| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-AOC | L1 | Accepted-AOC aoc is awarded due to l1 | |
| 2 | L2₹36.5 L+₹89,055.94 (2.50%)Rejected-AOC 819 1 GALI NO 10 PHOOLBAG COLONY MEERUT UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L2 | Rejected-AOC aoc is not awarded due to L2 | |
| 3 | L3₹39.9 L+₹4.4 L (12.2%)Rejected-Finance | L3 | Rejected-Finance L3 IS ACCEPTED DUE TO L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
1 Feb 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
OFFICE OF THE Superintending Engineer MADHYA GANGA CANAL CONSTUCTION CIRCLE BULANDSHAHAR
CONSTRUCTION OF FALL AT KM. 6.200 OF HASANPUR DY
2025_UPIDC_993437_7
01/SE/2024-25
Open Tender
Civil Works - Canal
Item Rate
180 days
Hasanpur(Amroha)
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.0 L
27 Feb 2025
27 Jan 2025
1 Feb 2025
27 Jan 2025
1 Feb 2025
27 Jan 2025
27 Jan 2025 - 1 Feb 2025
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work.
Cement Concrete in (1:2:4) M15 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work
Cutting, Bending, Binding & Placing in position of steel reinforcement (above 10mm dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc.
Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Centering & Shuttering for all C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying Porous cement concrete in 1:0:4 in Jhiris of C.C. Blocks including cost of all material, labour, T&P, etc. as per directed by engineer in charge complete for proper completion of work
Provide & Laying Boulder 40 to 70 kg.wt in bed & sides with all lead and lift including cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge.
Provide & Laying of Boulder (20 to 40 mm)for pitching in side slopes including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Provide & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of Local sand as back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of 2 to 4 mm thick Pea Gravel below CC Block including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of 4 to 10 mm thick Stone Grit below CC Block including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Provide & Fixing year plate size (300mmx300mmx25mm) for completion of work or as Directed By Engineer in Charge.
Provide & Fixing B.M plate size (200mmx200mmx25mm) for completion of work or as Directed By Engineer in Charge.
SINGHWAL INDUSTRIES (BID ID -4899305)
Sath Shaib Associates (BID ID -4899093)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .