Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | ₹15.6 L | L1 | Accepted-AOC Won the bid in lottery process as quoted rate of all the bidders are same at a par |
| 2 | L1₹15.6 LRejected-AOC | ₹15.6 L | L1 | Rejected-AOC do |
| 3 | L1₹15.6 LRejected-AOC | ₹15.6 L | L1 | Rejected-AOC do |
| 4 | L1₹15.6 LRejected-AOC | ₹15.6 L | L1 | Rejected-AOC Not win in lottery process |
| 5 | L1₹15.6 LRejected-AOC | ₹15.6 L | L1 | Rejected-AOC do |
Tender Value
₹15.6 L
EMD Value
₹15,553
Closing Date
16 Mar 2026, 5:00 pmClosed
Executive Engineer
O/o the Superintending Engineer, R.W. Division, Anandapur
Periodical Maintenance of Kumuda to Kadabahali Road Pot holes repair and SDBC from 4/500km to 5/800km for the year 2025-26
2026_CERWI_127147_1
18/EE/RWD/AND/2025-26
Open Tender
Civil Works - Roads
10 days
Salapada
Please refer tender documents
2 documents required · 2 mandatory
₹6,000
₹15,553
Yes
13 Apr 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
11 Mar 2026 - 16 Mar 2026
Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc. complete
Providing,& laying following size metal as per MOST specification for WBM to a uniform thicknes of 100mm and packing the voids with small stones and hand packing the same to proper camber including conveying and spreading crusher dust etc complete
Providing 37.5mm thick Built up spray grouting after scrapping, cleaning the road surface applying tack coat using 3.00kg of bitumen for 10sqm and laying of one layer of 37.5mm thick by using 0.45cum of 25mm to 40mm grade bitumin for 10 sqm in each layer with 0.12 cum of 12mm size B.H.G. C.B chips as key stone for 10 sqm.spreading over and laying induding heating pouring, spreading bitumirl metal and chips and compacting with P.R.R including cost ,conveyance royalty taxes of all required metterials,hire and running chsrges of mechinaries T&P etc complete as per direction of the Engineer-in-charge
Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per clause 502 of MOSRT&H Specifications for Road & Bridges work (4th Revision)
Providing & applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 of MOSRT&H Specifications for Road & Bridges work (4th Revision).
Providin & laying Semi Dense Bituminous Concret with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alingment, roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works
Please Enable Macros to View BoQ information
stage.html
html • 0.21 MB
techsummary_584740.pdf
finsummary_584740.pdf
aoc.pdf
finance_584740.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
Tendernotice_2.pdf
PDF • 3.19 MB
BOQ_584740.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid