Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹62.7 L+₹12,214.61 (0.20%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹63.3 L+₹71,725.17 (1.15%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹66.0 L+₹3.4 L (5.37%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹66.0 L+₹3.4 L (5.37%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | K.T. DEVASIA L3 | SALY PAUL KANNANTHANAM L2 | RAJEESH P P L5 | T.M IBRAHIM L6 | M.T MUHAMMED MUNAZIR L4 | MATHAI VD L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix A: Reactive Maintenance (Initial Rectification Works) | |||||||||
| 1.00 | OD126201/2026-2027:Removing the old existing Vinyl sticker works on the Display Board of Running contract and replacing the new vinyl sticker,lettering , symbols as per the new running contract as per approved drawing and directions of the engineer including transportation etc.complete. | 6 | each | 1,134.49 ₹6,806.94 | 1,123.8 ₹6,742.8 | 1,181.88 ₹7,091.28 | 1,430.57 ₹8,583.42 | 1,181.88 ₹7,091.28 | 1,121.77 ₹6,730.62 Lowest |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 7.27 | cum | 5,109.72 ₹37,157.88 | 5,061.55 ₹36,807.59 | 5,323.13 ₹38,709.8 | 6,443.25 ₹46,855.31 | 5,323.13 ₹38,709.8 | 5,052.41 ₹36,741.13 Lowest |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 4.88 | cum | 11,460.43 ₹55,892.52 | 11,352.4 ₹55,365.65 | 11,939.1 ₹58,226.99 | 14,451.37 ₹70,479.33 | 11,939.1 ₹58,226.99 | 11,331.88 ₹55,265.58 Lowest |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 7.27 | cum | 2,001.25 ₹14,553.09 | 1,982.39 ₹14,415.94 | 2,084.84 ₹15,160.96 | 2,523.54 ₹18,351.18 | 2,084.84 ₹15,160.96 | 1,978.8 ₹14,389.83 Lowest |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 4.88 | cum | 2,069.6 ₹10,093.44 | 2,050.1 ₹9,998.34 | 2,156.05 ₹10,515.06 | 2,609.73 ₹12,727.65 | 2,156.05 ₹10,515.06 | 2,046.39 ₹9,980.24 Lowest |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 118.04 | sqm | 15.74 ₹1,857.95 | 15.6 ₹1,841.42 | 16.4 ₹1,935.86 | 19.86 ₹2,344.27 | 16.4 ₹1,935.86 | 15.57 ₹1,837.88 Lowest |
| 1.01 | OD126873/2026-2027:Mix seal surfacing: Providing ,laying and rolling of close graded premixed surfacing material of
20mm compacted thickness composed of 11.2mm to 0.09mm (Type A) or 13.2mm to 0.09mm
(Type B) aggregate using bitumen VG-30 to required line,grade and level to serve as wearing | 118.04 | sqm | 284.04 ₹33,528.08 | 281.37 ₹33,212.91 | 295.91 ₹34,929.22 | 358.18 ₹42,279.57 | 295.91 ₹34,929.22 | 280.86 ₹33,152.71 Lowest |
| 2.00Appendix B : PreMonsoon Works | |||||||||
| 2.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 4.85 | Hectare | 42,057.22 ₹2,04,103.69 | 41,660.74 ₹2,02,179.57 | 43,813.79 ₹2,12,628.32 | 53,033.26 ₹2,57,370.41 | 43,813.79 ₹2,12,628.32 | 41,585.46 ₹2,01,814.24 Lowest |
Tender Value
₹75.6 L
EMD Value
₹50,000
Closing Date
16 Sept 2026, 3:00 pmClosed
Executive Engineer
Road maintenance Division Kannur
Appendix A Reactive Works Appendix B Pre monsoon Works Appendix C Proactive Works Appendix D Emergency Works
2026_PWD_867789_1
D2/TN/9/2026-27
Open Tender
Civil Works - Roads
Item Wise
Iritty
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
9 Oct 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A: Reactive Maintenance (Initial Rectification Works) | |||||
| 1.001 | OD126201/2026-2027:Removing the old existing Vinyl sticker works on the Display Board of Running contract and replacing the new vinyl sticker,lettering , symbols as per the new running contract as per approved drawing and directions of the engineer including transportation etc.complete. | 6 | each | - | - |
| 1.002 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 7.27 | cum | - | - |
| 1.003 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 4.88 | cum | - | - |
| 1.004 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 7.27 | cum | - | - |
| 1.005 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 4.88 | cum | - | - |
| 1.006 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 118.04 | sqm | - | - |
| 1.007 | OD126873/2026-2027:Mix seal surfacing: Providing ,laying and rolling of close graded premixed surfacing material of
20mm compacted thickness composed of 11.2mm to 0.09mm (Type A) or 13.2mm to 0.09mm
(Type B) aggregate using bitumen VG-30 to required line,grade and level to serve as wearing | 118.04 | sqm | - | - |
| 2Appendix B : PreMonsoon Works | |||||
| 2.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 4.85 | Hectare | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1469638.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 1.70 MB
BOQ_1469638.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .