The Executive Engineer, Division No-I, AMC
O/O the Executive Engineer, Division No-I, AMC
Development of surrounding area near open gym near Joynagar Abasan under Ward No-36, AMC
2026_SAMC_77014_1
48/EE/DIV-I/AMC/2026-27
Open Tender
Civil Works
Percentage
90 days
Agartala
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
₹10,307
18 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 42.82 | cum | 231.6 | ₹9,915.95 |
| 2 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50
m and lift upto 1.5 m | 45 | cum | 556 | ₹25,020 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand(fine) from selected quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. -(Foundation) | 15.17 | cum | 1,177.3 | ₹17,864.35 |
| 4 | Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. | 50 | sqm | 579.1 | ₹28,955 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | 3.58 | cum | 9,938.6 | ₹35,570.25 |
| 6 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ). | 18.28 | cum | 9,667.4 | ₹1,76,698.8 |
| 7 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ). | 14 | sqm | 1,291.9 | ₹18,086.6 |
| 8 | 12 mm cement plaster of mix Cement mortar 1:5 (1 cement : 5 fine sand) | 112.22 | sqm | 214 | ₹24,015.08 |
| 9 | Neat Cement Punning | 112.22 | sqm | 56.8 | ₹6,374.1 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 0.24 | cum | 11,693.5 | ₹2,806.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
DNIT48Gym.pdf
Tender Documents • 4.07 MB
BOQ_78389.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .