Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
25 Sept 2026, 5:00 pm2d left
EXECUTIVE OFFICER, NAC KHARIAR ROAD
EXECUTIVE OFFICER, NAC KHARIAR ROAD
CONSTRUCTION OF SMART PARK AT WARD NO 13
2026_ORULB_140554_2
3817/KHRD
Open Tender
Civil Works - Others
Percentage
KHARIAR ROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EXECUTIVE OFFICER, NAC KHARIAR ROAD
₹1.0 L
Yes
9 Sept 2026
9 Sept 2026
29 Sept 2026
9 Sept 2026
25 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 773.73 | CUM | 276.89 | ₹2,14,238.1 |
| 2 | Earth work in ordinary soil in embankments wtihin 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the department along with proper compaction with P.R.R. including hire and running charges of P.R.R. | 375 | CUM | 843.18 | ₹3,16,192.5 |
| 3 | Additional Lift | 14.83 | Cum | 26.4 | ₹391.51 |
| 4 | Supply & Filling in Foundation and Plinth with excavated materials including watering and ramming as directed by Engineer-in- charge for cum. | 89.34 | CUM | 153.83 | ₹13,743.17 |
| 5 | Supply & Filling in Foundation and Plinth with sand, well watered and rammed. | 179.23 | Cum | 506.47 | ₹90,774.62 |
| 6 | Plain Cement concrete (1:4:8) work as levelling course with 40 mm size hard granite metal. | 25.5 | Cum | 5,305.33 | ₹1,35,285.92 |
| 7 | Plain Cement concrete (1:3:6) work as levelling course with 40 mm size hard granite metal. | 77.35 | CUM | 5,673.63 | ₹4,38,855.28 |
| 8 | R.C.C. works (M-25) in foundation, footing, beams,plinth band,footing,base of columns,lintels, roofs, chhajas mass concrete etc. using 10 mm & 20 mm size black hard granite crusher broken chips including hoisting, lowering, laying and compacting, watering, curing for 28 days including centering and shuttering and finished the exposed surface smooth including all cost, conveyances, royalties and taxes of all materials and cost of labour with T & P required for the work etc. all complete in all respect but excluding cost of Steel and labour charges for bending and binding as per the Direction of the Engineer in charge. | 4.23 | CUM | 6,132.32 | ₹25,939.71 |
| 9 | FOOTINGS | 32.06 | CUM | 6,132.32 | ₹1,96,602.18 |
| 10 | COLUMNS | 14.07 | CUM | 6,132.32 | ₹86,281.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.95 MB
BOQ_608754.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .