Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.9 LAdmitted-Finance | ₹75.9 L | L1 | Admitted-Finance |
| 2 | L2₹77.1 LAdmitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹77.1 L | L2 | Admitted-Finance |
| 3 | L3₹78.7 LAdmitted-Finance | ₹78.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VERSATILE L2 | SMA ENERGY & INFRA PRIVATE LIMITED L1 | Dev Bhoomi Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.01 | Solar Monocrystalline PV module minimum 550/570 Wp for 50 KW to ensure the output. | 2 | Job | 14,96,500 ₹29.9 L | 16,50,000 ₹33 L | 15,10,000 ₹30.2 L |
| 1.02 | String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnositic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short curcuit , lightening, islanding and surge voltage competable mean in each and every sense to synchronize with UPCL grid. | 2 | No | 3,05,000 ₹6.1 L | 6,50,000 ₹13 L | 3,18,000 ₹6.4 L |
| 1.03 | Hot dipped Galvanised structure including SS nut bolts at campus of pump housecomplete with grouting by cement concrete etc. | 2 | Job | 3,99,500 ₹8.0 L | 6,53,000 ₹13.1 L | 4,08,000 ₹8.2 L |
| 1.04 | DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete | 2 | Job | 88,200 ₹1.8 L | 56,000 ₹1.1 L | 1,02,000 ₹2.0 L |
| 1.05 | ACDB box with protective devices for overload and short circuit in between invertpr and AC side | 2 | No | 1,44,000 ₹2.9 L | 1,10,000 ₹2.2 L | 1,50,000 ₹3 L |
| 1.06 | Copper bonded Lightening arrestor & surge protection. | 4 | Job | 66,500 ₹2.7 L | 25,000 ₹1 L | 60,000 ₹2.4 L |
| 1.07 | Fire extenguisher 5 Kg. | 2 | No. | 15,000 ₹30,000 | 16,500 ₹33,000 | 19,000 ₹38,000 |
| 1.08 | 03 Nos.Chemical earthing complete with 1 core 4 sqmm earth wire PVC pits etc as per IE rule | 2 | Job | 2,24,000 ₹4.5 L | 1,15,000 ₹2.3 L | 2,28,000 ₹4.6 L |
| 1.09 | Cabling work by copper 4 core AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor | 2 | Job | 3,74,000 ₹7.5 L | 1,45,000 ₹2.9 L | 3,82,000 ₹7.6 L |
| 1.10 | Miscellenious work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable , Fire safety system etc. | 2 | Job | 78,500 ₹1.6 L | 50,000 ₹1 L | 82,000 ₹1.6 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
11 Mar 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, Mechanical Circle, UPJN, Haldwani
SURVEY SUPPLY INSTALLATION TESTING AND COMMISSIONING SITC OF GRID CONNECTED ROOFTOP ON GROUND OR SUITEBLE LOCATION IN THE PREMISES OF SCHEME SOLAR PV POWER PLANT INCLUDING ALL ASSOCIATED ELECTRICAL CIVIL AND MMECHANICAL WORKS IN 1.5 MLD STP PUC
2026_MDPEY_91786_1
47 / G-7 /1 DATED 05-02-2026
Open Tender
Machineries/ Mechanical Engg Items
Haldwani
Please refer tender documents
3 documents required · 3 mandatory
₹4,720
Executive Engineer
₹1.7 L
Haldwani
16 Apr 2026
7 Feb 2026
13 Mar 2026
7 Feb 2026
11 Mar 2026
20 Feb 2026
18 Feb 2026
Solar Monocrystalline PV module minimum 550/570 Wp for 50 KW to ensure the output.
String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnositic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short curcuit , lightening, islanding and surge voltage competable mean in each and every sense to synchronize with UPCL grid.
Hot dipped Galvanised structure including SS nut bolts at campus of pump housecomplete with grouting by cement concrete etc.
DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete
ACDB box with protective devices for overload and short circuit in between invertpr and AC side
Copper bonded Lightening arrestor & surge protection.
Fire extenguisher 5 Kg.
03 Nos.Chemical earthing complete with 1 core 4 sqmm earth wire PVC pits etc as per IE rule
Cabling work by copper 4 core AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor
Miscellenious work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable , Fire safety system etc.
SITC of Data logging system (Hard ware and software) for measuring solar irradiance, temperature, AC voltage AC output current output power, energy DC input voltage DC input Current, Temperature invertor stutus, module temperature string voltage & current through GSM modem / wifi with storage of data along with display port MCS (Master Control Station)
Net metering complete as per UPCL guideline with meter box (including fixing of solar meter ) and all accessories as per site.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_108715.pdf
techsummary_108715.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Solartenderstpramnagar.pdf
Tender Documents • 1.55 MB
BOQ_108715.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid