| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC Lowest bidder in the e tender |
| 2 | L2₹3.2 L+₹6,450.92 (2.06%)Rejected-AOC | ₹3.2 L+₹6,450.92 (2.06%) | L2 | Rejected-AOC Second bidder in the e tender |
| 3 | L3₹3.3 L+₹18,845.96 (6.00%)Rejected-AOC | ₹3.3 L+₹18,845.96 (6.00%) | L3 | Rejected-AOC Third bidder in the e tender |
| Sl No | Description | Qty | Unit | Jayaprakash T-Workscontractor L1 | VARUNA GLOBAL ENTERPRISES L3 | K P VASU L2 |
|---|---|---|---|---|---|---|
| 1.00RENNOVATION | ||||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 317 | sqm | 201.5 ₹63,875.5 | 188 ₹59,596 Lowest | 205.63 ₹65,184.71 |
| 1.00 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 296.4 | metre | 17.09 ₹5,065.48 | 16 ₹4,742.4 Lowest | 17.44 ₹5,169.22 |
| 1.00 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,513.06 | kilogram | 108.28 ₹1,63,833.6 Lowest | 122 ₹1,84,592.71 | 110.51 ₹1,67,207.71 |
| 1.00 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 71.06 | sqm | 403.39 ₹28,664.89 | 300 ₹21,318 Lowest | 411.65 ₹29,251.85 |
| 1.00 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | 18.2 | metre | 90.5 ₹1,647.1 Lowest | 210 ₹3,822 | 92.36 ₹1,680.95 |
| 1.01 | OD462308/2025-2026:Providing & fixing on roof pressed clay tile (Mangalore tile) with departmental of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work
complete (steel frame work to be paid separately) (MOD 12.48) | 250.32 | sqm | 197.58 ₹49,458.23 Lowest | 220 ₹55,070.4 | 201.64 ₹50,474.52 |
| 1.01 | OD462309/2025-2026:Providing & laying on roof pressed clay tile ridge using departmental material (Mangalore
tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame
work to be paid separately ).( MOD 12.49) | 27.3 | metre | 47.61 ₹1,299.75 Lowest | 130 ₹3,549 | 48.59 ₹1,326.51 |
Tender Value
₹3.4 L
EMD Value
₹8,455
Closing Date
22 Jun 2026, 3:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer, LID EW Section, Pattithara Grama Panchayat
Annual Plan-Pattithara GP 2025-26,Pr.No.47-Aloor GLPS rennovation-General Civil Work
2026_LSGD_855627_1
02/AE/LID EW/PTRA/2026-27
Open Tender
Civil Works - Buildings
Item Rate
Pattithara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,455
Yes
17 Sept 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RENNOVATION | |||||
| 1.001 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | - | sqm | - | - |
| 1.002 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 1 | metre | - | - |
| 1.003 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kilogram | - | - |
| 1.004 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | - | sqm | - | - |
| 1.005 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | 1 | metre | - | - |
| 1.006 | OD462308/2025-2026:Providing & fixing on roof pressed clay tile (Mangalore tile) with departmental of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work
complete (steel frame work to be paid separately) (MOD 12.48) | 1 | sqm | - | - |
| 1.007 | OD462309/2025-2026:Providing & laying on roof pressed clay tile ridge using departmental material (Mangalore
tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame
work to be paid separately ).( MOD 12.49) | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1446046.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1446046.xls
BOQ • 0.30 MB
affidavit.pdf
Tender Documents • 0.24 MB
epay.pdf
Other Document • 0.24 MB
pa.pdf
Tender Documents • 0.26 MB
fot.pdf
Tender Documents • 0.25 MB
ig.pdf
Other Document • 0.24 MB
sbd.pdf
Other Document • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .