| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.2 LAccepted-Finance | ₹5.2 L | 1 | Accepted-Finance L1 |
| 2 | 2₹5.4 L+₹25,394.43 (4.89%)Accepted-Finance | ₹5.4 L+₹25,394.43 (4.89%) | 2 | Accepted-Finance L2 |
| 3 | 3₹5.5 L+₹27,636.36 (5.32%)Accepted-Finance | ₹5.5 L+₹27,636.36 (5.32%) | 3 | Accepted-Finance L3 |
| 4 | 4₹5.6 L+₹40,973.57 (7.89%)Accepted-Finance | ₹5.6 L+₹40,973.57 (7.89%) | 4 | Accepted-Finance L4 |
| 5 | 5₹5.8 L+₹56,213.51 (10.8%)Accepted-Finance | ₹5.8 L+₹56,213.51 (10.8%) | 5 | Accepted-Finance L5 |
Tender Value
₹6.3 L
EMD Value
₹12,520
Closing Date
18 Aug 2022, 5:00 pmClosed
Director, NERIWALM
NERIWALM Dolabari Tezpur Assam Pin 784027
Civil construction at NERIWALM Dolabari Tezpur Assam
2022_NERIW_703544_1
NRWM/CONST/298/AUDIT/2187
Open Tender
Civil Works
Item Rate
45 days
NERIWALM Dolabari Tezpur Assam
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
NERIWALM Revenue Account
₹12,520
Yes
21 Dec 2022
28 Jul 2022
20 Aug 2022
29 Jul 2022
18 Aug 2022
29 Jul 2022
Amount
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or leaner mix (i/c equivalent design mix)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Earth work in Excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. All kinds of Soil
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with sand, including finishing smooth etc. complete as per direction of Engineer?in- charge
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge. Using grade 'A' sealing compound conforming to IS: 1834 Expansion gap(1 cm gap)
12 mm cement plaster finished with a floating coat of neat cement of mix : 1: 4 (1 cement: 4 fine sand)
Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.
Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) : Rectangular manhole 90x80 cm with rectangular cover 600 x 450 mm of grade LD - 2.5
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
MOKIBUR RAHMAN
M/S A.N. ENTERPRISES
Trinayan Enterprise
Sri Gaurav Sharma
MERCANTILE SYSTEM
Kawari Kousick
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .