Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 Cr Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | L1 | - | |
| 2 | L2₹5.5 Cr+₹20.1 L (3.80%) Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | L2 | - | |
| 3 | L3₹5.6 Cr+₹32.1 L (6.08%)Financial bid opened Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | L3 | Financial bid opened | |
| 4 | L4₹5.6 Cr+₹35.0 L (6.62%) Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | L4 | - | |
| 5 | L5₹6.5 Cr+₹1.2 Cr (22.8%) Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6) | L5 | - |
| Sl No | Description | Qty | Unit | A.K. Builders L2 | M/s Akash Electric Works L1 | GRID 2 CHIP L4 | Pradeep Garg L6 | V AutoMation System L5 | M/S VIJAY Refrigeration and Electricals L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Sub Head 1: - Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc.
Sub Head 2: - Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6). | - | - | -18 ₹5,49,14,712.02 | -21 ₹5,29,05,637.19 Lowest | -15.77 ₹5,64,08,124.31 | -1.3 ₹6,60,98,561.91 | -2.98 ₹6,49,73,480 | -16.2 ₹5,61,20,156.92 |
Tender Value
₹6.7 Cr
EMD Value
₹13.4 L
Closing Date
31 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE&SM(E )-1
R Mohan
HCESD-1, CPWD survey of India, Uppal, Hyderabad
Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management etc. Sub Head 2:- Power SCADA for all the Substation (33Kv MRSS, 11Kv MRSS, ESS-1, ESS-2, ESS-4, ESS-5 and ESS-6)
64812
04/EE&SM(E)-02/CE/IIT-TPZ/2023-24
OPEN
Electrical Works
NCB
5 months
Chittoor, Andhra Pradesh
24 documents required · 24 mandatory
₹13.4 L
Engineering Unit Office, IIT Tirupati, Yerpedu
31 Jan 2024
10 Jan 2024
31 Jan 2024
31 Jan 2024
15 Jan 2024
22 Jan 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
SCADA+IBMS+Final+NIT+.pdf
document • 1.81 MB
Corrigendum 2.pdf
document
myzipped-1-24-2024-3-19-59-pm_33KV 11KV VCB Panel.pdf
document • 2.91 MB
myzipped-1-24-2024-3-19-59-pm_11KV VCB Panel.pdf
document • 2.02 MB
myzipped-1-24-2024-3-19-59-pm_ESS 4.pdf
document • 3.93 MB
myzipped-1-24-2024-3-19-59-pm_ESS 1.pdf
document • 2.93 MB
myzipped-1-24-2024-3-19-59-pm_ESS 5.pdf
document • 3.66 MB
myzipped-1-24-2024-3-19-59-pm_ESS 6.pdf
document • 3.90 MB
myzipped-1-24-2024-3-19-59-pm_17009-33 KV GRID SUB STATION-SLD.pdf
document • 2.18 MB
myzipped-1-24-2024-3-19-59-pm_33KV Panel.pdf
document • 1.84 MB
myzipped-1-24-2024-3-19-59-pm_17009-11KV ESS-4 (PHASE-1) SLD.pdf
document • 0.69 MB
myzipped-1-24-2024-3-19-59-pm_17009-11KV ESS-6 (PHASE-1) SLD.pdf
document • 0.63 MB
myzipped-1-24-2024-3-19-59-pm_17009-11KV ESS-2 (PHASE-1) SLD.pdf
document • 0.71 MB
myzipped-1-24-2024-3-19-59-pm_17009-11KV ESS-1 (PHASE-1) SLD.pdf
document • 0.62 MB
myzipped-1-24-2024-3-19-59-pm_17009-11KV ESS-5 (PHASE-1) SLD.pdf
document • 0.62 MB
myzipped-1-24-2024-3-19-59-pm_ESS 2.pdf
document • 3.92 MB
myzipped-1-24-2024-3-19-59-pm_6542 AS BUILT DRAWING .pdf
document • 5.07 MB
myzipped-1-24-2024-3-19-59-pm_6542 AS BUILT DRAWING-2.pdf
document • 7.36 MB
myzipped-1-24-2024-3-19-59-pm_APFC Panel.pdf
document • 10.81 MB
Corrigendum 2-2.pdf
document
Corrigendum no 1.pdf
document
Corrigendum no 1-2.pdf
document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .