Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹70.7 LAdmitted-Finance | -2.25% | ₹70.7 L | L1 | Admitted-Finance |
| 2 | L2₹70.9 L+₹18,801.50 (0.27%)Admitted-Finance | -1.99% | ₹70.9 L+₹18,801.50 (0.27%) | L2 | Admitted-Finance |
| 3 | L3₹71.6 L+₹86,776.15 (1.23%)Admitted-Finance | -1.05% | ₹71.6 L+₹86,776.15 (1.23%) | L3 | Admitted-Finance |
| 4 | L4₹71.6 L+₹88,945.55 (1.26%)Admitted-Finance | -1.02% | ₹71.6 L+₹88,945.55 (1.26%) | L4 | Admitted-Finance |
| 5 | L5₹71.9 L+₹1.3 L (1.78%)Admitted-Finance | -0.51% | ₹71.9 L+₹1.3 L (1.78%) | L5 | Admitted-Finance |
Tender Value
₹72.3 L
EMD Value
₹1.4 L
Closing Date
1 Jun 2026, 5:00 pmClosed
GM (CIVIL)
Main Administrative Building Sector-6 Noida
M/o Village (C/o Room/Baranda and M/o Community Center in Village Gejha Sector-93) Noida
2026_NOIDA_1150183_1
12/GM(C)/ SM (WC-8)/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
Noida
Please refer to tender documents
3 documents required · 3 mandatory
₹2,832
Noida
₹1.4 L
21 Jul 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 10 | Cum | 779.76 | ₹7,797.6 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 46 | Cum | 144.95 | ₹6,667.7 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, Consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 46 | Cum | 93 | ₹4,278 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 20 mm nominal size) | 17 | Cum | 5,746.88 | ₹97,696.96 |
| 5 | Brick work with Common Brunt clay F.P.S( Non-modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement :4 coarse sand) | 15 | Cum | 5,214.8 | ₹78,222 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 50.00 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 65 | Cum | 6,276.98 | ₹4,08,003.7 |
| 7 | Earth work in embankment in ordinary soil embankment to be in 20 cm layers breacking clods, watering, rolling each layer with 1/2 Tonne roller on wooden roller or steel rammer, rolling every third and top most layer with power or minimum 8 tonne including 1.5 m lift and all lead including cartage of earth by mechnical transportation and all T&P labour etc. required for proper completion of work. earth shall be arranged by the contractor at his own cost. | 19 | Cum | 363.05 | ₹6,897.95 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone
aggregate 20 mm nominal size) | 1 | Cum | 7,790.67 | ₹7,790.67 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 8,910 | Kg | 82.81 | ₹7,37,837.1 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 17 | Sqm | 181.64 | ₹3,087.88 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_2153531.xls
BOQ • 0.36 MB
Capability.xls
Additional Documents • 0.04 MB
TD12.pdf
Tender Documents • 2.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .