| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC Committee approved rates as L1 | |
| 2 | L2₹1.6 L+₹8,900 (5.94%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.7 L+₹15,300 (10.2%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
14 May 2020, 5:00 pmClosed
SE EUDC BAREILLY
35-B,RAMPUR GARDEN , Bareilly
For the work Giving new Connection of 240 LW /227 KVA to Shri Prem Yadav S/o Shri Hori Lal Yadav , Near Green Park , Bisalpur Road , Bareilly , Giving New Connection of 30 KW (H.P-1) ,to The Institute of Charted Accountant of India , Bareilly Bra
2020_MVVNL_467800_1
T-05/EUDCB/2020-21
Open Tender
Electrical Works
Item Wise
30 days
EE EUDD-IV BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹1,500
18 Aug 2020
9 May 2020
15 May 2020
9 May 2020
14 May 2020
9 May 2020
Amount
For the work Giving new Connection of 240 LW /227 KVA to Shri Prem Yadav S/o Shri Hori Lal Yadav , Near Green Park , Bisalpur Road , Bareilly , under Full Deposited Fund -2020-21, under EUDD-IV, Bareilly
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- ST Pole 11 mtr. Long- 02 No. b- 11 KV XLPE Cable (3X70 SQMM)-140 Mtr. c- Cable Box 11 kv O/D Type (3x70 sqmm)- 08 Nos. d- Other associated materials-250 Kgs
Erection of D / Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of 11 KV XLPE Cable (3X70 sqmm)
Erection of Stay Set Complete .
Erathing of Poles .
Erection of Cable Box 11 KV O/D type (3x70) sqmm.
Erection of 11 KV Pilfer Proof metering Cubical .
Fixing of associated Items i.e T/off Channel with Clamp -02 nos, Top Channel- 01 Nos. , Dropper Channel - 01 No. 11 KV Disc Insulator -03 Nos. 11 KV Pin with nuts-03 Nos. etc.
For the work Giving New Connection of 30 KW (H.P-1) ,to The Institute of Charted Accountant of India , Bareilly Branch , 7/4 Awas Vikas ,(Poket B) , Nawada Jogiyan ,Bareilly under Full Deposited Fund -2020-21, under EUDD-IV, Bareilly .
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- S T Pole 11 mtr. Long- 02 No. b- 63 KVA T/F -01 No. c- 11 KV XLPE Cable(3X70 sqmm.)- 130 mtr. d- ACSR Dog Conductor – 60 Mtr. e- Other associated materials-500 Kgs
Erection of D / Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of 60 mtr. ACSR Dog conductor for jumpering .
Mounting of 63 KVA T/F on D/pole alongwith fitting of all accessories and connections.
Laying of 11 KV XLPE Cable (3x70 sqmm) in double circuit .
Fixing of associated Items i.e 11 KV Pin Insulator- 06 Nos. , 11 KV PIN with nuts – 06 Nos. , 11 KV Disc Insulator -06 Nos. 11 KV Disc Fitting -06 Nos. etc.
For the work Giving new Connection to Shri Ratan Pal Singh S/o Shri Chawi Nath , near Maharshi Bidhya Mandir School , Pilibhit Bye pass Road, Bareilly Full Deposited Fund -2020-21, under EUDD-IV, Bareilly .
Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a- 11 KV XLPE Cable (3x120 sqmm)- 60 mtr. b- Cable Box 11 KV (3x120 Sqmm) – 04 No. c- 11 KV pilfer Proof Metering cubical- 01 Nos. d- 11 KV CT & PT Unit- 01 Nos. d- d- Other associated materials-250 Kgs
Laying of 11 KV XLPE Cable (3x120 sqmm).
Erection and Fixing of 11 KV Cable Box (3x120 sqmm)
Erection of 11 KV Pilfer Proof metering Cubical.
Erection and Fixing of 11 KV CT & PT unit 30/5A
Khare Enterprises,
joshi electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .