Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹19.9 L+₹6.5 L (48.1%)Rejected-Finance | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹22.8 L+₹9.3 L (69.4%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹25.6 L+₹12.2 L (90.5%)Rejected-Finance 11 82 GROUND FLOOR BLOCK 11 KALYANPURI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | L4 | Rejected-Finance Being other than lowest | |
| 5 | L5₹26.3 L+₹12.9 L (96.1%)Rejected-Finance | L5 | Rejected-Finance Being other than lowest |
Tender Value
₹40.5 L
EMD Value
₹81,000
Closing Date
28 Aug 2020, 6:00 pmClosed
GE (AF) E/M CHAKERI KANPUR
GE (AF) E/M CHAKERI KANPUR 208008
WORK SERVICES FOR OPERATION OF PUMP HOUSE AND SLUICE VALVE AND CLEANING OF OVERHEAD TANK AND CONNECTED WORKS IN TECH AREA AT AF STN CHAKERI KANPUR
2020_MES_365680_1
8414/E8
Open Tender
Electrical Maintenance Service
Item Rate
274 days
GE (AF) E/M CHAKERI KANPUR
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) E/M CHAKERI
₹81,000
12 Sept 2020
31 Jul 2020
3 Sept 2020
31 Jul 2020
28 Aug 2020
14 Aug 2020
Amount
M&L for cleaning of 100000 Gallons capacity RCC over head tanks inside dome i.e. bottom & wall of cone 17 M to 26 M staging by De-watering through wash out pipe line, scrapping sludge and removal the same through washout pipe line and cleaning of tank by using bleaching powder and applying two coats of white wash of internal area of walls complete and writing date,month and year of cleaning of tank with white paint on black base complete all as specifed and as directed.
All as per Item no.1 above but 70000 Gallons capacity RCC Over head tank.
All as per item No 1 above but 50000 Gallons capacity RCC Over head tank .
All as per item No 1 above but 20000 Gallons capacity RCC Over head tank .
All as per item No 1 above but 10000 Gallons capacity RCC Over head tank.
Outsourcing for operation of equipments such as submersible pump , chloronome plant, DG set , Electrical panel, Sluice valve etc installed in pump houses No 24 in tech area in three shift (one operator in each shift of 08 hours) including sunday and holiday and daily routine cleaning of all equipments and installation complete all as specifed and as directed. Shift timing shall be as under:- (i) 0600 hours to 1400 hours (ii) 1400 hours to 2200 hours (iii) 2200 hours to 0600 hours
Outsourcing for operation of equipments such as submersible pump ,chloronome plant,DG set,Sluice valve etc installed in pump houses No 26 Mehra Chowk & monoblock pump set installed at ATC in tech area in three shift (one operator in each shift of 08 hours) including sunday and holiday and daily routine cleaning of all equipments and installation complete all as specifed and as directed. . Shift timing shall be as under:- (i) 0600 hours to 1400 hours (ii) 1400 hours to 2200 hours (iii) 2200 hours to 0600 hours
Outsourcing for operation of equipments such as submersible pump ,chloronome plant, DG set,sluice valve etc installed in pump houses NoS 102 & 33 at ETS in tech area in three shift (one operator in each shift of 08 hours) including sunday and holiday and daily routine cleaning of all equipments and installation complete all as specifed and as directed. Shift timing shall be as under. (i) 0600 hours to 1400 hours (ii) 1400 hours to 2200 hours (iii) 2200 hours to 0600 hours
Outsourcing for operation of equipments such as submersible pump ,chloronome plant,DG set etc installed in pump houses No 27 in tech area in three shift (one operator in each shift of 08 hours) including sunday and holiday and operation Sluice valves installed at OHT No 15,24 , 27,44 &16 in N5 & N6 Area for supply of water from over head tank in daily routine cleaning of all equipments and installation complete all as specifed and as directed. Shift timing shall be as under:- (i) 0600 hours to 1400 hours (ii) 1400 hours to 2200 hours (iii) 2200 hours to 0600 hours Shift timing for water supply timing shall be as under:- (i) 05:00 hours to 13:00 hours (ii) 13:00 hours to 2100 hours
Outsourcing for operation of equipments such as submersible pump ,chloronome plant, DG set , Electrical panel etc installed in pump houses No 31 in tech area in three shift (one operator in each shift of 08 hours) including sunday and holiday and operation Sluice valves installed at OHT No 31,101,110 in Tech Area for supply of water from over head tank, daily routine cleaning of all equipments and installation complete all as specifed and as directed. Shift timing shall be as under:- (i) 0600 hours to 1400 hours (ii) 1400 hours to 2200 hours (iii) 2200 hours to 0600 hours Shift timing for water supply timing shall be as under:- (i) 05:00 hours to 13:00 hours (ii) 13:00 hours to 2100 hours Notes against item 6 to 10 :- (a) No payment will be made if the trademen found absent and recovery @ Rs 1000/- shall be made for per shift per operator/ valveman . (b) Proper attendance register duly signed by JE & Engineer-in-charge and contractor shall be maintained. (c) Daily log sheet on prescribed format as decided by the Engineer-in-charge shall be arranged by the contractor without any extra cost and shall be submitted to the Engineer-in-charge duly signed by the trademen.The rate quoted under these item is inclusive for the same. (d) Proper uniform of trademan indicating the name of operator and firm shall be arranged by the contractor without any extra cost. Dress colour shall be approved by GE.The rate quoted under these item is inclusive for the same. (e) The trademan employed should have ITI in respective trade or minimum 10th pass having three years practical experience in the respective fields.
YS CONSTRUCTION
Kumar Electricals
Bharat Sales Corporation
GUJRAL BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .