Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance Bidder is found L1 | |
| 2 | L2₹7.5 L+₹94,254.40 (14.3%)Rejected-Finance VILL ALAGAN PO BATHERI TEHSIL PADAHAR DISTT MANDI HP | MANDI | HP | L2 | Rejected-Finance Bidder is found L2 | |
| 3 | L3₹8.3 L+₹1.7 L (25.8%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | L3 | Rejected-Finance Bidder is found L3 | |
| 4 | Rejected-Technical VILLAGE KHINI P O THALOUT TEHSIL AUT DISTT MANDI HP | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | RAKESH KUMAR L3 | daulat ram L2 | Nitin Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc.in earth work in all kind of soil such as pick work, jumper work including chiseling/wedging work in dry or saturated conditions up to any depth including stacking the excavated soil serviceable and unserviceable materials separately and then in fifteen centimeters layers when required into plinth side of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil, unserviceable material and stacking the serviceable materials as directed by the Engineer-in-charge within all leads & lifts and disposed materials to be neatly leveled. | 4.83 | Per cubic metre | 350 ₹1,690.5 | 470 ₹2,270.1 | 300 ₹1,449 Lowest |
| 2.00 | Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded crushed stone aggregate 40mm.nominal size) and curing complete excluding cost of centring and shuttering in foundation and plinth by using mechanical mixer including entire carriage of material within all leads & lifts. | 8.92 | Per cubic metre | 4,000 ₹35,680 | 4,800 ₹42,816 | 3,700 ₹33,004 Lowest |
| 3.00 | Boulder filling dry hand packed tightly as in wire crate apron bund (wire crates to be measured separately) including entire carriage of material within all leads & lifts . | 11.42 | Per cubic metre | 2,200 ₹25,124 | 1,600 ₹18,272 Lowest | 1,600 ₹18,272 Lowest |
| 4.00 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm.so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 mtr. and removal of the same for insitu-reinforced concrete & plain concrete work including entire carriage of material within all leads & lifts.
Foundation, footings basis of columns etc. and mass concrete | 20.45 | Per square metre | 300 ₹6,135 | 370 ₹7,566.5 | 250 ₹5,112.5 Lowest |
| 5.00 | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded crushed stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work by using mechanical mixer & vibrator including entire carriage of material within all leads & lifts.
Foundation footings bases of columns and the like and mass concrete. | 4.09 | Per cubic metre | 5,800 ₹23,722 | 6,600 ₹26,994 | 5,400 ₹22,086 Lowest |
| 6.00 | Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete up to all floor level: tor steelincluding entire carriage of material within all leads & lifts. (Amba/Kamdhenu/Jai Bharat make) | 283.2 | Per Kilograme | 82 ₹23,222.4 Lowest | 92 ₹26,054.4 | 90 ₹25,488 |
| 7.00Providing and fixing Steel work welded in built up sections, trusses and framed work,including cutting, hoisting fixing in position and applying a priming coat of red lead paint including entire carriage of material within all leads & lifts. (Amba/Kamdhenu/Jai Bharat make) | ||||||
| 7.01 | In single stanchions composed of rolled steel joists or angles or channel with caps, bases, splices, angles brackets gratings, frame guards etc. | 8.5 | Per Quintal | 11,350 ₹96,475 | 9,800 ₹83,300 | 9,500 ₹80,750 Lowest |
| 7.02 | In trusses and trussed purlins in building. | 17.45 | Per Quintal | 11,350 ₹1,98,057.5 | 10,800 ₹1,88,460 | 9,500 ₹1,65,775 Lowest |
| 7.03 | In gratings framed guard bars, ladders, railling, brackets and similar works. | 2.85 | Per Quintal | 11,350 ₹32,347.5 | 12,800 ₹36,480 | 10,000 ₹28,500 Lowest |
Tender Value
₹4.0 L
EMD Value
₹8,040
Closing Date
6 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (C)
Executive Engineer (C)
Construction of Vehicle and Implement Shed at KVK Bajaura Distt. Kullu under CSKHPKV, Palampur.
2026_HPKV_143772_1
EE CSKHPKV NIT No.1535-40 dt 10/09/2026
Open Tender
Civil Works
Item Rate
KVK Bajaura Distt. Kullu
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
EE (C) CSKHPKV,Palampur
₹8,040
23 Oct 2026
21 Sept 2026
7 Oct 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
75 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc.in earth work in all kind of soil such as pick work, jumper work including chiseling/wedging work in dry or saturated conditions up to any depth including stacking the excavated soil serviceable and unserviceable materials separately and then in fifteen centimeters layers when required into plinth side of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil, unserviceable material and stacking the serviceable materials as directed by the Engineer-in-charge within all leads & lifts and disposed materials to be neatly leveled. | 4.83 | Per cubic metre | - | - |
| 2 | Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded crushed stone aggregate 40mm.nominal size) and curing complete excluding cost of centring and shuttering in foundation and plinth by using mechanical mixer including entire carriage of material within all leads & lifts. | 8.92 | Per cubic metre | - | - |
| 3 | Boulder filling dry hand packed tightly as in wire crate apron bund (wire crates to be measured separately) including entire carriage of material within all leads & lifts . | 11.42 | Per cubic metre | - | - |
| 4 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm.so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 mtr. and removal of the same for insitu-reinforced concrete & plain concrete work including entire carriage of material within all leads & lifts.
Foundation, footings basis of columns etc. and mass concrete | 20.45 | Per square metre | - | - |
| 5 | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded crushed stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work by using mechanical mixer & vibrator including entire carriage of material within all leads & lifts.
Foundation footings bases of columns and the like and mass concrete. | 4.09 | Per cubic metre | - | - |
| 6 | Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete up to all floor level: tor steelincluding entire carriage of material within all leads & lifts. (Amba/Kamdhenu/Jai Bharat make) | 283.2 | Per Kilograme | - | - |
| 7Providing and fixing Steel work welded in built up sections, trusses and framed work,including cutting, hoisting fixing in position and applying a priming coat of red lead paint including entire carriage of material within all leads & lifts. (Amba/Kamdhenu/Jai Bharat make) | |||||
| 7.01 | In single stanchions composed of rolled steel joists or angles or channel with caps, bases, splices, angles brackets gratings, frame guards etc. | 8.5 | Per Quintal | - | - |
| 7.02 | In trusses and trussed purlins in building. | 17.45 | Per Quintal | - | - |
| 7.03 | In gratings framed guard bars, ladders, railling, brackets and similar works. | 2.85 | Per Quintal | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_213718.xls
BOQ • 0.28 MB
sbd.pdf
Tender Documents • 4.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .