Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹2.5 L
Closing Date
9 Mar 2026, 3:00 pmClosed
Intensive Upper Gear attention during SS-I Schedule in Coaching Depot, Visakhapatnam
eT-SrDME-WAT-330-2026~ECOR
eT-SrDME-WAT-330-2026
Open
Works - General
24 Months
Visakhapatanam, Andhra Pradesh
₹0
₹2.5 L
9 Mar 2026
12 Feb 2026
23 Feb 2026
A-Intensive Upper Gear attention during SS-I Schedule in Coaching
Stripping and fitment of LP sheet in coaches. Square
Removal of old PVC and laying new PVC in Non-AC Coaches. Square
Removal of old PVC and laying new PVC in AC coaches.
Stripping and fitment of Window glasses in Non-AC coaches.
Stripping and fitment of Window Glasses in AC coaches. Square
Stripping and fitment of Compreg Ply in Non -AC coaches. Square
Stripping and fitment of Compreg Ply in AC coaches.
Removal of old berth and fitment of new berth of Long seat type-2
Removal of old Single seat type-2 and fitment of new Single sear type-2.
Removal of old Seat & Back rest type-3 and fitment of new Seat & Back rest type-3.
Dismantling, repair and fitment of body side door.
Dismantling, repair and fitment of Luggage sliding door
Dismantling, repair and fitment of UIC Vestubule.
Over Head tank of 455 ltrs. Or Under Slung water tank of 650 ltrs. To Dismantle. Repair and re-fitment of water tank
Over Head small water tank of 30 ltrs. To Dismantle, repair and re-fitment of water tank
Repairing of water leakage below RMPU unit of LHB AC coaches.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].