 1.5 m depth including
1 sorting out and stacking of useful materials and Cu.m. 53.28 268.21
disposing off the excavated stuff upto 50 Meter lead.
Providing and laying controlled cement concrete
M.150 for curing complete excluding cost of formwork
and reinforcement for reinforced concrete work in (A)
Foundations, footings,Base of columns and Mass
Providing and laying in position Ready Mixed M-300
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
3 reinforced cement concrete work including pumping of Cu.m. 274.72 5063.42
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate / retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer
in - charge. Without Fly Ash (Min cement level as per
latest IS 456 shall be maintained)
Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering
strutting and propping etc. Height of propping and
4 centering below supporting floor to ceiling not Sq.m. 1231.36 181.85
exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc. and Mass
Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position
complete upto floor two level
Schedule-B-4 : RCC Approach Road
Item Description Unit Qty. Rate Amount
Filling available excavated earth (excluding rock) in
6 trenches. plinth, sides of foundations etc. in layers not Cu.m. 757.76 136.92
exceeding 20 cm. in depth consolidating each disposited
layer by ramming and watering.
Schedule-B-5 : Inlet Structure
Item Description Unit Qty. Rate Amount
Excavation for foundation upto 1.5 m depth including
1 sorting out and stacking of useful materials and Cu.m. 285.6 268.21
disposing off the excavated stuff upto 50 Meter lead.
Excavation for foundation 1.5 m 3.0 m depth including
1.1 sorting out and stacking of useful materials and Cu.m. 53.38 287.47
disposing off the excavated stuff upto 50 Meter lead.
Providing and laying rough chiseled dressed stone
flooring over 20mm thick base of cement mortar 1:5 (1-
Cement : 5-coarse sand) or L.M. 1:1.5 including pointing
with cement mortar 1:2 (1-cement : 2-stone dust) etc.
complete. (B) 40mm thick
Providing and laying controlled cement concrete M.150
for curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings,Base of columns and Mass
Providing and laying in position Ready Mixed M-300
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
4 reinforced cement concrete work including pumping of Cu.m. 228.14 5063.42
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate / retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer
in - charge. Without Fly Ash (Min cement level as per
latest IS 456 shall be maintained)
Schedule-B-5 : Inlet Structure
Item Description Unit Qty. Rate Amount
Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering
strutting and propping etc. Height of propping and
5 centering below supporting floor to ceiling not Sq.m. 1770.04 181.85
exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc. and Mass
Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position
complete upto floor two level
Filling available excavated earth (excluding rock) in
7 trenches. plinth, sides of foundations etc. in layers not Cu.m. 100.81 136.92
exceeding 20 cm. in depth consolidating each disposited
layer by ramming and watering.
Filling clayey soil
Filling in foundation and plinth with murrum or selected
soil in layers of 20cm. thickness including watering,
ramming and consolidating etc. complete
Steel work, welded in built up sections framed work
including cutting, hoisting, fixing in position and
applying a priming coat of red lead paint. (A) In beams
and joists, channels angles Tees, flats, with connecting
plates or angle cleats as in main and cross beams. Hip
and jack rafters, purlins conneted to common rafters
Schedule-B-6 : Outlet Structure
Item Description Unit Qty. Rate Amount
Excavation for foundation upto 1.5 m depth including
1 sorting out and stacking of useful materials and Cu.m. 965.76 268.21
disposing off the excavated stuff upto 50 Meter lead.
Excavation for foundation 1.5 m 3.0 m depth including
1.1 sorting out and stacking of useful materials and Cu.m. 83.52 287.47
disposing off the excavated stuff upto 50 Meter lead.
Providing and laying controlled cement concrete M.150
for curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings,Base of columns and Mass
Providing and laying in position Ready Mixed M-300
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
3 reinforced cement concrete work including pumping of Cu.m. 491.73 5063.42
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate / retard setting
of concrete, improve workability without impairing
strength and durability as per direction of the Engineer
in - charge. Without Fly Ash (Min cement level as per
latest IS 456 shall be maintained)
Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering
strutting and propping etc. Height of propping and
centering below supporting floor to ceiling not exceeding
4 M. and removal of the same for in situ reinforced
concrete and plain concrete work in. (A) Foundations
Footings Bases of Columns etc. and Mass concrete
Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in position
complete upto floor two level
Schedule-B-6 : Outlet Structure
Item Description Unit Qty. Rate Amount
Filling available excavated earth (excluding rock) in
6 trenches. plinth, sides of foundations etc. in layers not Cu.m. 824.14 136.92
exceeding 20 cm. in depth consolidating each disposited
layer by ramming and watering.
Providing and fixing 1.80 Metre high fencing with
Metre long M.S. Angle posts 40mm x 40 mm x6 mm and
oil painting 3 coats fixed at 2.5 Mt,C/c. with Seven
Horizontan lines and two diagonals of galvanised steel
7 barbed wire weighting 9.38 Kg. per 100 Metre, strained Rmt. 28405.03 844.68
and fixed to posts with G.I,staples including fixing the
postsin ground with 0.5 M x 0.5.M x 0.5 M. block in
C.C1:5:10 etc complete. with Chain link 2 - 10 x
gauge (Galvanised) fixed on the side using the same
supports with a height of 1.8m.
Outlet Sluice Gate
Sluice gate for waterbodies, including providing
8 supplying at the structure for fixing of sluice gate. Nos 21 219519.77
Mannually operared. Size as per required design and as
directed by Engineer In-Charge.
Schedule-B-7 : Interlinking
Item Description Unit Qty. Rate Amount
Cleaning & Shrubbing
Clearing and grubbing road land including uprooting rank vegetation grass
1 bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees HA 11.90 28455.09
cut earlier and disposal of unserviceable materials By mechanical means in area
of light jungle
2 Demolition including stacking of serviceable materilas and disposal of Cu.m. 938.95 1081.83
unserviceable materials with all lead and lift. (i) R.C.C. work / any Material
Excavation for foundation required depth including sorting out and stacking of
useful materials and disposing off the excavated stuff upto required lead. Hard
Murrum. All Excavated earth shall be used to create a equally leveled bund
around the lake as directed by the engineer in charge
Up to 1.5 mt Depth
Providing and laying controlled cement concrete M.150 for curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in
(A) Foundations, footings,Base of columns and Mass concrete
Providing and laying controlled cement concrete M.250 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work
in (A) Foundations, footings, Base of columns and Mass concrete.
Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. Height of propping
and centering below supporting floor to ceiling not exceeding 4 M. and removal
of the same for in situ reinforced concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc. and Mass concrete
7 Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, kg 596311.41 77.29
binding and placing in position complete upto floor two level
Filling available excavated earth (excluding rock) in trenches. plinth, sides of
foundations etc. in layers not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
Filling clayey soil
9 Filling in foundation and plinth with murrum or selected soil in layers of 20cm. Cu.m. 5612.43 269.75
thickness including watering, ramming and consolidating etc. complete
Earthwork in cutting including preparing the slope and camber andstacking or
utilising the cutting stuff in bank as directed upto 200 Meters from the end of
cutting with all lead and lift. (i) Hard murrum
Schedule-B-8 : Utility Shifting, Crossing and Box Culvert
Item Description Unit Qty. Rate Amount
Removing of existing pipeline incl. removal of specials, valves jointing material
including carting and stacking of removed material from site of work to the
department storeas directed excl. excavation and refilling.
D.I./ C. I. S. & S. Spun Pipes suitable for tyton joints
RCC/ Pre-stressed concrete Pipes
P. V. C./ HDPE/ GRP Pipes
Providing and supplying D. I. K-9 grade pipes for following nominal bore
diameter with internal cement mortar lining including all taxes, insurance,
2 transportation, freight charges, octroi, inspection charges, loading, unloading, Rmt. 50 1127
conveyance to stacking etc. complete. (IS 8329-2000). project cement mortor
lining shall be with sulphate resistance cement
Lowering, laying and jointing C. I. S & S Spun pipes suitable for Tyton joints /
Mortar lined D. I. Pipes of various classes with CI / MS specials of following
diameters in proper position, grade and alignment as directed by Engineer-in-
charge including hydraulic
testing etc. comp.
Providing and supplying ISI Standard R.C.C. pipes (of Sulphate Resisting Cement)
in standard lengths of following class and diameter suitable for either collar
joints or rubber ring joints including all taxes, insurance, transportation, freight
4 charges, octroi, inspection charges, loading, unloading, conveyance to Rmt. 50 881
departmental stores, stacking etc.
Class P3 Test Pressure 6 Kg/sq.cm
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following
diameters in proper position, grade and alignment at all level as directed by
5 Engineer-in-charge including conveyance from stores to site of work, labour, Rmt. 50 136.85
giving hydraulic testing as per ISI code.
Schedule-B-8 : Utility Shifting, Crossing and Box Culvert
Item Description Unit Qty. Rate Amount
Providing and supplying in standard length ISI mark high density Polyethylene
H.D.P.E. Pipes suitable for potable water as per IS specification no. 4984/1995
including all local and central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to the dept. stores etc.
Lowering, laying and jointing HDPE pipes and specials of following class and
diameter (By butt fusion welding method) including cost of conveyance from
7 stores to site of works at all level including cost of labour, material, giving Rmt. 50 8.05
satisfactory hydraulic testing etc. comp
Drilling of 1300mm dia Horizontal borehole for watermain pipeline under the
railway tracks incl all strata with requried length incl fixing of 1200mm dia
M.S.casing pipe of minimum 16mm thick Or IRS Casing Pipe with welding
pushing etc complete Providing & fixing various size of pipe for
559mm/610mm/660mm/711mm dia watermain of G.I/M.S pipe of minimum
6.3mm thick for railway permises as per instruction & regulations of Railway
authority & under supervision of Railway authority incl Provinding, supplying &
fixing of spacer at specified interval if required between Casing pipe and water
main,ISI make sluice valve of required size at both side of railway boundry with
construction of brickedge pavement incl C:C encasing 1:3:6 in 10mtr length of
pipe at both side. Incl Provinding & fixing of M.S/Iron Manhole frame with cover
for valve chamber with loacking arregment etc. complete with all material
labour fabrication,hydraulic testing of pipe & valve etc complete for 45mtr
Without Water main & with MS Casing Pipe
Size 2.5 x 3.0 in all strata of Soil
8.1 Size 3.0 x 3.0 in all strata of Soil Rmt. 50 354172.4
Excavation for foundation upto 1.5 m depth including sorting out and stacking
of useful materials and disposing off the excavated stuff upto 50 Meter lead.
Providing and laying controlled cement concrete M.150 for curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in
(A) Foundations, footings,Base of columns and Mass concrete
Providing and laying in position Ready Mixed M-300 grade concrete for
reinforced cement conctere work, using cement content as per approved
Design Mix manufactured in fully automatic batching plant and transported to
site of work in transit mixer for a lead up to 10 kms having continuous agitated
mixer, manufactured as per mix design of specified grade for reinforced cement
concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate /
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained)
Schedule-B-8 : Utility Shifting, Crossing and Box Culvert
Item Description Unit Qty. Rate Amount
Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. Height of propping
and centering below supporting floor to ceiling not exceeding 4 M. and removal
of the same for in situ reinforced concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc. and Mass concrete
13 Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, kg 16800 77.29
binding and placing in position complete upto floor two level
Filling available excavated earth (excluding rock) in trenches. plinth, sides of
foundations etc. in layers not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
Schedule-C : Maintenance for 2-Years
Item Description Unit Qty. Rate Amount
Comprehensive Operation and Maintenance of the various components of
Bunds, Stone pitching, Recharge wells, Approach Road, Intake Structure, Outlet
Structure, Weir, Crossing, Sluice Gate, Wire Fencing, RCC Drains, Utility
Shifting, Box Culvert intelinking System etc. all allied work.
The also involves integration of essential Operation and Maintenence to
enhance water management efficiency including
1) Breakdown Maintenance or Emergency Maintenance,
1 2) Day to day Maintenance Year 1.00 9,62,574.00
3) Preventive or Periodic Maintenance,
4) Major Maintenance (or Special repairs and replacement including Training
to O & M staff of Municipality). The rate shall also include all consumables and
deployment of Manpower but excluding electric power. The O & M work shall
be carried out as per detailed specifications in the Tender & Maintaining the
record for the same.
Operation and maintainace for 1st Year
2 Operation and maintainace for 2nd Year Year 1.00 10,01,862.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02_SBD_GUDC_Works_GCC_Interlinking_Desilting_of_Lake_Pkg-1.pdf
04_Vol-II_Part-B_Gen_Tech_Spec_Civil_Interlinking_Desilting_of_Lake_Pkg-1.pdf
05_Vol-II_Part-C_General_Tech_Spec_Ele_Interlinking_Desilting_of_Lake_Pkg-1.pdf
06_Vol-II-Part-D_Item_Wise_Spec_Civil_Interlinking_Desilting_of_Lake_Pkg-1.pdf
09_Vol-IV_Bid_Drawing_Interlinking_Desilting_of_Lake_Pkg-1.pdf
10_Vol-V_Cond_of_Cont_for_O_and M_Interlinking_Desilting_of_Lake_Pkg-1.pdf
11_DMO_2876_01-May-2025_273.pdf
12_GR_DOC_1.pdf
13_GR_DOC_2.pdf
08_Vol-III_Schedule-B_Interlinking_Desilting_of_Lake_Pkg-1.pdf
03_Vol-II-Part-A_Extent_of_Work_Interlinking_Desilting_of_Lake_Pkg-1.pdf
07_SBD_GUDC_Works_Price_Bid_Interlinking_Desilting_of_Lake_Pkg-1.pdf
01_SBD_GUDC_Works_Tech_Bid_Interlinking_Desilting_of_Lake_Pkg-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .