Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹7,167 (4.07%)Admitted-Finance VILL DANGADIGHILA UTTAR PARA P O BANDIPUR PS RAHARA PIN 700119 | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹12,267 (6.97%)Admitted-Finance BALIDANGRI WARD NO 5 | WEST BENGAL | L3 | Admitted-Finance | ||
| 4 | L4₹2.0 L+₹23,752 (13.5%)Admitted-Finance SUNDAR PRADHAN | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical IT not submitted upto requirement |
Tender Value
₹2.3 L
EMD Value
₹4,594
Closing Date
19 Aug 2026, 12:30 pmClosed
AE, Kandi Highway Sub-Division
Office of the AE, Kandi Highway Sub-Division Kandi, Murshidabad
Filling Pot-holes and Patch repair of surfaces with open-Graded Premix surfacing, 20mm. on Kandi Municipality road from Ch. 0.0 km to Ch. 2.0 km under Kandi Highway sub-division of Murshidabad Highway Division No. II during the year 2026-27
2026_WBPWD_5018104_1
AEKHD/NIT1Sl1-Sl2/2026-27
Open Tender
CIVIL WORKS
Percentage
15 days
Kandi
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,594
Yes
3 Sept 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using.
Case - II : Type B Providing and laying of premix sand sealcoat with HMP using approved crushed stone chipping andviscosity grade paving bitumen of suitable approved grade. | 558.53 | SuM | 105.79 | ₹59,086.89 |
| 2 | Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm. Removal o fall failed material,in the pavement courses and if necessary below the pavement,until the root causes of the failure is removed,thetrimming of completed excavation to provide firm vertical faces; specified for the pavement layer; application of tackcoat conforming to cl. 503 of MORT&H'sspecification ,on to the sides and base of excavation prior to placing hot bituminousmaterial as per clause 510 and the compaction, trimming and finishing of the surfaces of all patches to form a smooth continuous surface, level with the surrounding road as per the requirement of clause 3004.2 of MORT&H's specification . | 558.53 | Sq.m | 305.48 | ₹1,70,619.74 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.45 MB
BOQ_5089069.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .