| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 CrAccepted-AOC | ₹23.9 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹24.5 CrRejected-AOC | ₹24.5 Cr | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹26.2 CrRejected-Finance | ₹26.2 Cr | L3 | Rejected-Finance Third Lowest |
| 4 | L4₹26.8 CrRejected-Finance | ₹26.8 Cr | L4 | Rejected-Finance Forth Lowest |
| 5 | L5₹27.1 CrRejected-Finance | ₹27.1 Cr | L5 | Rejected-Finance Fifth lowest |
| Sl No | Description | Qty | Unit | SREEDHANYA CONSTRUCTION COMPANY L4 | irikkur construction company L1 | PMR Construction Company L5 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L6 | Baab Construction india Pvt Ltd L2 | PTS HITECH PROJECTS INDIA PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SITE CLEARANCE AND DISMANTLING | |||||||||
| 1.00 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 45 | each | 600 ₹27,000 | 603.02 ₹27,135.90 | 715.78 ₹32,210.10 | 2,320 ₹1.0 L | 650 ₹29,250 | 800 ₹36,000 |
| 1.00 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | 30 | each | 1,000 ₹30,000 | 980.72 ₹29,421.60 | 1,164.11 ₹34,923.30 | 5,800 ₹1.7 L | 1,000 ₹30,000 | 1,200 ₹36,000 |
| 1.00 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm | 25 | each | 2,500 ₹62,500 | 2,052.78 ₹51,319.50 | 2,436.65 ₹60,916.25 | 9,280 ₹2.3 L | 2,200 ₹55,000 | 2,500 ₹62,500 |
| 1.00 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | 10 | each | 5,000 ₹50,000 | 4,017.23 ₹40,172.30 | 4,768.45 ₹47,684.50 | 13,920 ₹1.4 L | 4,200 ₹42,000 | 4,500 ₹45,000 |
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 2.39 | Hectare | 50,000 ₹1.2 L | 49,544.69 ₹1.2 L | 58,809.55 ₹1.4 L | 49,980 ₹1.2 L | 50,000 ₹1.2 L | 50,000 ₹1.2 L |
| 1.01 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 48.24 | cum | 1,500 ₹72,360 | 1,338.42 ₹64,565.38 | 1,588.7 ₹76,638.89 | 1,686 ₹81,332.64 | 1,400 ₹67,536 | 1,500 ₹72,360 |
| 1.01 | 2.4.3.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Brick / Tile work - In cement mortar | 20.7 | cum | 700 ₹14,490 | 658.24 ₹13,625.57 | 781.33 ₹16,173.53 | 770 ₹15,939 | 700 ₹14,490 | 1,000 ₹20,700 |
| 1.01 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 463.5 | cum | 50 ₹23,175 | 658.24 ₹3.1 L | 781.33 ₹3.6 L | 700 ₹3.2 L | 700 ₹3.2 L | 1,000 ₹4.6 L |
| 1.01 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 25.84 | cum | 700 ₹18,088 | 679.46 ₹17,557.25 | 806.52 ₹20,840.48 | 1,696 ₹43,824.64 | 700 ₹18,088 | 1,000 ₹25,840 |
Tender Value
₹22.9 Cr
EMD Value
₹5 L
Closing Date
11 Apr 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum 695033
Construction
2025_KRFB_756331_1
PWD/KR/TR/10502/2024_5_1_1/1
Open Tender
Civil Works - Roads
545 days
Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
21 Nov 2025
28 Mar 2025
15 Apr 2025
28 Mar 2025
11 Apr 2025
28 Mar 2025
4 Apr 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid