Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹43.5 L+₹86,927 (2.04%)Admitted-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | BAPATLA | ANDHRA PRADESH | 504214 | L2 | Admitted-Finance | |
| 3 | L3₹44.1 L+₹1.4 L (3.34%)Admitted-Finance D NO 4 96 40 27 FLAT NO 307 GREEN CASTLE APARTMENT GOPALAKRISHNA NAGAR SUJATHANAGAR VISAKHAPATNAM 530 051 | VISAKHAPATANAM | ANDHRA PRADESH | 530051 | L3 | Admitted-Finance | |
| 4 | L4₹44.4 L+₹1.7 L (4.04%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹47.6 L+₹4.9 L (11.5%)Admitted-Finance D NO 35 14 13 1 R P PETA KANCHARAPALEM VISAKHAPATNAM 530 008 | VISAKHAPATANAM | ANDHRA PRADESH | 530008 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MSN ENGINEERING WORKS L3 | M/S SRI VENKATA BHAVANI CONSTRUCTIONS L2 | GVR ENGINEERING WORKS L7 | MONITOR ENGINEERING WORKS L6 | M/S CHANDRA ENGINEERS AND CONTRACTORS L5 | SRI VINAYAKA INFRA L1 | PNR CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTES / INSTRUCTIONS FOR STRICT COMPLIANCE :- (a) The contractor shall obtain sample approval for all materials incorporating in the work as per condition 10 of IAFW-2249 and Special Condition 11 of tender document mentioned here-in-after. (b) The Engineer-in-charge may direct the contractor in writing to procure and deposit up to 50% quantity of the material with in 30 days from the date of commencment as required at site out of quantity to complete the scope of work. Remaining 50% shall be procured as per site requirement during progress of work.The decision shall be final and binding on the contractor. (c) The contractor shall deposit the procured material to the store of concerned subdivision within 30 days from the receipt of written direction. Failing which contractor shall liable to pay a penal recovery of Rs. 5000/- per week, levied on the dues of contractor, subject to maximum up to 10% of the work done/CA Amount whichever is higher. (d)The contractor shall obtain approval of “Qualified Tradesman” as per condition 26 of IAFW-2249 before commencement of work at site and shall have sufficient manpower such as Electrician / FGM / Technician etc., readily available to meet the site requirement during emergency situation as per directions of Engineer-in-Charge. (e) The quoted rates shall be inclusive of cost of necessary Tools, Plants, Safety Equipments, Machinery etc., as per site requirement. | ||||||||||
| 2.00 | M&L for Maintenance and attending complaints / breakdowns at CTW, INS Vishwakarma, BV Yard, SRU, CQAE and MO(V) Old area comprising of LT panels, over head lines / underground LT cables up to main distribution boards at buildings including day to day maintenance of LT panels / Perimeter lights for smooth & trouble free LT power supply including rectification of minor defects to electrical controls gear / accessories as directed by Engr-In -charge.
Note : Unit rate quoted shall deemed to be inclusive of the following:-
(a) Attending minor repairs / breakdowns without involving any new (major) materials.
(b) Rate quoted shall deemed to include cost to provide tools for attending break down and minor materials like lugs, PVC tapes, including issue / maintaining Job Cards and Complaint registers etc.
(c) Major repairs / Break downs involving S&F of materials such as cables, Joints, MCCBs etc are outside the scope of this item and shall be measured and paid separately.
(d) Contractor should ensure to carry out the work through qualified Technician / Electrician and assisted by the helper. Necessary tools & plants and transportation charges are deemed to be included in the unit rate quoted.
(e) On completion of the task /attending break down, necessary Job card duly signed by the stake holder shall be submitted to Engr-in-Charge. | 250 | Each Job | 250 ₹62,500 Lowest | 300 ₹75,000 | 900 ₹2,25,000 | 393 ₹98,250 | 250 ₹62,500 Lowest | 450 ₹1,12,500 | 300 ₹75,000 |
| 3.00 | Excavation in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out all excavated material in soft / loose soil complete all as specified and directed. | 465 | Cum | 180 ₹83,700 Lowest | 200 ₹93,000 | 210 ₹97,650 | 383 ₹1,78,095 | 250 ₹1,16,250 | 180 ₹83,700 Lowest | 220 ₹1,02,300 |
| 4.00 | Returning, filling in trenching with soil and including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and as directed. | 266 | Cum | 100 ₹26,600 | 80 ₹21,280 | 70 ₹18,620 | 93 ₹24,738 | 100 ₹26,600 | 100 ₹26,600 | 45 ₹11,970 Lowest |
| 5.00 | Removing of excavated surplus soil to a distance not exc 50 m and depositing where directed at a level n. exc. 1.5 m above the starting point complete all as specified and directed. | 199 | Cum | 100 ₹19,900 | 180 ₹35,820 | 80 ₹15,920 | 123 ₹24,477 | 200 ₹39,800 | 185 ₹36,815 | 65 ₹12,935 Lowest |
| 6.00 | M&L sand cushioning with clean and dry sand in trenches for protection of UG cable and including punning down complete all as specified and directed.
Note:- Punned thickness of sand coushioning shall only be measured and paid. | 140 | Cum | 750 ₹1,05,000 | 1,200 ₹1,68,000 | 1,050 ₹1,47,000 | 1,200 ₹1,68,000 | 900 ₹1,26,000 | 800 ₹1,12,000 | 650 ₹91,000 Lowest |
| 7.00 | Supply & laying sub class 'B', class designation 75 bricks of old size, laid over sand cushioning along alignment of cable as protection to cable in trenches including taking out old bricks complete all as specified and directed.
Note : Sand cushioning will be measured and paid seperately. | 14,967 | Each | 7 ₹1,04,769 | 6 ₹89,802 | 7.75 ₹1,15,994.25 | 5 ₹74,835 Lowest | 7 ₹1,04,769 | 10 ₹1,49,670 | 8 ₹1,19,736 |
| 8.00 | S&F for GI pipe light grade 50 mm bore galvanised steel tubing, light grade with necessary fittings, laid under road crossing, for cable protection including taking down un-serviceable GI pipe complete all as specified and directed. | 12 | RM | 500 ₹6,000 | 380 ₹4,560 Lowest | 400 ₹4,800 | 393 ₹4,716 | 400 ₹4,800 | 450 ₹5,400 | 450 ₹5,400 |
| 9.00 | All as per Sl. Item No. 8.00 here in before but of size 80 mm | 12 | RM | 650 ₹7,800 Lowest | 680 ₹8,160 | 700 ₹8,400 | 693 ₹8,316 | 700 ₹8,400 | 790 ₹9,480 | 850 ₹10,200 |
| 10.00 | M&L for cutting the tarmac / hard standings in road and excavating trenches across the road in size not exceeding 0.45 m wide and 0.6 m depth for laying cable including refilling earth & making good top surface of the disturbed portion with 100mm thick PCC 1:3:6 or bituminous mix as per existing & matching with the surroundings complete all as specified and directed.
Note :- Rate quoted shall be deemed to inclusive of Earth work excavation & PCC complete. | 12 | RM | 300 ₹3,600 | 3,100 ₹37,200 | 300 ₹3,600 | 483 ₹5,796 | 1,200 ₹14,400 | 165 ₹1,980 Lowest | 750 ₹9,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
18 Sept 2026, 6:00 pmClosed
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIR/ MAINT OF LT FEEDER PILLAR BOXES, LT UG CABLES AND CONNECTED WKS OF LT DISTR SYSTEM INCL ATTENDING FUSE OFF CALL AT CTW, INS VISHWAKARMA, BV YARD, SRU, CQAE AND MO(V) OLD AREAS UNDER AGE E/M NO-II OF GE (U-I) VISAKHAPATNAM
2026_MES_783358_1
8901/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
As per NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer Utility-I
₹90,000
Yes
30 Sept 2026
7 Aug 2026
21 Sept 2026
7 Aug 2026
18 Sept 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | M&L for Maintenance and attending complaints / breakdowns at CTW, INS Vishwakarma, BV Yard, SRU, CQAE and MO(V) Old area comprising of LT panels, over head lines / underground LT cables up to main distribution boards at buildings including day to day maintenance of LT panels / Perimeter lights for smooth & trouble free LT power supply including rectification of minor defects to electrical controls gear / accessories as directed by Engr-In -charge.
Note : Unit rate quoted shall deemed to be inclusive of the following:-
(a) Attending minor repairs / breakdowns without involving any new (major) materials.
(b) Rate quoted shall deemed to include cost to provide tools for attending break down and minor materials like lugs, PVC tapes, including issue / maintaining Job Cards and Complaint registers etc.
(c) Major repairs / Break downs involving S&F of materials such as cables, Joints, MCCBs etc are outside the scope of this item and shall be measured and paid separately.
(d) Contractor should ensure to carry out the work through qualified Technician / Electrician and assisted by the helper. Necessary tools & plants and transportation charges are deemed to be included in the unit rate quoted.
(e) On completion of the task /attending break down, necessary Job card duly signed by the stake holder shall be submitted to Engr-in-Charge. | 250 | Each Job | - | - |
| 3 | Excavation in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out all excavated material in soft / loose soil complete all as specified and directed. | 465 | Cum | - | - |
| 4 | Returning, filling in trenching with soil and including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and as directed. | 266 | Cum | - | - |
| 5 | Removing of excavated surplus soil to a distance not exc 50 m and depositing where directed at a level n. exc. 1.5 m above the starting point complete all as specified and directed. | 199 | Cum | - | - |
| 6 | M&L sand cushioning with clean and dry sand in trenches for protection of UG cable and including punning down complete all as specified and directed.
Note:- Punned thickness of sand coushioning shall only be measured and paid. | 140 | Cum | - | - |
| 7 | Supply & laying sub class 'B', class designation 75 bricks of old size, laid over sand cushioning along alignment of cable as protection to cable in trenches including taking out old bricks complete all as specified and directed.
Note : Sand cushioning will be measured and paid seperately. | 14,967 | Each | - | - |
| 8 | S&F for GI pipe light grade 50 mm bore galvanised steel tubing, light grade with necessary fittings, laid under road crossing, for cable protection including taking down un-serviceable GI pipe complete all as specified and directed. | 12 | RM | - | - |
| 9 | All as per Sl. Item No. 8.00 here in before but of size 80 mm | 12 | RM | - | - |
| 10 | M&L for cutting the tarmac / hard standings in road and excavating trenches across the road in size not exceeding 0.45 m wide and 0.6 m depth for laying cable including refilling earth & making good top surface of the disturbed portion with 100mm thick PCC 1:3:6 or bituminous mix as per existing & matching with the surroundings complete all as specified and directed.
Note :- Rate quoted shall be deemed to inclusive of Earth work excavation & PCC complete. | 12 | RM | - | - |
| 11 | Supply & laying LT XLPE insulated, armoured heavy duty electric cable with alumimium conductor, 1100 volts grade, cross sectional area 25 Sqmm x 4 Core, laid in trenches / duct / on pole including taking down existing un-serviceable cable complete all as specified and directed. | 200 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_877669.xls
BOQ • 0.67 MB
8901Tender.pdf
Tender Documents • 0.83 MB
amdt3.pdf
PDF • 0.19 MB
8901Corrigendum2.pdf
PDF • 0.19 MB
8901Corrigendum2.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .