Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.6 LAccepted-AOC | ₹11.6 L | 1 | Accepted-AOC Lowest bidder accepted as per tender committee decion |
| 2 | 2₹12.0 LRejected-AOC | ₹12.0 L | 2 | Rejected-AOC Rejected |
| 3 | 3₹12.1 LRejected-AOC | ₹12.1 L | 3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | TROWEL Constructions Pvt. Ltd. L1 | SHAJI L2 | Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd. L3 |
|---|---|---|---|---|---|---|
| 1.00Retaining wall | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 222.75 | cum | 220 ₹49,005 Lowest | 234.43 ₹52,219.28 | 235 ₹52,346.25 |
| 1.00 | OD655/2025-2026:DRY RUBBLE MASONRY- Dry Rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Department officers at site | 199.5 | cum | 3,540 ₹7,06,230 Lowest | 3,634 ₹7,24,983 | 3,649 ₹7,27,975.5 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 70 | sqm | 340 ₹23,800 Lowest | 351.39 ₹24,597.3 | 353 ₹24,710 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,327.2 | kilogram | 97 ₹1,28,738.5 Lowest | 102.3 ₹1,35,772.66 | 103 ₹1,36,701.7 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 28 | cum | 9,000 ₹2,52,000 Lowest | 9,544.2 ₹2,67,237.6 | 9,584 ₹2,68,352 |
Tender Value
₹12.4 L
EMD Value
₹30,894
Closing Date
21 Jul 2025, 5:00 pmClosed
DISTRICT SOIL CONSERVATION OFFICER
DISTRICT SOIL CONSERVATION OFFICE WAYANAD KALPETTA CIVILSTATION
LSS-CONSTRUCTION OF DR MASONRY RETAINING WALL AT MEENANGADI 54TH MILE THODU
2025_DSSC_776316_1
DW(3)817/2025
Open Tender
Civil Works - Others
Item Rate
365 days
54TH MILE MEENANGADI
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
₹30,894
22 Aug 2025
11 Jul 2025
23 Jul 2025
13 Jul 2025
21 Jul 2025
13 Jul 2025
11 Jul 2025 - 13 Jul 2025
Amount
Retaining wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD655/2025-2026:DRY RUBBLE MASONRY- Dry Rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Department officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
SHAJI (BID ID -2254033)
Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd. (BID ID -2251165)
Bidder Name
TROWEL Constructions Pvt. Ltd.
SHAJI
Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1269129.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].